TenderDekho Logo
Active GEM

Tender Notice for 1. supply of CYLINDER BLOCK assembled with Plug-KAIGA-3-35221-3317-DD-as per the attached drawing n in UTTARA KANNADA, KARNATAKA

Bid Publish Date

11-Aug-2026, 5:08 pm

Bid End Date

02-Sep-2026, 11:00 am

EMD

₹77,809

Progress

Issue11-Aug-2026, 5:08 pm
AwardPending

A tender has been published for Nuclear Power Corporation Of India Limited 1. supply of CYLINDER BLOCK assembled with Plug-KAIGA-3-35221-3317-DD-as per the attached drawing n in UTTARA KANNADA, KARNATAKA. Quantity: 360 by. Submission Deadline: 02-09-2026 11: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

360

Category

1. supply of CYLINDER BLOCK assembled with Plug-KAIGA-3- 35221-3317-DD-as per the attached drawing no.KAIGA-3- 35221-3262-DD-R3 and as per attached specifications

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

21

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

220

Delivery Locations

1

Delivery Cities

Uttara Kannada

Delivery Pincodes

581400

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Santosh Kulkarni581400,Plant Site, Kaiga Generating Station, PO: KaigaUttara KannadaKarnataka5814002220-

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-9672889.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Nuclear Power Corporation Of India Limited

Office Name

Kaiga Karnataka

Ministry

PMO

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 38 Items Sign in for GEM prices

#1

1. supply of CYLINDER BLOCK assembled with Plug-KAIGA-3-35221-3317-DD-as per the attached drawing no.KAIGA-3-35221-3262-DD-R3 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of CYLINDER BLOCK assembled with Plug-KAIGA-3-35221-3317-DD-as per the attached drawing no.KAIGA-3-35221-3262-DD-R3 and as per attached specifications

2 set Delivery: 220 days
#2

2. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPACER as per Drawing No. KAIGA-3-35221-3263-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPACER as per Drawing No. KAIGA-3/35221/3263/DD and as per attached specifications.

2 nos Delivery: 220 days
#3

3. Procurement of raw material, testing, manufacturing, inspection, packing and supply of Guide Cylinder as per Drawing No. KAIGA-3-35221-3264-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of Guide Cylinder as per Drawing No. KAIGA-3/35221/3264/DD and as per attached specifications

2 nos Delivery: 220 days
#4

4. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SENSOR SHAFT as per Drawing No. 006-35221-0030-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SENSOR SHAFT as per Drawing No. 006/35221/0030/DD and as per attached specifications

2 nos Delivery: 220 days
#5

5. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SENSOR TIP as per Drawing No. 006-35221-0029-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SENSOR TIP as per Drawing No. 006/35221/0029/DD and as per attached specifications

2 nos Delivery: 220 days
#6

6. inspection, manufacturing, Surface hardening-heat treatment, testing, final inspection and supply of F-M head- sensor stop and pusher assembly STOP PIN as per Drg. No. KAIGA-3-35221-3272-DD

Procurement of material, testing of material as per specifications attached, cleaning, inspection, manufacturing, Surface hardening/heat treatment, testing, final inspection and supply of F/M head- sensor stop & pusher assembly STOP PIN as per Drg. No. KAIGA-3/35221/3272/DD

16 nos Delivery: 220 days
#7

7. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SHIM as per Drawing No. KAIGA-3-35221-3273-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SHIM as per Drawing No. KAIGA-3/35221/3273/DD and as per attached specifications

20 nos Delivery: 220 days
#8

8.Procurement of raw material, testing, manufacturing, inspection, packing and supply of PISTON PIN as per Drawing No. KAIGA-3-35221-3277-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of PISTON PIN as per Drawing No. KAIGA-3/35221/3277/DD and as per attached specifications

12 nos Delivery: 220 days
#9

9. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPACER as per Drawing No. KAIGA-3-35221-0027-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPACER as per Drawing No. KAIGA-3/35221/0027/DD and as per attached specifications

