A tender has been published for N/a clarification fabrication work 1, clarification fabrication work 2, clarification fabrication work 3, clarification fabrication work 4, clarification fabrication work 5, clarification fabrication work 6, clarification fabrication work 7, clarification fabrication work 8, clarification fabrication work 9, clarification fabrication work 10, clarification fabrication work 11, clarification fabrication work 12, clarification fabrication work 13, clarification fabrication work 14, clarification fabrication work 15, clarification fabrication work 16, clarification fabrication work 17, clarification fabrication work 18, clarification fabrication work 19, clarification fabrication work 20, clarification fabrication work 21, clarification fabrication work 22, clarification fabrication work 23, clarification fabrication work 24, clarification fabrication work 25, clarification fabrication work 26, clarification fabrication work 27, clarification fabrication work 28, clarification fabrication work 29, clarification fabrication work 30, clarification fabrication work 31, clarification fabrication work 32, clarification fabrication work 33, clarification fabrication work 34, clarification fabrication work 35, clarification fabrication work 36, clarification fabrication work 37, clarification fabrication work 38, clarification fabrication work 39, clarification fabrication work 40, clarification fabrication work 41 in BIJNOR, UTTAR PRADESH. Quantity: 483 by. Submission Deadline: 04-09-2026 17: 00: 00. Check eligibility and apply.
Quantity
483
Category
clarification fabrication work 1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
clarification fabrication work 1 , clarification fabrication work 2 , clarification fabrication work 3 , clarification fabrication work 4 , clarification fabrication work 5 , clarification fabrication work 6 , clarification fabrication work 7 , clarification fabrication work 8 , clarification fabrication work 9 , clarification fabrication work 10 , clarification fabrication work 11 , clarification fabrication work 12 , clarification fabrication work 13 , clarification fabrication work 14 , clarification fabrication work 15 , clarification fabrication work 16 , clarification fabrication work 17 , clarification fabrication work 18 , clarification fabrication work 19 , clarification fabrication work 20 , clarification fabrication work 21 , clarification fabrication work 22 , clarification fabrication work 23 , clarification fabrication work 24 , clarification fabrication work 25 , clarification fabrication work 26 , clarification fabrication work 27 , clarification fabrication work 28 , clarification fabrication work 29 , clarification fabrication work 30 , clarification fabrication work 31 , clarification fabrication work 32 , clarification fabrication work 33 , clarification fabrication work 34 , clarification fabrication work 35 , clarification fabrication work 36 , clarification fabrication work 37 , clarification fabrication work 38 , clarification fabrication work 39 , clarification fabrication work 40 , clarification fabrication work 41
Advisory Bank
PUNJAB NATIONAL BANK
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Bijnor
Delivery Pincodes
246763
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anurag Singh | 246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612 | Bijnor | Uttar Pradesh | 246763 | 78 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
clarification fabrication work 1
Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (8inch).
clarification fabrication work 2
Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (6inch).
clarification fabrication work 3
Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (4inch).
clarification fabrication work 4
Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (3inch).
clarification fabrication work 5
Fabricating and installing bends at various locations in the clarification house (8inch).
clarification fabrication work 6
Fabricating and installing bends at various locations in the clarification house (6inch).
clarification fabrication work 7
Fabricating and installing bends at various locations in the clarification house (4inch).
clarification fabrication work 8
Fabricating and installing bends at various locations in the clarification house (3inch).
clarification fabrication work 9
Fabricating and installing flanges at various locations in the clarification house (8inch).
clarification fabrication work 10
Fabricating and installing flanges at various locations in the clarification house (6inch).
clarification fabrication work 11
Fabricating and installing flanges at various locations in the clarification house (4inch).
clarification fabrication work 12
Fabricating and installing flanges at various locations in the clarification house (3inch).
clarification fabrication work 13
Fabricating and installing flanges at various locations in the clarification house (2inch).
clarification fabrication work 14
Fabricating and installing nipples at various locations in the clarification house (6inch).
clarification fabrication work 15
Fabricating and installing nipples at various locations in the clarification house (4inch).
clarification fabrication work 16
Fabricating and installing nipples at various locations in the clarification house (3inch).
clarification fabrication work 17
Opening and closing valves at various locations in the clarification house (8inch).
clarification fabrication work 18
Opening and closing valves at various locations in the clarification house (6inch).
clarification fabrication work 19
Opening and closing valves at various locations in the clarification house (4inch).
clarification fabrication work 20
Opening and closing valves at various locations in the clarification house (3inch).
clarification fabrication work 21
Opening and closing valves at various locations in the clarification house (2inch).
clarification fabrication work 22
Fabricating and installing reducers at various locations in the clarification house (8inch).
clarification fabrication work 23
Fabricating and installing reducers at various locations in the clarification house (6inch).
clarification fabrication work 24
Fabricating and installing tees at various locations in the clarification house (8inch).
clarification fabrication work 25
Fabricating and installing tees at various locations in the clarification house (6inch).
clarification fabrication work 26
Fabricating and installing tees at various locations in the clarification house (4inch).
clarification fabrication work 27
Fabricating and installing tees at various locations in the clarification house (3inch).
clarification fabrication work 28
Dismantling the damaged tower, top, base and cell and taking them outside to the scrap yard, and fabricating them as before with 8/10 mm plate and making the related connection nipple, manhole, partition plate, band, pipeline, etc. connections as before and giving a leak-proof satisfactory trial. L.S. cell size diameter 2.3 m x 6.85 m height tower L.S. size 1.65 m diameter x 2.4 m height
clarification fabrication work 29
Cutting and removing the heavy/light filtrate juice tank installed on the small vacuum filter (approx. diameter 1.0 m, height 1.5 m), fabricating a new tank from 10 mm plate matching the original, installing all related nipples, flanges, pipelines, etc., and conducting a trial.
clarification fabrication work 30
Cutting and removing the heavy/light filtrate juice tank installed on the large vacuum filter (approx. diameter 1.5 m, height 1.0 m), fabricating a new tank from 10 mm plate matching the original, installing all related nipples, flanges, pipelines, etc., and conducting a trial.
clarification fabrication work 31
Cutting the intermediate mud tray of clarifier compartment No. 4 and putting them in the scrap yard, making and fitting new ones from 08/10 mm plate, making supports with angle and channel, making and fitting a 150 mm ring, and completing all related work including welding and giving a leak-proof trial. Size& Clarifier dia 10 m.
clarification fabrication work 32
Cutting the damaged flash tank installed at the clarifier, taking it outside and placing it in the scrap yard, and fabricating it with 8/10 mm plates, as well as fabricating a siphon with 12 INCH/14INCH size pipes. Fabricating a 2 m long U-bend and chimney, etc., and erecting them at the respective locations, and completing all related work including welding and giving a trial. Size-Diameter 2.0 m, Height 2.2 m
clarification fabrication work 33
Cutting and removing the existing recovery tower of the juice sulphiter, placing it in the scrap yard, and carrying out fabrication and erection work using 8/10 mm plates, completing all related works along with welding and giving a satisfactory trial. Size Diameter 1.5 m, Length 5.50 m.
clarification fabrication work 34
Cutting and removing the top gutter of both lime tanks and fabricating and installing new ones from 8/10 mm thick plate. Scrap to be disposed of in the scrap yard. Approximate length 4 m.
clarification fabrication work 35
Cutting and removing the coils and all related angles installed in the clarifier compartment, reinstalling them at their original positions after completion of the work, and conducting a satisfactory trial.
clarification fabrication work 36
Patching inside the clarifier with 6/8 mm MS plate.
clarification fabrication work 37
Cutting and removing the damaged 6inch header of the syrup pump, fabricating and installing a new one, fitting all related nipples, valves, etc., and conducting a satisfactory trial.
clarification fabrication work 38
Cutting and removing the damaged portion of the mud tray of the large filter, disposing of the scrap in the scrap yard, fabricating and installing a replacement from 8/10 mm thick plate, and conducting a satisfactory trial. Size diameter 3.75 m, length 8.60 m.
clarification fabrication work 39
Cutting and removing the corroded box of the clear juice liquidation tank near the door, fabricating a new box by bending the supplied 8 mm plate, completing all connections, and conducting a satisfactory trial. Size diameter 1.00 m, length 1.00 m.
