TenderDekho Logo
Closed GEM

Indian Army Steel Angles & Carbon Steel Bars Tender 2026 Rajasthan - 25% Quantity Option, ISI/AIS Standards 2026

Bid Publish Date

19-Sep-2026, 1:34 pm

Bid End Date

29-Sep-2026, 2:00 pm

Value

₹1,50,000

Progress

Issue19-Sep-2026, 1:34 pm
Technical28-09-2026 18:49:38
Financial
AwardCompleted

Tender Overview

The Indian Army, Department of Military Affairs, seeks procurement of steel angle, carbon hot-rolled steel bars (25mm & 40mm), rod welding services, and polish wax. Estimated value is ₹150,000. The tender lists five items in the BOQ with non-disclosed quantities and lacks explicit start/end dates. Key differentiators include an option clause permitting up to 25% quantity variation and a requirement to secure Detailed Design Drawings and advance samples approved by the buyer before bulk production. Delivery timelines hinge on the original delivery period with potential extensions, and drawings/samples approvals influence schedule once awarded.

Technical Specifications & Requirements

  • Items: steel angle, steel bar carbon hot rolled 25mm, steel bar carbon hot rolled 40mm, rod welding, polish wax.
  • Quantity: not specified; contract may enable up to 25% variation from bid quantity.
  • Standards/Compliance: not specified in data; bidders should align with buyer-approved drawings and samples.
  • Submission prerequisites: submit Detailed Design Drawings within 5 days of award; buyer review within 7 days; advance sample approval within 5 days; failure to approve may modify delivery timelines without LD.
  • Delivery & risk: delivery period adjusted by buyer approval, with potential extension as per option clause; no LD details provided in data.
  • Documentation: advance samples and detailed drawings required; samples supplied free of cost unless otherwise specified.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% at contract rates; extension rules apply with minimum 30 days.
  • Design/Sample approvals: Detailed Drawings and advance samples must be approved by Buyer; delays in Buyer approval may refix delivery without LD.
  • Post-award manufacturing: Bulk supply must follow approved drawings and any communicated modifications; major deviations may trigger fresh samples or contract termination.
  • Samples: Advance samples to be supplied, and if major deviations found, buyer may terminate after deviation notice; samples for testing to be supplied at no cost.
  • EMD/Financials: No explicit EMD or payment terms provided in data; bidders should prepare typical procurement documentation.
  • Compliance risk: If drawing/sample approval delays occur, delivery scheduling becomes contractor-responsibility without LD compensation.

Key Specifications

  • Product names: steel angle, carbon hot-rolled steel bars 25mm, carbon hot-rolled steel bars 40mm, welding rods, polish wax

  • Quantities: not disclosed; option to adjust up to 25% during and after contract

  • Est. value: ₹150,000

  • Delivery/approval process: Detailed Drawings due within 5 days of award; approval/revisions within 7 days; advance samples due in 5 days

  • Quality/build standards: must align with Buyer-approved drawings and modifications; no explicit standard numbers provided

  • Samples: advance samples supplied free of cost; major deviations may trigger re-sampling or termination

Terms & Conditions

  • Option to vary quantity up to 25% at contract rates

  • Approval-driven delivery schedule tied to drawings and samples

  • Advance sample/testing required before bulk manufacturing

Important Clauses

Payment Terms

No explicit payment terms provided; bidders should prepare standard procurement payment readiness aligned with contract after delivery/acceptance

Delivery Schedule

Delivery period may be adjusted based on final approved drawings and sample approvals; extension rules apply with minimum 30 days if quantity changes occur

Penalties/Liquidated Damages

No LD percentage defined; delivery timelines may be refixed for approval delays without LD

Bidder Eligibility

  • Experience in supplying steel angles and hot-rolled carbon steel bars

  • Ability to produce Detailed Design Drawings within 5 days of award

  • Capability to provide advance samples within 5 days and comply with buyer modifications

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
CST CORPORATION   Under PMA
-28-09-2026 18:49:38
2
GHOSH TRADING CO   Under PMA
-28-09-2026 18:41:18
3
SARASWATI ENTERPRISE   Under PMA
-28-09-2026 18:57:36

Financial Results

Rank Seller Price Item
L1
SARASWATI ENTERPRISE   Under PMA
Item Categories : STEEL ANGLE,STEEL BAR CARBON HOT ROLLED 25MM,STEEL BAR CARBON HOT ROLLED 40MM,ROD WELDING,POLISH WA
L2
GHOSH TRADING CO   Under PMA
Item Categories : STEEL ANGLE,STEEL BAR CARBON HOT ROLLED 25MM,STEEL BAR CARBON HOT ROLLED 40MM,ROD WELDING,POLISH WA
L3
CST CORPORATION   Under PMA
Item Categories : STEEL ANGLE,STEEL BAR CARBON HOT ROLLED 25MM,STEEL BAR CARBON HOT ROLLED 40MM,ROD WELDING,POLISH WA

Tender Data

Bid Details

Quantity

164

Category

STEEL ANGLE

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

75

OEM Avg. Turnover

6

Past Performance

40 %

Warranty Period

2 years

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

STEEL ANGLE , STEEL BAR CARBON HOT ROLLED 25MM , STEEL BAR CARBON HOT ROLLED 40MM , ROD WELDING , POLISH WAX

Pre-Bid & Qualification

Pre-Bid Date

24-09-2026 13:00:00

Pre-Bid Venue

312 Field Workshop Coy EME PIN-906312 C/o 99 APO Ballygunge Maidan Camp Kolkata items discussed for How to repair maintenance of vehicle

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Kolkata

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KolkataKolkata--10030-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9917704.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

STEEL ANGLE

STEEL ANGLE

100 ft Delivery: 30 days
#2

STEEL BAR CARBON HOT ROLLED 25MM

STEEL BAR CARBON HOT ROLLED 25MM

26 sht Delivery: 30 days
#3

STEEL BAR CARBON HOT ROLLED 40MM

STEEL BAR CARBON HOT ROLLED 40MM

16 sht Delivery: 30 days
#4

ROD WELDING

ROD WELDING

20 kgs Delivery: 30 days
#5

POLISH WAX

POLISH WAX

2 tin Delivery: 30 days

Categories 20

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar steel fabrication/material supply

4

Financial statements (audited, if available)

5

EMD/Security deposit documentation (as applicable)

6

Technical bid documents demonstrating capability for steel angles/bars/rod welding

7

OEM authorizations or approvals for carbon steel products

8

Detailed Design Drawings submission and sample approval documentation

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for steel angle and carbon steel bars tender in Indian Army 2026?

Bidders must submit Technical and Commercial bids with demonstrated capacity for steel angles, 25mm/40mm bars, welding rods, and polish wax. Include Detailed Design Drawings within 5 days of award and advance samples within 5 days for buyer approval; ensure quantity flexibility up to 25% and comply with drawing approvals to avoid schedule risks.

What documents are required for Indian Army steel tender in 2026?

Submit GST certificate, PAN card, experience certificates of similar supply, financial statements, EMD documentation, technical bid with capability for steel products, OEM authorizations for carbon steel, and Detailed Design Drawings plus advance sample submission records to demonstrate compliance with buyer approvals.

What are the technical specifications for steel bars in this Army tender?

The tender includes carbon hot-rolled steel bars in 25mm and 40mm diameters, along with steel angles, welding rods, and polish wax; however, explicit ISO/IS standards are not listed. Align production with Buyer-approved drawings and include any modifications requested by the buyer during approval cycles.

When is the delivery timeline affected by design approvals for Army contracts?

Delivery schedules hinge on the time taken to approve Detailed Drawings (5 days) and any modifications required (7 days). Delays by the buyer in approval reset the delivery period, with no LD penalties described for such delays.

What are the EMD and payment terms for this Army procurement?

The data does not specify an EMD amount or explicit payment terms. Bidders should prepare standard tender EMD deposit documentation and await contract terms post-award; ensure readiness to comply with delivery as per approved drawings and sample acceptance.

How does the 25% quantity option affect delivery in this tender?

The purchaser may increase or decrease bid quantity up to 25% at contract rates during and after award. Delivery time adjusts via the formula (Increase/Original) × Original period, with a minimum of 30 days; extended delivery can still be managed within the original window if not exceeding provided limits.

What happens if advance samples do not meet contract specifications?

If advance samples fail, the buyer may require fresh samples or terminate the contract after notifying deviations. If major deviations occur, bulk supply may be blocked until corrections are approved; samples for testing must be provided at contractor cost unless stated otherwise.

Advertisement