TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs Automotive Components Tender 2026 India – 25% Quantity Option, 3 Years Govt Experience, Design Drawings 5 Days

Bid Publish Date

04-Sep-2026, 7:08 pm

Bid End Date

14-Sep-2026, 8:00 pm

Location

CACHAR , ASSAM

Progress

Issue04-Sep-2026, 7:08 pm
AwardPending

Tender Overview

Organization: Indian Army – Department Of Military Affairs. Procurement: automotive and mechanical components including 352 DIA CLUTCH DISC ASSY 175 SPLINE, BATTERY CUT OFF SWITCH, SOLENOID SWITCH, WINDOW REGULATOR RH, BEARING TAPERED ROLLER, FUEL PUMP, OIL SEAL ASSY, SHOCK ABSORBER, FUEL FILTER INLET, TIRE components, PIPE BRAKE, SHAFT SEAL, and related assemblies. Quantity/Value: BoQ lists 19 items; exact quantities not disclosed. Location: India. Bid scope: supply and delivery of multiple categorized components; option clause permits up to 25% quantity variation during contract and extended delivery window. Key differentiator: requirement to submit Detailed Design Drawings within 5 days of award with buyer-approved modifications. Unique aspects: End User Certificate may be required; performance tied to approved drawings; bidders must meet government supply qualifications.

Technical Specifications & Requirements

  • Delivery/Timing: delivery period starts after final delivery order; option quantity adjustments trigger revised delivery time using formula: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extended periods possible.
  • Design & Engineering: Successful bidder must submit Detailed Design Drawings within 5 days of award; buyer reviews and provides list of modifications within 5 days; fabrication must align to approved drawings.
  • Eligibility/Compliance: Bidder or OEM must have regularly manufactured and supplied similar category products to Central/State Govt bodies for 3 years; provide supporting contracts. Upload turnover evidence for last three years; required documents include certified financial statements.
  • End User/Certification: End User Certificate may be provided in buyer format; ensure compliance with government procurement norms.

Terms, Conditions & Eligibility

  • EMD/Financial: The terms reference bidder financial standing and turnover requirements; exact EMD not specified in data; turnover must meet minimum average over the last three years as per bid document.
  • Delivery & Penalties: Delivery terms anchored to original order; option-based extensions allowed; penalties or LD not detailed in available data.
  • Documentation: Submit GST, PAN, experience certificates, audited balance sheets or CA certificates, OEM authorizations, and technical bid documents per terms. Ensure End User Certificate alignment with buyer’s format.
  • Experience: Minimum 3 years of regular supply to Govt/PSUs for same or similar category products; primary product in bunch bids must meet this criterion.
  • Quality & Standards: Follow standard governance for government procurements; ensure documentation supports compliance with required product specifications and approvals.

Key Specifications

    • 352 DIA CLUTCH DISC ASSY 175 SPLINE, BATTERY CUT OFF SWITCH, SOLENOID SWITCH, ASSY WINDOW REGULATOR RH
    • BEARING TAPERED ROLLER 15 42 14 25MM, HOSE FUEL FILTER INLET, FLAP RUST SLIP ITTAC NO 20V FOR TYRE 14
    • OIL SEAL ASSY FLANGE, SHOCK ABSORBER ASSY STRUT ASSY, RELEASE BEARING BUTEE DM 86P
    • FUEL FEED PUMP, ALTERNATOR 24 VOLTS 75 AMPS, TIRE 25 11 12 489 E MARK, TIRE 25 8 12 489 E MARK
    • QUICK RELEASE VALVE, BRG BUSH, PIPE BRAKE NO 3, PIPE ENGINE OUTLET TO RADIATOR INLET
    • SHAFT SEAL; 19-item BoQ indicates multiple automotive components with no numeric quantities disclosed

Terms & Conditions

  • Option Clause allows up to 25% quantity variation and extended delivery period with calculation.

  • Detailed Design Drawings must be approved; 5-day submission and 5-day review window.

  • 3 years govt/PSU supply experience required; turnover verification via audited records or CA certificate.

Important Clauses

Payment Terms

Not detailed in provided data; typical Govt terms require milestone payments aligned to delivery and acceptance.

Delivery Schedule

Delivery starts from last date of original delivery order; option quantity affects delivery period; minimum 30 days extension.

Penalties/Liquidated Damages

Not specified in available information; standard practice applies LD for delayed deliverables per contract.

Bidder Eligibility

  • 3 years of regular Govt/PSU supply experience for similar automotive category products

  • Turnover compliant with three-year average benchmarks as per bid document

  • No liquidation, receivership, or bankruptcy; provide undertaking

Tender Data

Bid Details

Quantity

120

Category

352 DIA CLUTCH DISC ASSY 175 SPLINE

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Warranty Period

5 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

352 DIA CLUTCH DISC ASSY 175 SPLINE , BATTERY CUT OFF SWITCH , SOLENOID SWITCH , ASSY WINDOW REGULATOR RH , BEARING TAPERED ROLLER 15 42 14 25MM , HOSE FUEL FILTER INLET , FLAP RUST SLIP ITTAC NO 20V FOR TYRE 14 , OIL SEAL ASSY FLANGE , SHOCK ABSORBER ASSY STRUT ASSY , RELEASE BEARING BUTEE DM 86P , FUEL FEED PUMP , ALTERNATOR 24 VOLTS 75 AMPS , TIRE 25 11 12 489 E MARK , TIRE 25 8 12 489 E MARK , QUICK RELEASE VALVE , BRG BUSH , PIPE BRAKE NO 3 , PIPE ENGINE OUTLET TO RADIATOR INLET , SHAFT SEAL

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

30

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

CACHAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-CACHARCACHAR--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9848991.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

352 DIA CLUTCH DISC ASSY 175 SPLINE

LV7/TMB 2752-2520-0106 352 DIA CLUTCH DISC ASSY 1 75 SPLINE

2 pieces Delivery: 15 days
#2

BATTERY CUT OFF SWITCH

LV7/TMB 2573-5450-9931 BATTERY CUT OFF SWITCH

10 pieces Delivery: 15 days
#3

SOLENOID SWITCH

LV7/TMB 2625-8855 SOLENOID SWITCH

7 pieces Delivery: 15 days
#4

ASSY WINDOW REGULATOR RH

LV7/TMB 2610-7250-0117 ASSY WINDOW REGULATOR RH

12 pieces Delivery: 15 days
#5

BEARING TAPERED ROLLER 15 42 14 25MM

LV6/MT7 3110-001963 BEARING TAPERED ROLLER 15X42X14.25MM

5 pieces Delivery: 15 days
#6

HOSE FUEL FILTER INLET

LV6-MT6 15815M75J00-330 HOSE FUEL FILTER INLET

8 pieces Delivery: 15 days
#7

FLAP RUST SLIP ITTAC NO 20V FOR TYRE 14

LV6-MT14 2610-000195 FLAP (RUST SLIP)ITTAC NO 20V FOR TYRE 14

16 pieces Delivery: 15 days
#8

OIL SEAL ASSY FLANGE

LV7/MPVY DMD-NK-1058 OIL SEAL ASSY- FLANGE

14 pieces Delivery: 15 days
#9

SHOCK ABSORBER ASSY STRUT ASSY

LV7/STLN 2540-72-0000645 SHOCK ABSORBER ASSY/STRUT ASSY

11 pieces Delivery: 15 days
#10

RELEASE BEARING BUTEE DM 86P

LV7/STLN(VF) X-0205310 RELEASE BEARING BUTEE DM 86P

5 pieces Delivery: 15 days
#11

FUEL FEED PUMP

LV7/TMB 9440-030-028 FUEL FEED PUMP

7 pieces Delivery: 15 days
#12

ALTERNATOR 24 VOLTS 75 AMPS

LV7/TMB 2786-1599-0113 ALTERNATOR 24 VOLTS 75 AMPS

5 pieces Delivery: 15 days
#13

TIRE 25 11 12 489 E MARK

LV2/RTV 5415730 TIRE 25X11 12 489 E MARK

2 pieces Delivery: 15 days
#14

TIRE 25 8 12 489 E MARK

LV2/RTV 5415729 TIRE 25X8 12 489 E MARK

8 pieces Delivery: 15 days
#15

QUICK RELEASE VALVE

LV7/STLN(VF) B-5A03304 QUICK RELEASE VALVE

1 pieces Delivery: 15 days
#16

BRG BUSH

LV7/TATA 2625-8029 BRG BUSH

2 pieces Delivery: 15 days
#17

PIPE BRAKE NO 3

LV7/MARUTI 2940-003792 PIPE BRAKE NO 3

2 pieces Delivery: 15 days
#18

PIPE ENGINE OUTLET TO RADIATOR INLET

LV7/TMB 2786-5010-6951 PIPE ( ENGINE OUTLET TO RADIATOR INLET )

2 pieces Delivery: 15 days
#19

SHAFT SEAL

LV7/STLN X-2703700 SHAFT SEAL

1 pieces Delivery: 15 days

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar Govt/PSU supply

4

Audited financial statements or CA certificate for turnover

5

EMD submission proof (as per buyer terms)

6

Technical bid documents and product specifications

7

OEM authorization or reseller agreements (where applicable)

8

End User Certificate in buyer format (if requested)

Frequently Asked Questions

How to bid for Indian Army automotive components tender in India 2026?

Bidders should demonstrate at least 3 years of Govt/PSU supply experience for similar products, submit validated turnover in last three years, provide OEM authorizations if required, and supply Detailed Design Drawings within 5 days of award. Ensure End User Certificate is in the buyer format and meet 25% quantity option compliance.

What documents are required for this Indian Army procurement in India?

Prepare GST and PAN, experience contracts with Govt bodies, audited financials or CA turnover certificate, EMD proof, technical bid, OEM authorization letters, and End User Certificate if requested. Ensure all documents align with Terms and Conditions and submission guidelines.

What are the design drawing requirements for this military procurement?

Submit Detailed Design Drawings within 5 days of award; Buyer reviews within 5 days and lists modifications. Supply must conform to approved drawings with modifications, and any approval delays reset the delivery timeline without LD penalties for Buyer-caused delays.

What is the quantity variation allowed under the option clause?

The Purchaser may increase or decrease the quantity by up to 25% of the bid quantity at contract placement and during the currency of the contract. Delivery time adjusts proportionally, with a minimum extension of 30 days.

What are Govt/PSU eligibility criteria for this tender in India?

Bidders must have 3 years of regular supply experience to Govt/PSU for similar products, provide contract copies, maintain required turnover over the last three years, and demonstrate financial stability with audited statements or CA certificates.

What are the key delivery terms for this Indian Army tender?

Delivery starts after the last date of the original delivery order; extension due to option quantity uses the calculated formula with minimum 30 days; extended periods may be permitted but require contract-based approvals and no LD for Buyer delays in drawings.