clarification fabrication work 40
Installing, fitting, aligning, and conducting a satisfactory trial of the MS band for the clear juice pump and motor (120 HP).
clarification fabrication work 41
Cutting and removing the corroded mud boot of the clarifier compartment, disposing of the scrap in the scrap yard, fabricating and installing a new mud boot from the supplied 6/8 mm plate, completing all related work, and conducting a satisfactory trial.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | clarification fabrication work 1 | Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (8inch). | 78 | pcdm | buyer10.cdgvvdup.up | 60 | |
| 2 | clarification fabrication work 2 | Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (6inch). | 120 | pcdm | buyer10.cdgvvdup.up | 60 | |
| 3 | clarification fabrication work 3 | Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (4inch). | 66 | pcdm | buyer10.cdgvvdup.up | 60 | |
| 4 | clarification fabrication work 4 | Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (3inch). | 36 | pcdm | buyer10.cdgvvdup.up | 60 | |
| 5 | clarification fabrication work 5 | Fabricating and installing bends at various locations in the clarification house (8inch). | 10 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 6 | clarification fabrication work 6 | Fabricating and installing bends at various locations in the clarification house (6inch). | 5 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 7 | clarification fabrication work 7 | Fabricating and installing bends at various locations in the clarification house (4inch). | 5 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 8 | clarification fabrication work 8 | Fabricating and installing bends at various locations in the clarification house (3inch). | 10 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 9 | clarification fabrication work 9 | Fabricating and installing flanges at various locations in the clarification house (8inch). | 5 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 10 | clarification fabrication work 10 | Fabricating and installing flanges at various locations in the clarification house (6inch). | 25 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 11 | clarification fabrication work 11 | Fabricating and installing flanges at various locations in the clarification house (4inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 12 | clarification fabrication work 12 | Fabricating and installing flanges at various locations in the clarification house (3inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 13 | clarification fabrication work 13 | Fabricating and installing flanges at various locations in the clarification house (2inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 14 | clarification fabrication work 14 | Fabricating and installing nipples at various locations in the clarification house (6inch). | 12 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 15 | clarification fabrication work 15 | Fabricating and installing nipples at various locations in the clarification house (4inch). | 2 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 16 | clarification fabrication work 16 | Fabricating and installing nipples at various locations in the clarification house (3inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 17 | clarification fabrication work 17 | Opening and closing valves at various locations in the clarification house (8inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 18 | clarification fabrication work 18 | Opening and closing valves at various locations in the clarification house (6inch). | 5 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 19 | clarification fabrication work 19 | Opening and closing valves at various locations in the clarification house (4inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 20 | clarification fabrication work 20 | Opening and closing valves at various locations in the clarification house (3inch). | 6 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 21 | clarification fabrication work 21 | Opening and closing valves at various locations in the clarification house (2inch). | 3 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 22 | clarification fabrication work 22 | Fabricating and installing reducers at various locations in the clarification house (8inch). | 2 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 23 | clarification fabrication work 23 | Fabricating and installing reducers at various locations in the clarification house (6inch). | 2 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 24 | clarification fabrication work 24 | Fabricating and installing tees at various locations in the clarification house (8inch). | 4 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 25 | clarification fabrication work 25 | Fabricating and installing tees at various locations in the clarification house (6inch). | 10 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 26 | clarification fabrication work 26 | Fabricating and installing tees at various