4 nos Delivery: 220 days
#10

10. Procurement of raw material, testing, manufacturing, inspection, packing and supply of A-BUSH as per Drawing No. KAIGA-3-35221-3280-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of A-BUSH as per Drawing No. KAIGA-3/35221/3280/DD and as per attached specifications

6 nos Delivery: 220 days
#11

11. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SEAL SPACER as per Drawing No. KAIGA-3-35221-3283-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SEAL SPACER as per Drawing No. KAIGA-3/35221/3283/DD and as per attached specifications

4 nos Delivery: 220 days
#12

12. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SENSOR SPRING as per Drawing No. KAIGA-3-35221-3285-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SENSOR SPRING as per Drawing No. KAIGA-3/35221/3285/DD and as per attached specifications

16 nos Delivery: 220 days
#13

13. Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPRING BEARING PIN as per Drawing No. KAIGA-3-35221-3292-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPRING BEARING PIN as per Drawing No. KAIGA-3/35221/3292/DD and as per attached specifications

10 nos Delivery: 220 days
#14

14. Procurement of raw material, testing, manufacturing, inspection, packing and supply of LUG as per Drawing No. KAIGA-3-35221-3294-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of LUG as per Drawing No. KAIGA-3/35221/3294/DD and as per attached specifications

10 nos Delivery: 220 days
#15

15. Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-PISTON EXTENSION as per Drawing No. KAIGA-3-35221-3290-DD and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-PISTON EXTENSION as per Drawing No. KAIGA-3/35221/3290/DD and as per attached specifications

2 nos Delivery: 220 days
#16

16. Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-PISTON HEAD as per the attached drawing no.KAIGA-3-35221-3297-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-PISTON HEAD as per the attached drawing no.KAIGA-3/35221/3297/DD/R1 and as per attached specifications

8 nos Delivery: 220 days
#17

17. Procurement of raw material, testing, manufacturing, inspection, packing and supply of B and D BUSH as per the attached drawing no.KAIGA-3-35221-3302-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of B and D BUSH as per the attached drawing no.KAIGA-3/35221/3302/DD/R1 and as per attached specifications

8 nos Delivery: 220 days
#18

18. raw material, testing, manufacturing, inspection, packing and supply of B and D PISTON EXTENSION as per the attached drawing no.KAIGA-3-35221-3304-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of B and D PISTON EXTENSION as per the attached drawing no.KAIGA-3/35221/3304/DD/R1 and as per attached specifications

10 nos Delivery: 220 days
#19

19. raw material, testing, manufacturing, inspection, packing and supply of GLASS SWITCH RETAINING TUBE as per the attached drawing no.KAIGA-3-35221-3305-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of GLASS SWITCH RETAINING TUBE as per the attached drawing no.KAIGA-3/35221/3305/DD/R1 and as per attached specifications

12 nos Delivery: 220 days
#20

20. Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-BUSH as per the attached drawing no.KAIGA-3-35221-3306-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-BUSH as per the attached drawing no.KAIGA-3/35221/3306/DD/R1 and as per attached specifications

6 nos Delivery: 220 days
#21

21. raw material, testing, manufacturing, inspection, packing and supply of A, B and D PISTON HEAD as per the attached drawing no.KAIGA-3-35221-3307-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of A, B & D PISTON HEAD as per the attached drawing no.KAIGA-3/35221/3307/DD/R1 and as per attached specifications

24 nos Delivery: 220 days
#22

22. Procurement of raw material, testing, manufacturing, inspection, packing and supply of DOWEL PIN as per the attached drawing no.KAIGA-3-35221-3311-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of DOWEL PIN as per the attached drawing no.KAIGA-3/35221/3311/DD/R1 and as per attached specifications

3 nos Delivery: 220 days
#23

23. Procurement of raw material, testing, manufacturing, inspection, packing and supply of DOWEL PIN as per the attached drawing no.KAIGA-3-35221-3312-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of DOWEL PIN as per the attached drawing no.KAIGA-3/35221/3312/DD/R1 and as per attached specifications

3 nos Delivery: 220 days
#24

24. Procurement of raw material, testing, manufacturing, inspection, packing and supply of A-SLEEVE as per the attached drawing no.KAIGA-3-35221-3313-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of A-SLEEVE as per the attached drawing no.KAIGA-3/35221/3313/DD/R1 and as per attached specifications

4 nos Delivery: 220 days
#25

25. Procurement of raw material, testing, manufacturing, inspection, packing and supply of B and D-SLEEVE as per the attached drawing no.KAIGA-3-35221-3314-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of B & D-SLEEVE as per the attached drawing no.KAIGA-3/35221/3314/DD/R1 and as per attached specifications

6 nos Delivery: 220 days
#26

26. Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-SLEEVE as per the attached drawing no.KAIGA-3-35221-3315-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of C-SLEEVE as per the attached drawing no.KAIGA-3/35221/3315/DD/R1 and as per attached specifications

4 nos Delivery: 220 days
#27

27. Procurement of raw material, testing, manufacturing, inspection, packing and supply of MAGNET as per the attached drawing no.KAIGA-3-35221-3318-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of MAGNET as per the attached drawing no.KAIGA-3/35221/3318/DD/R1 and as per attached specifications

4 nos Delivery: 220 days
#28

28. Procurement of raw material, testing, manufacturing, inspection, packing and supply of MAGNET LOCATOR as per the attached drawing no. KAIGA-3-35221-3320-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of MAGNET LOCATOR as per the attached drawing no.KAIGA-3/35221/3320/DD/R1 and as per attached specifications

4 nos Delivery: 220 days
#29

29. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX. SOCKET HEAD CAP SCREW M-12 X 1.75-4H LG-40 HTS CADMIUM PLATED

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX. SOCKET HEAD CAP SCREW M-12 X 1.75-4H LG-40 HTS CADMIUM PLATED

10 nos Delivery: 220 days
#30

30. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOCKET SET SCREW-CUP POINT- M6 X 1 - 4H LG - 10 SS

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOCKET SET SCREW (CUP POINT) M6 X 1 - 4H LG - 10 SS

12 nos Delivery: 220 days
#31

31. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HELICOIL SL1-SL-C4-CN6

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HELICOIL SL1-SL-C4-CN6

16 nos Delivery: 220 days
#32

32. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX. SOCKET HEAD CAP SCREW M16 X 2 - 4H LG 90 HTS CADMIUM PLATED

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX. SOCKET HEAD CAP SCREW M16 X 2 - 4H LG 90 HTS CADMIUM PLATED

28 nos Delivery: 220 days
#33

33. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOCKET HEAD CAP SCREW M8 X 1.25 -4H LONG 20 SS 304

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOCKET HEAD CAP SCREW M8 X 1.25 -4H LONG 20 SS 304

18 nos Delivery: 220 days
#34

34. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HELICOIL SL1-SL-C8-CN 16.

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HELICOIL SL1-SL-C8-CN 16.

24 nos Delivery: 220 days
#35

35. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOCKET HEAD CAP SCREW M5 X 0.8 4H LONG 18 SS 304

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOCKET HEAD CAP SCREW M5 X 0.8 4H LONG 18 SS 304

16 nos Delivery: 220 days
#36

36. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX. SOCKET HEAD CAP SCREW M10 X 1.5-4H LONG 120 HTS CADMIUM PLATED

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX. SOCKET HEAD CAP SCREW M10 X 1.5-4H LONG 120 HTS CADMIUM PLATED

14 nos Delivery: 220 days
#37

37. Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOC HEAD CAP SCREW- CUP POINT- M8 X 1.25-6H LONG 30 HTS CADMIUM PLATED

Procurement of raw material, testing, manufacturing, inspection, packing and supply of HEX SOC HEAD CAP SCREW ( CUP POINT) M8 X 1.25-6H LONG 30 HTS CADMIUM PLATED

12 nos Delivery: 220 days
#38

38. testing, manufacturing, inspection, packing and supply of SPRING BEARING PLATE as per the attached drawing no.KAIGA-3-35221-3325-DD-R1 and as per attached specifications

Procurement of raw material, testing, manufacturing, inspection, packing and supply of SPRING BEARING PLATE as per the attached drawing no.KAIGA-3/35221/3325/DD/R1 and as per attached specifications

4 nos Delivery: 220 days

Categories 27

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data