Tender Overview
Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for 11 or 33 kV Outdoor Live Tank Current Transformer (BHEL) in Ghaziabad, Uttar Pradesh. Estimated value is ₹997,100 with an EMD of ₹9,000. The contract allows a 25% quantity variation at the awarded rates and requires online EMD/PBG mechanisms. A Buyer uploaded ATC governs procurement terms, including delivery schedule aligned to last delivery order date and extended periods. The project focuses on high-voltage current transformers meeting specified technical standards and conformity testing, leveraging a robust risk-mitigated supply chain for municipal power distribution infrastructure.
Technical Specifications & Requirements
- Product category: Outdoor Live Tank Current Transformer for 11/33 kV systems, as per BHEL specification, with conformity to listed technical requirements.
- Test Reports: Availability of test reports proving product conformity to specification.
- EMD: ₹9,000, payable via online RTGS/IBAN to the specified UPPTCL account; include transfer proof in bid.
- Delivery window & option clause: Delivery period starts after the original order; quantity may increase by up to 25% in currency and contract quantity with a minimum extension of 30 days; timelines adjusted accordingly.
- Security: Performance security can be furnished as PBG or FDR in favor of UP Power Transmission Corporation Limited Meerut; original FDR delivery within 15 days of award.
- BOQ: No BOQ items listed; scope centers on supply of CTs with required approvals and conformity.
Terms, Conditions & Eligibility
- EMD: ₹9,000; payable online or via bank transfer with bid submission proof.
- Delivery: As per ATC terms; extended delivery allowed via option clause with minimum 30 days.
- Payment terms: To be clarified in ATC; usually against delivery/delivery milestones and securing performance.
- Warranty/Support: ATC details govern warranty and post-contract support; ensure conformity with IS/BS standards and OEM authorizations.
- Documents: GST, PAN, experience, financial statements, EMD proof, OEM authorization (if required).
- Penalties: Liquidated damages as per GeM/GTC and ATC provisions; ensure adherence to delivery timelines.