Dedicated Freight Corridor Corporation Of India Limited invites bids for a Self-Propelled Light Weight Motor Trolley procurement. The data lacks project location, quantity, and value details, and no BOQ items are listed. A key feature is the Purchaser’s option to increase/decrease quantity by up to 25%, with extended delivery time calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Bidders must comply with prevailing GST treatment and potential contract termination for non-performance, non-compliance, or insolvency. The tender emphasizes certificate uploads as a bid condition and requires bidders to meet financial health criteria. This procurement sits under the railway-focused government framework, with DFCCIL’s structured bid process guiding participation in the Indian market.
Option-based quantity adjustments up to 25% during and after contract
GST responsibility lies with bidder; reimbursement as actuals or capped rate
Contract termination rights for non-performance or misrepresentation
GST to be paid as per actuals or the quoted rate; no automatic premium; bidder bears GST assessment
Delivery timeline linked to original order; additional time calculated via option clause formula with minimum 30 days
Contractor termination rights exist for delivery delays, non-compliance, or misrepresentation
No liquidation or insolvency status; provide an undertaking
Demonstrated ability to participate in railway-procurement projects
GST registration and compliance readiness
Quantity
3
Bid Type
Single Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Self-Propelled Light Weight Motor Trolley
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Sikar
Delivery Pincodes
332715
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Devendra Singh | 332715,New Shrimadhopur Station Dedicated Freight Corridor Corporation of India Ltd. Near to Malakali Village | Sikar | Rajasthan | 332715 | 3 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates showing relevant railway procurement experience
Financial statements demonstrating financial health
EMD/Security deposit documentation (if applicable in terms)
Technical bid documents and certifications
OEM authorizations or agency agreements (if applicable)
Key insights about RAJASTHAN tender market
Bidders must submit GST registration, PAN, financial statements, and experience certificates; attach OEM authorizations if applicable, and upload all required technical and bid documents. Ensure the option clause is understood: quantity may swing ±25% with adjusted delivery time, minimum 30 days; confirm GST treatment per tender terms.
Prepare GST certificate, PAN, company financials, experience certificates for railway-scale projects, EMD documents if applicable, technical bid, and OEM authorizations. Upload certificates as specified in Terms and Conditions and ensure non-liquidation undertaking is included.
Delivery time extends proportionally with the additional quantity: (Additional quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days; the purchaser may extend this to cover the total original delivery period.
The tender does not specify standards; bidders should prepare to demonstrate ISI/ISO-style compliance and railway-grade certification as applicable to self-propelled trolleys, and be ready to provide technical compliance certificates during bid submission.
Contract termination may occur for material breach, failure to deliver, insolvency, misrepresentation, or failure to replace/rework defective material; the buyer reserves the right to terminate with written notice for non-performance.
Bidders must assess GST applicability themselves; DFCCIL will reimburse GST as actuals or as per the lower quoted rate, subject to the maximum GST percentage quoted by the bidder.
Bidder must not be in liquidation or bankruptcy; demonstrate financial stability with supporting documents; provide prior railway or heavy equipment procurement experience; ensure GST registration and corporate documentation are complete.
The data does not specify OEM brands; bidders should secure OEM authorization or agency agreements if required and be ready to demonstrate manufacturer-backed compliance during evaluation.