locations in the clarification house (4inch). | 6 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 27 | clarification fabrication work 27 | Fabricating and installing tees at various locations in the clarification house (3inch). | 10 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 28 | clarification fabrication work 28 | Dismantling the damaged tower, top, base and cell and taking them outside to the scrap yard, and fabricating them as before with 8/10 mm plate and making the related connection nipple, manhole, partition plate, band, pipeline, etc. connections as before and giving a leak-proof satisfactory trial. L.S. cell size diameter 2.3 m x 6.85 m height tower L.S. size 1.65 m diameter x 2.4 m height | 1 | each | buyer10.cdgvvdup.up | 60 | |
| 29 | clarification fabrication work 29 | Cutting and removing the heavy/light filtrate juice tank installed on the small vacuum filter (approx. diameter 1.0 m, height 1.5 m), fabricating a new tank from 10 mm plate matching the original, installing all related nipples, flanges, pipelines, etc., and conducting a trial. | 2 | each | buyer10.cdgvvdup.up | 60 | |
| 30 | clarification fabrication work 30 | Cutting and removing the heavy/light filtrate juice tank installed on the large vacuum filter (approx. diameter 1.5 m, height 1.0 m), fabricating a new tank from 10 mm plate matching the original, installing all related nipples, flanges, pipelines, etc., and conducting a trial. | 2 | each | buyer10.cdgvvdup.up | 60 | |
| 31 | clarification fabrication work 31 | Cutting the intermediate mud tray of clarifier compartment No. 4 and putting them in the scrap yard, making and fitting new ones from 08/10 mm plate, making supports with angle and channel, making and fitting a 150 mm ring, and completing all related work including welding and giving a leak-proof trial. Size& Clarifier dia 10 m. | 1 | lumpsum | buyer10.cdgvvdup.up | 60 | |
| 32 | clarification fabrication work 32 | Cutting the damaged flash tank installed at the clarifier, taking it outside and placing it in the scrap yard, and fabricating it with 8/10 mm plates, as well as fabricating a siphon with 12 INCH/14INCH size pipes. Fabricating a 2 m long U-bend and chimney, etc., and erecting them at the respective locations, and completing all related work including welding and giving a trial. Size-Diameter 2.0 m, Height 2.2 m | 1 | each | buyer10.cdgvvdup.up | 60 | |
| 33 | clarification fabrication work 33 | Cutting and removing the existing recovery tower of the juice sulphiter, placing it in the scrap yard, and carrying out fabrication and erection work using 8/10 mm plates, completing all related works along with welding and giving a satisfactory trial. Size Diameter 1.5 m, Length 5.50 m. | 1 | each | buyer10.cdgvvdup.up | 60 | |
| 34 | clarification fabrication work 34 | Cutting and removing the top gutter of both lime tanks and fabricating and installing new ones from 8/10 mm thick plate. Scrap to be disposed of in the scrap yard. Approximate length 4 m. | 4 | meter | buyer10.cdgvvdup.up | 60 | |
| 35 | clarification fabrication work 35 | Cutting and removing the coils and all related angles installed in the clarifier compartment, reinstalling them at their original positions after completion of the work, and conducting a satisfactory trial. | 8 | each | buyer10.cdgvvdup.up | 60 | |
| 36 | clarification fabrication work 36 | Patching inside the clarifier with 6/8 mm MS plate. | 10 | meter square | buyer10.cdgvvdup.up | 60 | |
| 37 | clarification fabrication work 37 | Cutting and removing the damaged 6inch header of the syrup pump, fabricating and installing a new one, fitting all related nipples, valves, etc., and conducting a satisfactory trial. | 2 | each header | buyer10.cdgvvdup.up | 60 | |
| 38 | clarification fabrication work 38 | Cutting and removing the damaged portion of the mud tray of the large filter, disposing of the scrap in the scrap yard, fabricating and installing a replacement from 8/10 mm thick plate, and conducting a satisfactory trial. Size diameter 3.75 m, length 8.60 m. | 1 | lumpsum | buyer10.cdgvvdup.up | 60 | |
| 39 | clarification fabrication work 39 | Cutting and removing the corroded box of the clear juice liquidation tank near the door, fabricating a new box by bending the supplied 8 mm plate, completing all connections, and conducting a satisfactory trial. Size diameter 1.00 m, length 1.00 m. | 1 | each | buyer10.cdgvvdup.up | 60 | |
| 40 | clarification fabrication work 40 | Installing, fitting, aligning, and conducting a satisfactory trial of the MS band for the clear juice pump and motor (120 HP). | 1 | per hp | buyer10.cdgvvdup.up | 60 | |
| 41 | clarification fabrication work 41 | Cutting and removing the corroded mud boot of the clarifier compartment, disposing of the scrap in the scrap yard, fabricating and installing a new mud boot from the supplied 6/8 mm plate, completing all related work, and conducting a satisfactory trial. | 2 | lumpsum | buyer10.cdgvvdup.up | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer