Progress
Konkan Railway Corporation Limited invites bids for Rail Thermometer Bi metallic magnetic base, Gauge cum Level for B G with Sprit Level as per RDSO Drg, Versine Measuring Kit Model No VK1, Spirit level for Gauge cum Level confirming to RDSO, Chamfering kit to Specification no TM53 in SOUTH GOA, GOA. Quantity: 169. Submission Deadline: 04-09-2026 14: 00: 00. Submit your proposal before the deadline.
Quantity
169
Category
Gauge cum Level for B G with Sprit Level as per RDSO Drg
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
40 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Rail Thermometer Bi metallic magnetic base , Gauge cum Level for B G with Sprit Level as per RDSO Drg , Versine Measuring Kit Model No VK1 , Spirit level for Gauge cum Level confirming to RDSO , Chamfering kit to Specification no TM53
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
South Goa
Delivery Pincodes
403601
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mohammad Nurani Saied | 403601,SENIOR MATERIALS MANAGER STORES DEPOT QUEPEM ROAD OPP ESI HOSPITAL MADGAON GOA 403601 GSTIN :30AAACK3725H1Z1 | South Goa | Goa | 403601 | 60 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Rail Thermometer Bi metallic magnetic base
Rail Thermometer Bi metallic magnetic base rail therometer AS per RDSO Specification No TM67 of January 2002 Rev 01 of 2010 section
Gauge cum Level for B G with Sprit Level as per RDSO Drg
Gauge cum Level for B G with Sprit Level as per RDSO Drg No TM 108 and Sprit Level No TM2004 confirming to Specification No TM58 and TM52
Versine Measuring Kit Model No VK1
Versine Measuring Kit Model No VK1 of MS PIE Pvt Ltd OR similar consisting of a pair of versine holders versine scale nylon cord and winder complete in box
Spirit level for Gauge cum Level confirming to RDSO
Spirit level for Gauge cum Level confirming to RDSO drawing noTM 2004 and as per specification no TM52
Chamfering kit to Specification no TM53
Chamfering kit to Specification no TM53 latest revision
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Rail Thermometer Bi metallic magnetic base | Rail Thermometer Bi metallic magnetic base rail therometer AS per RDSO Specification No TM67 of January 2002 Rev 01 of 2010 section | 60 | pieces | ammmao | 21 | |
| 2 | Gauge cum Level for B G with Sprit Level as per RDSO Drg | Gauge cum Level for B G with Sprit Level as per RDSO Drg No TM 108 and Sprit Level No TM2004 confirming to Specification No TM58 and TM52 | 40 | pieces | ammmao | 21 | |
| 3 | Versine Measuring Kit Model No VK1 | Versine Measuring Kit Model No VK1 of MS PIE Pvt Ltd OR similar consisting of a pair of versine holders versine scale nylon cord and winder complete in box | 35 | pieces | ammmao | 21 | |
| 4 | Spirit level for Gauge cum Level confirming to RDSO | Spirit level for Gauge cum Level confirming to RDSO drawing noTM 2004 and as per specification no TM52 | 30 | pieces | ammmao | 21 | |
| 5 | Chamfering kit to Specification no TM53 | Chamfering kit to Specification no TM53 latest revision | 4 | pieces | ammmao | 21 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer