TenderDekho Logo
Active GEM

Government Tender Published for clarification fabrication work 1,clarification fabrication work 2,clarification fabrication work 3, in BIJNOR, UTTAR PRADESH

Bid Publish Date

25-Aug-2026, 4:13 pm

Bid End Date

04-Sep-2026, 5:00 pm

EMD

₹7,000

Value

₹6,60,000

Location

BIJNOR , UTTAR PRADESH

Progress

Issue25-Aug-2026, 4:13 pm
AwardPending

A tender has been published for N/a clarification fabrication work 1, clarification fabrication work 2, clarification fabrication work 3, clarification fabrication work 4, clarification fabrication work 5, clarification fabrication work 6, clarification fabrication work 7, clarification fabrication work 8, clarification fabrication work 9, clarification fabrication work 10, clarification fabrication work 11, clarification fabrication work 12, clarification fabrication work 13, clarification fabrication work 14, clarification fabrication work 15, clarification fabrication work 16, clarification fabrication work 17, clarification fabrication work 18, clarification fabrication work 19, clarification fabrication work 20, clarification fabrication work 21, clarification fabrication work 22, clarification fabrication work 23, clarification fabrication work 24, clarification fabrication work 25, clarification fabrication work 26, clarification fabrication work 27, clarification fabrication work 28, clarification fabrication work 29, clarification fabrication work 30, clarification fabrication work 31, clarification fabrication work 32, clarification fabrication work 33, clarification fabrication work 34, clarification fabrication work 35, clarification fabrication work 36, clarification fabrication work 37, clarification fabrication work 38, clarification fabrication work 39, clarification fabrication work 40, clarification fabrication work 41 in BIJNOR, UTTAR PRADESH. Quantity: 483 by. Submission Deadline: 04-09-2026 17: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

483

Category

clarification fabrication work 1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

clarification fabrication work 1 , clarification fabrication work 2 , clarification fabrication work 3 , clarification fabrication work 4 , clarification fabrication work 5 , clarification fabrication work 6 , clarification fabrication work 7 , clarification fabrication work 8 , clarification fabrication work 9 , clarification fabrication work 10 , clarification fabrication work 11 , clarification fabrication work 12 , clarification fabrication work 13 , clarification fabrication work 14 , clarification fabrication work 15 , clarification fabrication work 16 , clarification fabrication work 17 , clarification fabrication work 18 , clarification fabrication work 19 , clarification fabrication work 20 , clarification fabrication work 21 , clarification fabrication work 22 , clarification fabrication work 23 , clarification fabrication work 24 , clarification fabrication work 25 , clarification fabrication work 26 , clarification fabrication work 27 , clarification fabrication work 28 , clarification fabrication work 29 , clarification fabrication work 30 , clarification fabrication work 31 , clarification fabrication work 32 , clarification fabrication work 33 , clarification fabrication work 34 , clarification fabrication work 35 , clarification fabrication work 36 , clarification fabrication work 37 , clarification fabrication work 38 , clarification fabrication work 39 , clarification fabrication work 40 , clarification fabrication work 41

Advisory Bank

PUNJAB NATIONAL BANK

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Bijnor

Delivery Pincodes

246763

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612BijnorUttar Pradesh2467637860-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9794825.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 41 Items Sign in for GEM prices

#1

clarification fabrication work 1

Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (8inch).

78 pcdm Delivery: 60 days
#2

clarification fabrication work 2

Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (6inch).

120 pcdm Delivery: 60 days
#3

clarification fabrication work 3

Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (4inch).

66 pcdm Delivery: 60 days
#4

clarification fabrication work 4

Dismantling damaged pipelines at various locations in the clarification house, placing the scrap in the scrap yard, and installing new pipelines (3inch).

36 pcdm Delivery: 60 days
#5

clarification fabrication work 5

Fabricating and installing bends at various locations in the clarification house (8inch).

10 pcdn Delivery: 60 days
#6

clarification fabrication work 6

Fabricating and installing bends at various locations in the clarification house (6inch).

5 pcdn Delivery: 60 days
#7

clarification fabrication work 7

Fabricating and installing bends at various locations in the clarification house (4inch).

5 pcdn Delivery: 60 days
#8

clarification fabrication work 8

Fabricating and installing bends at various locations in the clarification house (3inch).

10 pcdn Delivery: 60 days
#9

clarification fabrication work 9

Fabricating and installing flanges at various locations in the clarification house (8inch).

5 pcdn Delivery: 60 days
#10

clarification fabrication work 10

Fabricating and installing flanges at various locations in the clarification house (6inch).

25 pcdn Delivery: 60 days
#11

clarification fabrication work 11

Fabricating and installing flanges at various locations in the clarification house (4inch).

4 pcdn Delivery: 60 days
#12

clarification fabrication work 12

Fabricating and installing flanges at various locations in the clarification house (3inch).

4 pcdn Delivery: 60 days
#13

clarification fabrication work 13

Fabricating and installing flanges at various locations in the clarification house (2inch).

4 pcdn Delivery: 60 days
#14

clarification fabrication work 14

Fabricating and installing nipples at various locations in the clarification house (6inch).

12 pcdn Delivery: 60 days
#15

clarification fabrication work 15

Fabricating and installing nipples at various locations in the clarification house (4inch).

2 pcdn Delivery: 60 days
#16

clarification fabrication work 16

Fabricating and installing nipples at various locations in the clarification house (3inch).

4 pcdn Delivery: 60 days
#17

clarification fabrication work 17

Opening and closing valves at various locations in the clarification house (8inch).

4 pcdn Delivery: 60 days
#18

clarification fabrication work 18

Opening and closing valves at various locations in the clarification house (6inch).

5 pcdn Delivery: 60 days
#19

clarification fabrication work 19

Opening and closing valves at various locations in the clarification house (4inch).

4 pcdn Delivery: 60 days
#20

clarification fabrication work 20

Opening and closing valves at various locations in the clarification house (3inch).

6 pcdn Delivery: 60 days
#21

clarification fabrication work 21

Opening and closing valves at various locations in the clarification house (2inch).

3 pcdn Delivery: 60 days
#22

clarification fabrication work 22

Fabricating and installing reducers at various locations in the clarification house (8inch).

2 pcdn Delivery: 60 days
#23

clarification fabrication work 23

Fabricating and installing reducers at various locations in the clarification house (6inch).

2 pcdn Delivery: 60 days
#24

clarification fabrication work 24

Fabricating and installing tees at various locations in the clarification house (8inch).

4 pcdn Delivery: 60 days
#25

clarification fabrication work 25

Fabricating and installing tees at various locations in the clarification house (6inch).

10 pcdn Delivery: 60 days
#26

clarification fabrication work 26

Fabricating and installing tees at various locations in the clarification house (4inch).

6 pcdn Delivery: 60 days
#27

clarification fabrication work 27

Fabricating and installing tees at various locations in the clarification house (3inch).

10 pcdn Delivery: 60 days
#28

clarification fabrication work 28

Dismantling the damaged tower, top, base and cell and taking them outside to the scrap yard, and fabricating them as before with 8/10 mm plate and making the related connection nipple, manhole, partition plate, band, pipeline, etc. connections as before and giving a leak-proof satisfactory trial. L.S. cell size diameter 2.3 m x 6.85 m height tower L.S. size 1.65 m diameter x 2.4 m height

1 each Delivery: 60 days
#29

clarification fabrication work 29

Cutting and removing the heavy/light filtrate juice tank installed on the small vacuum filter (approx. diameter 1.0 m, height 1.5 m), fabricating a new tank from 10 mm plate matching the original, installing all related nipples, flanges, pipelines, etc., and conducting a trial.

2 each Delivery: 60 days
#30

clarification fabrication work 30

Cutting and removing the heavy/light filtrate juice tank installed on the large vacuum filter (approx. diameter 1.5 m, height 1.0 m), fabricating a new tank from 10 mm plate matching the original, installing all related nipples, flanges, pipelines, etc., and conducting a trial.

2 each Delivery: 60 days
#31

clarification fabrication work 31

Cutting the intermediate mud tray of clarifier compartment No. 4 and putting them in the scrap yard, making and fitting new ones from 08/10 mm plate, making supports with angle and channel, making and fitting a 150 mm ring, and completing all related work including welding and giving a leak-proof trial. Size& Clarifier dia 10 m.

1 lumpsum Delivery: 60 days
#32

clarification fabrication work 32

Cutting the damaged flash tank installed at the clarifier, taking it outside and placing it in the scrap yard, and fabricating it with 8/10 mm plates, as well as fabricating a siphon with 12 INCH/14INCH size pipes. Fabricating a 2 m long U-bend and chimney, etc., and erecting them at the respective locations, and completing all related work including welding and giving a trial. Size-Diameter 2.0 m, Height 2.2 m

1 each Delivery: 60 days
#33

clarification fabrication work 33

Cutting and removing the existing recovery tower of the juice sulphiter, placing it in the scrap yard, and carrying out fabrication and erection work using 8/10 mm plates, completing all related works along with welding and giving a satisfactory trial. Size Diameter 1.5 m, Length 5.50 m.

1 each Delivery: 60 days
#34

clarification fabrication work 34

Cutting and removing the top gutter of both lime tanks and fabricating and installing new ones from 8/10 mm thick plate. Scrap to be disposed of in the scrap yard. Approximate length 4 m.

4 meter Delivery: 60 days
#35

clarification fabrication work 35

Cutting and removing the coils and all related angles installed in the clarifier compartment, reinstalling them at their original positions after completion of the work, and conducting a satisfactory trial.

8 each Delivery: 60 days
#36

clarification fabrication work 36

Patching inside the clarifier with 6/8 mm MS plate.

10 meter square Delivery: 60 days
#37

clarification fabrication work 37

Cutting and removing the damaged 6inch header of the syrup pump, fabricating and installing a new one, fitting all related nipples, valves, etc., and conducting a satisfactory trial.

2 each header Delivery: 60 days
#38

clarification fabrication work 38

Cutting and removing the damaged portion of the mud tray of the large filter, disposing of the scrap in the scrap yard, fabricating and installing a replacement from 8/10 mm thick plate, and conducting a satisfactory trial. Size diameter 3.75 m, length 8.60 m.

1 lumpsum Delivery: 60 days
#39

clarification fabrication work 39

Cutting and removing the corroded box of the clear juice liquidation tank near the door, fabricating a new box by bending the supplied 8 mm plate, completing all connections, and conducting a satisfactory trial. Size diameter 1.00 m, length 1.00 m.

1 each Delivery: 60 days
#40

clarification fabrication work 40

Installing, fitting, aligning, and conducting a satisfactory trial of the MS band for the clear juice pump and motor (120 HP).

1 per hp Delivery: 60 days
#41

clarification fabrication work 41

Cutting and removing the corroded mud boot of the clarifier compartment, disposing of the scrap in the scrap yard, fabricating and installing a new mud boot from the supplied 6/8 mm plate, completing all related work, and conducting a satisfactory trial.

2 lumpsum Delivery: 60 days

Categories 45

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer