Progress
Hindustan Aeronautics Limited (HAL) under the Department of Defence Production seeks a conference table from the Make-Durian line, with OEM authorization required. The tender mandates submission of PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate certified by the bank. An OEM authorization letter from Make Durian is mandatory, or the bid may be rejected. The clause on quantity allows a ±50% adjustment at award and during currency, at contracted rates. GST will be reimbursed at actuals or applicable rates, capped by the quoted GST percentage. This procurement involves a single high-value furniture item with specific vendor-code prerequisites and no BOQ items listed.
OEM authorization letter from Make Durian is mandatory for bid validity
GST reimbursement will follow actuals or applicable rates, subject to quoted GST
Option clause permits up to 50% quantity variation during award and contract period
GST handling as actuals or applicable rates; no explicit advance terms noted
Delivery period adjustments based on the option clause; minimum 30 days extension rule
Not specified in available data; relies on option-based delivery extension
Must supply OEM authorization letter from Make Durian
Must provide PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank
Vendor-code creation documentation required for participation
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CONFERENCE TABLE MAKE-DURIAN
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
BANGALORE CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | BANGALORE CITY | BANGALORE CITY | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
- Copy of PAN Card
- Copy of GSTIN
- Copy of Cancelled Cheque
- EFT Mandate certified by Bank
- OEM authorization letter from Make Durian (mandatory with bid)
- Any vendor-code creation documents as required by HAL
Key insights about KARNATAKA tender market
Bidders must attach an OEM authorization letter from Make Durian, along with PAN, GSTIN, Cancelled Cheque, and bank-certified EFT mandate. Ensure GST is treated per actuals or applicable rates, not to exceed the quoted GST percentage. Include vendor-code creation documents to participate.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, and OEM authorization letter from Make Durian. These must accompany the bid to validate eligibility and activate the vendor code for the HAL tender.
The bidder can be awarded up to 50% more or less than the bid quantity, with the extension period calculated as (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
The tender requires the Make Durian brand with an OEM authorization letter. No other brands are specified as substitutes; ensure the letter is attached to the bid.
GST reimbursement will be provided as actuals or at applicable rates, whichever is lower, and cannot exceed the quoted GST percentage on the bid. Attach GSTIN and ensure GST terms are clear in the bid.
Delivery extension follows the option clause formula, with a minimum 30-day extension. The new delivery period is computed from the last delivery date and adjusted per the proportional quantity change.
The OEM authorization letter from Make Durian is mandatory; without it, the bid may be summary rejected. Ensure official letterhead, signer authorization, and validity on bid submission date.