Bid Publish Date
08-Oct-2026, 10:56 am
Bid End Date
19-Oct-2026, 10:00 am
Location
Progress
The Uttar Pradesh Cooperative Sugar Factories Federation Limited seeks procurement of DIGITAL LOAD CELL 10 TON WITH MOUNTING ASSEMBLY (4 PCS), a DIGITIZER DIGITAL MAKE TRIX, and related conversion fabrication work to reconfigure a single load cell into a 4-load cell base at the organization’s facility. The estimated value and exact quantities are not disclosed in the data, but the package includes multiple components and potential assembly work to enable four-load cell operation. The primary differentiator is the explicit inclusion of a TRIX digitizer and mounting assemblies for a 10-ton system, with fabrication work to convert a single load cell setup into a four-load cell configuration.
Product: DIGITAL LOAD CELL 10 TON with mounting assemblies (4 PCS)
Component: DIGITIZER DIGITAL MAKE TRIX
Work: conversion fabrication to convert one load cell into a 4-LOADCELL BASED configuration
Delivery/Installation: on-site assembly, calibration, and integration with TRIX digitizer
Compliance: ensure compatibility with standard load cell interfaces and TRIX digitizer input
Integrity pact compliance is mandatory for all bidders
EMD payable via RTGS/online; submission proof required
Delivery timeline and payment terms to be finalized; ensure on-site fabrication readiness
EMD via RTGS/online to specified bank; bid submission must include payment proof and reference to the bid number and entity name
On-site fabrication, installation, and calibration of a 4-load cell base with TRIX digitizer; exact timelines to be defined in contract
LD provisions to be defined in contract; bidders should anticipate standardGovernment procurement LD norms
Proven ability to retrofit load cells and integrate digital instrumentation
Demonstrated project experience with TRIX digitizers or equivalent
Financial credibility demonstrated via audited statements
Quantity
15
Category
DIGITAL LOAD CELL 10TON WITH MOUNTING ASSEMBLY 4 PCS
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
DIGITAL LOAD CELL 10TON WITH MOUNTING ASSEMBLY 4 PCS , DIGITIZER DIGITAL MAKE TRIX , CONVERSION FABRICATION WORK FOR OUT CENTER W B CONVERT ONE LOADCELL TO 4 LOADCELL BASED
Advisory Bank
State Bank of India
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Pilibhit
Delivery Pincodes
262122
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jitendra Sharma | 262122,The Kisan Sahakari chini mill Puranpur, Pilibhit (U.P) Pin Code -262122 GST NO- 09AABAT6173F1ZC MAIL ID- [email protected] Contact number.9027472683 | Pilibhit | Uttar Pradesh | 262122 | 5 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for load cell retrofits and digital instrumentation projects
Financial statements (last 2-3 years)
EMD submission proof (online transfer receipts)
Technical bid documents detailing proposed 10 TON load cell, mounting assemblies, and TRIX digitizer
OEM authorizations or product datasheets for TRIX digitizer and mounting hardware
Signed integrity pact
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD proof via RTGS to the given Kishan Sahkari Chini Mills bank account. Include signed integrity pact and OEM authorizations for TRIX digitizer; ensure on-site fabrication capability and calibration plan.
Required documents include GST certificate, PAN, experience certificates for retrofits, last 3 years financial statements, online EMD transfer proof, technical bid detailing 10-ton load cell and 4-assembly mounting, and OEM authorizations for TRIX digitizer.
Key specs include compatibility with 10-ton digital load cell, mounting assemblies for four cells, on-site calibration, and integration with the TRIX digital digitizer. Ensure data interface compatibility and calibration procedures are documented.
Delivery and on-site installation are to be performed after contract award; exact timelines will be defined in the purchase order and project schedule, including calibration and acceptance testing.
EMD details are not disclosed in the data; bidders should prepare standard bid security via RTGS with reference to the bid submission and upload proof with the bid.
No explicit standards published; bidders should propose IS/DS compatibility for load cells and any applicable DIN/ISO references, and provide OEM TRIX documentation for digitizer compatibility.
Submit a scanned signed integrity pact as per Buyer policy along with bid; ensure all sections are completed and the document is notarized if required by the procuring entity.
Mounting assemblies are required to convert one load cell to a 4-load cell configuration; specify four mounting kits, alignment fixtures, fasteners, and any required shims in the technical bid.