Bid Publish Date
02-Sep-2026, 3:29 pm
Bid End Date
12-Sep-2026, 9:00 pm
EMD
₹50,000
Location
Progress
The UP Urban Development Department through E-municipalities invites bids for LED Luminaire for Road and Street Lights conforming to IS 10322 (Part 5/Section 3) (V3) under BIS Scheme II. Located in Barabanki, Uttar Pradesh, the opportunity uses an EMD of ₹50,000 and anticipates a flexible quantity allocation with up to 25% increase at contract award or during currency. The contract requires bidders to meet turnover criteria over the last three financial years and to demonstrate OEM turnover compliance when applicable. A functional service centre in each consignee state is mandatory for carry-in warranty scenarios, with a 30-day setup window post-award if not existing at bidding. Unique BIS and IS 10322 compliance distinguishes this tender from generic LED procurements.
Key technical scope includes:
LED Luminaire System Wattage: specify exact wattage in BOQ or product datasheet
LED Luminaire System Efficacy: measured in lumen per watt (lm/W)
LED Colour Temperature: 2700K-3000K, 3500K-4000K, or 5000K-6500K
Ingress Protection: housing IP rating suitable for outdoor street lighting
Minimum Internal Surge Protection: X kV (as per IS 10322 compliance)
Minimum Standard Warranty: specified warranty period and terms
Compliance: IS 10322 Part 5 Section 3 (V3), BIS Scheme II
OEM/Branding: any brand/OEM requirements if stated
EMD: ₹50,000 payable with bid submission
Delivery: timeline linked to delivery order, with option to extend up to 30 days minimum
Turnover: three-year average turnover requirement for bidders and OEM
Service centres: must be functional in each consignee state for carry-in warranty
Warranty: minimum standard warranty term to be clarified in bid
Common tender terms require 100% payment on delivery or as specified in contract; EMD ₹50,000 must accompany bid; adjust terms if a separate payment schedule is provided.
Delivery period begins after last delivery order date; option-clause may extend time proportionally with minimum 30 days; successful bidder must adhere to calculated timelines.
Penalties for late delivery or non-conformance to IS 10322 requirements may apply; LD rate to be detailed in contract.
Minimum three-year turnover track record; average annual turnover as per bid document
Compliance with IS 10322 Part 5 Section 3 (V3) and BIS Scheme II
Functional service center in each consignee state or ability to establish within 30 days of award
Quantity
200
Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II)
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
10
OEM Avg. Turnover
20
Past Performance
80 %
Warranty Period
5 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Barabanki
Delivery Pincodes
225123
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Satish Srivastava | 225123,nagar panchayat subeha | Barabanki | Uttar Pradesh | 225123 | 100 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate indicating turnover for last 3 financial years
OEM authorisation (if bidding as OEM or on behalf of OEM)
Technical bid documents evidencing IS 10322 compliance
EMD payment document (₹50,000)
Experience certificates for relevant LED luminaires supply
Service centre details or proof of planned establishment within 30 days of award
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | System Wattage (in Watt) | 90 |
| Performance Parameters | LED Luminaire System Efficacy (in lumen/watt) | 140 Or higher |
| Performance Parameters | LED Colour Temperature [Hint: Warm White (2700K-3000K), Bright White (3500 K-4000 K), Cool White/Daylight (5000 K-6500 K)] | 5700 K |
| Construction | Ingress Protection (Entire Housing) | IP65, IP66 Or higher |
| Construction | Minimum Internal Surge Protection (in kV) | 4, 5 Or higher |
| Warranty | Minimum Standard Warranty | 1.0 |
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, audited turnover certificates for the last 3 financial years, and EMD ₹50,000. Provide IS 10322 (Part 5/Section 3) BIS Scheme II compliance documents, OEM authorisation if applicable, and evidence of a service center capable of carry-in warranty in UP.
Required documents include GST certificate, PAN, turnover certificates, EMD receipt of ₹50,000, OEM authorisation if bidding for another, technical compliance certificates showing IS 10322 adherence, and experience certificates for similar luminaires delivery in the last 3 years.
Key specs include specified System Wattage, LED efficacy in lm/W, colour temperature options (2700-6500K bands), IP rating for outdoor housing, minimum surge protection in kV, and a minimum standard warranty per BIS Scheme II requirements.
EMD is ₹50,000. Payment terms typically follow contract conditions, with clarity on schedule to be provided in the final contract; ensure EMD submission with bid as per tender terms.
The purchaser may vary quantity by ±25% at contract award or during currency; delivery time extends proportionally, with a minimum of 30 days, and may extend up to original delivery period.
Bidder must have a functional service centre in the state of each consignee location for carry-in warranty; if not available, the bidder must establish one within 30 days of award.
OEM turnover must meet the minimum average annual turnover specified in the bid document for the last three years; if OEM is younger than 3 years, turnover is counted from post-constitution years.
Luminaires must conform to IS 10322 Part 5 Section 3 (V3) under BIS Scheme II; ensure ISI/BIS certifications and relevant OEM authorisations are included with bid.