Bid Publish Date
14-Sep-2026, 12:54 pm
Bid End Date
19-Oct-2026, 12:00 pm
Location
Progress
Organization: Indian Oil Corporation Limited, Location: Mathura, Uttar Pradesh, 281001. Procurement: supply of Top Mounted Temperature Controller. Scope: Bid price to include all costs for the goods; delivery terms allow quantity variation up to 25% at contracted rates. Context: Government-style procurement through GEM portal with ATC terms; emphasis on certificate uploads for bidder acceptance. Unique element includes option clause for quantity adjustments during contract execution. No BOQ items listed, indicating a potentially broad or undefined itemization at this stage.
Product/service: Top Mounted Temperature Controller
Quantity/Estimated value: Not disclosed
EMD amount: Not disclosed
Standards/Certification: Not specified in data
Delivery: Based on last date of original delivery order; extended duration formula
Warranty/Support: Not specified
Quantity fluctuation up to 25% at contract placement and during currency
Delivery timeline follows original order date with formula-based extension
Mandatory submission of certificates and OEM authorizations as per ATC
Not specified in data; payment terms to be defined in ATC and GEM bid document
Delivery begins from last date of original delivery order; extended delivery time uses (increased quantity/original quantity) × original period with a minimum of 30 days
Not specified in data
Eligible bidders must submit all certificates as per ATC
Demonstrate capability to supply temperature control equipment
Comply with 25% quantity variance clause during contract
Quantity
8
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SUPPLY OF TOP MOUNTED TEMPERATURE CONTROLLER
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
56
Delivery Locations
1
Delivery Cities
Mathura
Delivery Pincodes
281005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Som Datt | 281005,Mathura Refinery Indian Oil Corporation | Mathura | Uttar Pradesh | 281005 | 8 | 56 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
TECHNICAL
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
19-Oct-2026, 6:30 am
Opening Date
20-Oct-2026, 6:30 am
Extended Deadline
12-Oct-2026, 6:30 am
Opening Date
13-Oct-2026, 6:30 am
Extended Deadline
05-Oct-2026, 6:30 am
Opening Date
06-Oct-2026, 6:30 am
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates in similar equipment supply
Financial statements showing financial stability
EMD/Security deposit documents (if required by ATC)
Technical bid documents demonstrating product conformity
OEM authorization letters (if bidding as Authorized Distributor)
Any certificates as requested in Bid Document/ATC
Key insights about UTTAR PRADESH tender market
Bidders must register on GEM and upload all required certificates per ATC, including GST, PAN, and technical proofs. The scope is limited to the supply of goods for a top mounted temperature controller; ensure you meet the 25% quantity variation clause and compliant delivery timelines.
Submit GST certificate, PAN, experience certificates in similar supplies, financial statements, EMD documents (if required), technical compliance certificates, and OEM authorizations. Upload all certificates as per Bid Document and ATC to avoid rejection.
Delivery is calculated from the last date of the original delivery order. If quantity increases, the extended duration uses (increased quantity/original quantity) × original period, with a minimum extension of 30 days.
Applicants must show the ability to supply temperature control equipment, provide relevant experience certificates, and comply with GEM ATC terms, including the 25% quantity variation and certificate uploads.
No specific standards are listed in the provided data. Bid documents/ATC will specify required certifications; ensure submission of all requested certificates and OEM authorizations when applicable.
Exact submission dates are not provided here. Bidders should monitor the GEM portal, ensure all required certificates are uploaded, and prepare to meet delivery timelines as per the original delivery order.
The purchaser may increase or decrease order quantity up to 25% at contract placement or during currency, at contracted rates; bidders must price accordingly and plan for supply delta handling.
If bidding as an authorized distributor, provide OEM authorization letters, verify product conformity to temperature controller specifications, and attach them with other certificates per ATC guidelines.