Indian Oil Corporation Limited Top Mounted Temperature Controller Tender Mathura Uttar Pradesh 2026

Bid Publish Date

14-Sep-2026, 12:54 pm

Bid End Date

19-Oct-2026, 12:00 pm

Generate Docs

Progress

Issue14-Sep-2026, 12:54 pm
Corrigendum12-Oct-2026
AwardPending

Key Highlights

  • • Specific clause: quantity variation up to 25% during contract and currency of contract
  • • Mandatory certificate uploads as per Bid Document and ATC
  • • Scope limited to 'Only supply of Goods' with no installation or services mentioned
  • • Delivery time anchored to original delivery order with optional extension formula

Tender Overview

Organization: Indian Oil Corporation Limited, Location: Mathura, Uttar Pradesh, 281001. Procurement: supply of Top Mounted Temperature Controller. Scope: Bid price to include all costs for the goods; delivery terms allow quantity variation up to 25% at contracted rates. Context: Government-style procurement through GEM portal with ATC terms; emphasis on certificate uploads for bidder acceptance. Unique element includes option clause for quantity adjustments during contract execution. No BOQ items listed, indicating a potentially broad or undefined itemization at this stage.

Technical Specifications & Requirements

  • Product name: Top Mounted Temperature Controller (no further technical specs published).
  • Quantity/Value context: No BOQ items; estimated value and EMD not disclosed.
  • Delivery framework: Delivery period linked to original delivery order; extended time formula applies if option clause is exercised (minimum 30 days, calculated as (increased quantity/original quantity) × original delivery period).
  • Standards/Certifications: Not specified in the provided data; bidders must upload certificates requested in bid document/ATC.
  • Supply scope: “Only supply of Goods” per ATC; no services, installation, or after-sales included based on current terms.
  • Special terms: Procurement under GEM with quantity flex up to 25% during contract; delivery commenced after last date of original order.

Terms, Conditions & Eligibility

  • EMD/Financials: Not disclosed in the available data; terms require submission of certificates as per Bid document and ATC.
  • Delivery deadlines: Delivery schedule follows last date of original delivery order; extended delivery time calculated per option clause with minimum 30 days.
  • Payment terms: Not specified in the provided data.
  • Documentation: Mandatory upload of all requested certificates/documents; OEM authorizations if applicable per ATC.
  • Clause backdrop: Purchaser reserves right to increase/decrease quantity by up to 25% at bid/contract stage; bidders must comply with ATC terms.

Key Specifications

  • Product/service: Top Mounted Temperature Controller

  • Quantity/Estimated value: Not disclosed

  • EMD amount: Not disclosed

  • Standards/Certification: Not specified in data

  • Delivery: Based on last date of original delivery order; extended duration formula

  • Warranty/Support: Not specified

Terms & Conditions

  • Quantity fluctuation up to 25% at contract placement and during currency

  • Delivery timeline follows original order date with formula-based extension

  • Mandatory submission of certificates and OEM authorizations as per ATC

Important Clauses

Payment Terms

Not specified in data; payment terms to be defined in ATC and GEM bid document

Delivery Schedule

Delivery begins from last date of original delivery order; extended delivery time uses (increased quantity/original quantity) × original period with a minimum of 30 days

Penalties/Liquidated Damages

Not specified in data

Bidder Eligibility

  • Eligible bidders must submit all certificates as per ATC

  • Demonstrate capability to supply temperature control equipment

  • Comply with 25% quantity variance clause during contract

Advertisement

Tender Data

Bid Details

Quantity

8

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SUPPLY OF TOP MOUNTED TEMPERATURE CONTROLLER

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

56

Delivery Locations

1

Delivery Cities

Mathura

Delivery Pincodes

281005

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Som Datt281005,Mathura Refinery Indian Oil CorporationMathuraUttar Pradesh281005856-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9889826.pdf

Main Document

Other Documents

OTHER

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Iocl Mathura Refinery

Grievance Contact

[email protected]

Corrigendum Updates

3 Updates
#1

Update

12-Oct-2026

Extended Deadline

19-Oct-2026, 6:30 am

Opening Date

20-Oct-2026, 6:30 am

#2

Update

05-Oct-2026

Extended Deadline

12-Oct-2026, 6:30 am

Opening Date

13-Oct-2026, 6:30 am

#3

Update

28-Sep-2026

Extended Deadline

05-Oct-2026, 6:30 am

Opening Date

06-Oct-2026, 6:30 am

Advertisement

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates in similar equipment supply

4

Financial statements showing financial stability

5

EMD/Security deposit documents (if required by ATC)

6

Technical bid documents demonstrating product conformity

7

OEM authorization letters (if bidding as Authorized Distributor)

8

Any certificates as requested in Bid Document/ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for IOC temperature controller tender in Mathura 2026

Bidders must register on GEM and upload all required certificates per ATC, including GST, PAN, and technical proofs. The scope is limited to the supply of goods for a top mounted temperature controller; ensure you meet the 25% quantity variation clause and compliant delivery timelines.

What documents are required for IOC temperature controller bid in Mathura

Submit GST certificate, PAN, experience certificates in similar supplies, financial statements, EMD documents (if required), technical compliance certificates, and OEM authorizations. Upload all certificates as per Bid Document and ATC to avoid rejection.

What are the delivery terms for IOC top mounted temperature controller tender

Delivery is calculated from the last date of the original delivery order. If quantity increases, the extended duration uses (increased quantity/original quantity) × original period, with a minimum extension of 30 days.

What is the eligibility for supplying temperature controllers to IOC Mathura

Applicants must show the ability to supply temperature control equipment, provide relevant experience certificates, and comply with GEM ATC terms, including the 25% quantity variation and certificate uploads.

What standards or certifications are required for IOC temperature controller tender

No specific standards are listed in the provided data. Bid documents/ATC will specify required certifications; ensure submission of all requested certificates and OEM authorizations when applicable.

When is the bid submission deadline for IOC temperature controller Mathura

Exact submission dates are not provided here. Bidders should monitor the GEM portal, ensure all required certificates are uploaded, and prepare to meet delivery timelines as per the original delivery order.

How is the 25% quantity variation clause applied in IOC tender

The purchaser may increase or decrease order quantity up to 25% at contract placement or during currency, at contracted rates; bidders must price accordingly and plan for supply delta handling.

What documents are needed for OEM authorization in IOC bid

If bidding as an authorized distributor, provide OEM authorization letters, verify product conformity to temperature controller specifications, and attach them with other certificates per ATC guidelines.

Advertisement