Bid Publish Date
07-Oct-2026, 10:17 am
Bid End Date
17-Oct-2026, 11:00 am
Location
Progress
Organization: Indian Army, Department of Military Affairs. Procurement: Provision of trophy shelf display of awards and trophies, including supply, installation, testing and commissioning. Quantity/Value: Not disclosed; tender outlines option to adjust quantity by up to 50% during and after contract. Location: India (location not specified in documents). Context: Encompasses display fixtures for ceremonial awards, requiring signed technical specification documents and ATC compliance. Differentiator: ITC clause enabling quantity flex and extended delivery time calculation based on original delivery period, with a minimum of 30 days. Uniqueness: ATC provisions enforce bid integrity with IP address checks; emphasis on complete SITC scope.
Product/service category: Trophy shelf display fixtures for awards and trophies
Key scope: Supply, Installation, Testing and Commissioning (SITC)
EMD/ESTIMATED VALUE: Not disclosed in tender data
Quality/standards: Not specified in available data
Delivery terms: Option to increase/decrease quantity by up to 50% with extended delivery period formula
Documentation: Signed technical specifications документ and ATC compliance
Quantity adjustment up to 50% during contract with proportional delivery time
SITC scope included in bid price; installation and commissioning mandatory
Bidder must submit signed technical specifications and ATC document; IP address rule enforced
Not specified in available data
Delivery period starts from last date of original delivery order; extended delivery time formula applies with minimum 30 days
Not specified in available data
Previous experience in supplying trophy/display fixtures or related furniture for government entities
Financial capability to undertake SITC contracts for ceremonial displays
Compliance with ITC/ATC terms and ability to sign signed technical specifications
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Provision of trophy shelf display of awards and trophies
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
PUNE CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | PUNE CITY | PUNE CITY | - | - | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar trophy display projects
Financial statements for the last 2 fiscal years
EMD/Security deposit (as applicable)
Technical compliance certificates and signed specifications
OEM authorization or vendor authorization (if applicable)
ATC document signed and stamped on company letterhead
Key insights about MAHARASHTRA tender market
Bidders must submit GST and PAN, provide experience certificates for similar displays, and include signed technical specifications with firm stamp. The bid includes SITC scope and ATC compliance; ensure IP address integrity and upload the ATC document. Delivery is governed by the option clause.
Required documents include GST registration, PAN, experience certificates for similar work, financial statements for the last two years, EMD details, signed technical specifications, OEM authorizations if applicable, and the ATC document. Ensure all documents are current and notarized where required.
Delivery timing follows the original delivery order with a 50% quantity flex allowed. The extended period uses the formula (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Delivery commences after the last delivery date for the original order.
Scope includes Supply, Installation, Testing and Commissioning. Bid must cover all installation components and on-site commissioning; price should be all-inclusive. Technical specs must be signed and stamped; address any installation constraints in the proposal.
Bids from identical IP addresses will be rejected to prevent duplication. Ensure submission from a unique network; verify that all users submitting bids are authenticated and not shared across multiple entries.
ATC document must be uploaded as part of the bid and any technical specification must be signed on firm letterhead. Compliance with ATC terms is mandatory; non-compliance may lead to disqualification from TEC evaluation.
Scope includes Supply, Installation, Testing and Commissioning of trophy shelf displays. All associated components and commissioning activities are included; ensure the bid price covers all costs and no ancillary charges arise during SITC.