Protective Eye Goggles (MHA)
Uttar Pradesh Police
Bid Publish Date
17-Feb-2026, 10:53 am
Bid End Date
28-Feb-2026, 10:00 am
Location
Progress
Quantity
900
Bid Type
Single Packet Bid
Southern Railway invites bids for the Protective Eye Goggles under the MHA QR specification, with supply of goods as the scope. The contract accommodates an option to increase/decrease quantity by up to 25%, and aggregate turnover of ₹5 Crores is required for eligibility, based on last three financial years. Bidders must upload a warranty certificate and ensure submission of required financials on GeM. The tender emphasizes inclusion of additional specification parameters beyond the core tech specs and requires on-demand test reports. This procurement is positioned under Indian Railways’ protective gear program and targets compliant eye protection equipment. Unique aspects include the MHA QR verification requirement and a flexible delivery window tied to option quantities. The procurement process is conducted through GeM with emphasis on post-quotation warranty documentation and aggregate turnover evidence.
Protective Eye Goggles as specified under MHA QR
Test Report to be furnished on demand
Scope: Supply of Goods only
Additional specification parameters may influence evaluation
Warranty certificate required with supply
25% quantity variation permitted at contract placement and during currency at contracted rates
Aggregate turnover minimum ₹5 Crore over last 3 financial years
Warranty certificate to be submitted with supply; test reports on demand
Not explicitly provided in excerpt; ensure adherence to GeM standard payment terms and contract-specific conditions
Delivery period governed by option clause; additional time = (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not specified in excerpt; bidders should expect standard GeM/L1 penalties compliant with Indian Railways contracts
Average annual turnover ≥ ₹5 Crore over the last 3 financial years
Demonstrated supply of protective eye PPE or similar PPE in prior contracts
Compliance with MHA QR specifications or ability to meet QR verifications on demand
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Uttar Pradesh Police
Indian Coast Guard
DAKSHINA KANNADA, KARNATAKA
Telangana State Police Department
Rangareddi, TELANGANA
North Eastern Railway
BAREILLY, UTTAR PRADESH
N/a
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| SPECIFICATION | Technical Specification Of the Protective Eye Goggles | Conformity MHA QR for Protective Eye Goggles, issued by MHA vide No. IV-21011/31/2009-Prov-I Dated-21.07.09 |
| SPECIFICATION | Availability of MHA QR Of Protective Eye Goggles | Yes |
| SPECIFICATION | Seen and Understood MHA QR of Protective Eye Goggles | Yes |
| TEST REPORT | Test Report to be furnished to the buyer on demand | Yes, No |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experiences certificates for similar PPE supply
Audited financial statements for the last 3 years or CA certificate indicating turnover
Test reports for the protective eye goggles (on demand)
Warranty certificate post-supply
OEM authorization (if applicable)
Bid security/EMD as per GeM guidelines
Technical bid documents demonstrating MHA QR compliance (if available)
Key insights about TAMIL NADU tender market
Bidders must meet turnover criteria of ₹5 Crore average over 3 years, submit GST, PAN, and experience certificates, and provide on-demand test reports. Ensure GeM registration, OEM authorizations if required, and warranty certificate submission with the supply.
Required documents typically include GST certificate, PAN card, experience certificates for PPE supply, audited financial statements or CA turnover certificate, test reports on demand, warranty certificate, OEM authorization (if applicable), and EMD as per GeM guidelines.
Scope is strictly the supply of goods (protective eye goggles). Installation or maintenance services are not included; the bidder must deliver ready-for-use goggles meeting MHA QR requirements and provide on-demand test reports.
Delivery time follows the option clause: increased quantity time = (increased quantity / original quantity) × original delivery period, with a minimum extension of 30 days; extensions may be capped by the original delivery period.
A warranty certificate must be provided per GeM terms, and test reports may be demanded post-supply. Ensure the goggles comply with MHA QR standards and include warranty support details for at least the contract duration.
Bidder should prepare for MHA QR verification and compliance; exact standard numbers are not listed in the excerpt, but QR compliance and on-demand test reports are emphasized for evaluation.
The buyer may increase or decrease quantity up to 25% at contracted rates, affecting delivery timing; the schedule must align with the extended delivery calculated per the option clause.
Applicants must demonstrate an average annual turnover of ₹5 Crore over the last three financial years, supported by audited balance sheets or CA certificate uploaded with the bid.
Uranium Corporation Of India Limited
📍 EAST SINGHBHUM, JHARKHAND
Maharashtra State Police
📍 MUMBAI, MAHARASHTRA
Forest Department
📍 THANE, MAHARASHTRA
Central Board Of Excise And Customs (cbec)
📍 NEEMUCH, MADHYA PRADESH
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS