Rourkela Steel Plant Gear Coupling Tender Odisha 2026 - 25% Quantity Variations, GST, Post-Delivery Inspection

Bid Publish Date

03-Oct-2026, 10:40 am

Bid End Date

20-Oct-2026, 2:00 pm

Generate Docs

Progress

Issue03-Oct-2026, 10:40 am
Corrigendum13-Oct-2026
AwardPending

Key Highlights

  • • Critical: 25% quantity variation clause during contract and extended delivery time calculation formula
  • • GST handling: actual GST reimbursement, lower of actual or quoted GST rate, with GST invoice scans required
  • • Inspection: post-receipt inspection at AT RSP STORES; pre-dispatch inspection only if specified in ATC
  • • Registration: LTE-issued offers only; mandatory vendor registration via www.sailtenders.co.in

Tender Overview

Organization: Rourkela Steel Plant (SAIL) seeks supply of gear coupling items (ZINA 5, PT. 845, ZIZS 3.5-250, PT. 845.99) via GeM. Estimated value and quantity are not disclosed; scope covers Only supply of Goods. The tender allows a 25% quantity variation during placement and within the contract period at contracted rates. Pre- or post-dispatch inspection options are defined, with inspection at AT RSP STORES for acceptance. Registration for potential bidders is via the vendor portal at www.sail tenders.co.in, and LTE-registered suppliers will be considered. This procurement emphasizes supplier readiness, GST handling, and ad hoc quantity adjustments within the stated limits.

Technical Specifications & Requirements

  • Scope: Gear coupling assemblies and related items listed under the mentioned categories (ZINA 5, PT. 845; ZIZS 3.5-250, PT. 845.99).
  • Delivery: Delivery period terms reference original and extended timelines with a minimum 30 days, and extension logic tied to quantity variations.
  • Inspection: Post-receipt inspection at the consignee site; pre-dispatch inspection not explicitly required unless ATC specifies.
  • GST: Bidders must determine GST applicability and are reimbursed per actuals or applicable rates, whichever is lower, within quoted GST percentage.
  • Documentation: Upload GST invoice scan and GST portal payment screenshot during GeM invoicing; ensure certificates and documents per ATC.
  • Tender security: EMD details are not disclosed; bidders should plan for standard bid security per GeM/SAIL norms.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% during contract; extended delivery term calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
  • Eligibility: LTE-issued offers only; supplier registration required at www.sailtenders.co.in; registration process may include vendor base enhancement.
  • Inspection Agency: Post-receipt inspection at RSP stores; NB: pre-dispatch not mandated unless ATC calls it out.
  • Payment & Warranty: Specific payment terms not stated; ensure GST compliance and standard GeM payment mechanics; warranty terms not detailed.
  • Liability: Offer acceptance contingent on uploading required certificates/documents per Bid Document and ATC; non-compliance risks rejection.
  • Delivery & Penalties: Not explicitly defined; adherence to delivery periods and option clause is mandatory.

Key Specifications

    • Product category: Gear coupling assemblies (ZINA 5, PT. 845; ZIZS 3.5-250, PT. 845.99)
    • Estimated quantity: Not disclosed; quantity variation up to 25%
    • Standards: Not specified; ensure compliance with general gear coupling industry specs
    • Certifications: Not specified; provide applicable OEM/ISO/IS standards if available
    • Delivery: Original delivery period + extended period with minimum 30 days extension

Terms & Conditions

  • EMD amount: Not disclosed; provide bid security as per GeM/SAIL norms

  • Delivery: 25% quantity variation allowed; delivery time extended proportionally

  • Inspection: Post-receipt inspection at RSP Stores; ATC may specify pre-dispatch

  • GST: Bidder to determine GST; reimbursement per actuals or lower rate

Important Clauses

Payment Terms

GST must be uploaded with invoice; payment terms aligned with GeM/Sail standard practices; GST payment confirmation required

Delivery Schedule

Delivery starts after order; extended delivery time based on increased quantity as per clause; minimum 30 days

Penalties/Liquidated Damages

Not explicitly defined; adherence to delivery terms and option clause is required; LD terms may be as per GeM/SAIL norms

Bidder Eligibility

  • LTE-issued offers only

  • Vendor registration via www.sailtenders.co.in

  • Experience in supplying gear coupling components or similar mechanical couplings

Advertisement

Tender Data

Bid Details

Quantity

4

Category

GEAR COUPLING, ZINA 5, PT. 845

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

GEAR COUPLING, ZINA 5, PT. 845 , GEAR COUPLING, ZIZS 3.5-250, PT. 845.99

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

200

Delivery Locations

1

Delivery Cities

Sundargarh

Delivery Pincodes

769011

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pramod Kumar Biswal769011,Office of GM I/c Stores & Inspection, Rourkela Steel Plant, RourkelaSundargarhOdisha7690112200-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9962065.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Materials Management Purchase

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

13-Oct-2026

Extended Deadline

20-Oct-2026, 8:30 am

Opening Date

21-Oct-2026, 8:30 am

Advertisement

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (similar gear coupling supplies)

4

Financial statements (audited, if applicable)

5

Bid security/EMD as per GeM/SAIL norms (exact amount not disclosed)

6

Technical bid documents (compliance with ATC)

7

OEM authorizations or dealer authorization (if applicable)

8

GST invoice scan template and GST portal payment screenshot

9

Vendor registration confirmation from www.sailtenders.co.in

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid on gear coupling tender in Rourkela Odisha 2026?

Bidders must be LTE-registered and upload GST invoice scans plus GST payment proof. Registration is via www.sailtenders.co.in. Ensure gear coupling items meet the ZINA 5 and ZIZS 3.5-250 specifications; comply with the 25% quantity variation clause and provide necessary certificates per ATC.

What documents are required for gear coupling procurement in RSP?

Submit GST registration, PAN, experience certificates for similar supply, financial statements, OEM/Dealer authorization, technical bid documents, EMD, and GST invoice scan with GST portal payment screenshot; ensure compliance with ATC and Bid Document.

What is the delivery extension rule for increased quantity in this tender?

If quantity increases by up to 25%, the delivery period extends proportionally: (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days; original delivery period must not be shorter than 30 days for extension feasibility.

What inspections occur for gear coupling supply to RSP?

Post-receipt inspection is conducted at the consignee site (AT RSP STORES). Pre-dispatch inspection is only required if specified in ATC; otherwise, acceptance is based on post-delivery verification.

Are there GST reimbursement rules for this tender in Odisha?

GST reimbursement follows actuals or applicable rate, whichever is lower, capped to the quoted GST percentage. Bidders must upload GST invoice and GST portal payment confirmation in GeM.

What are the critical eligibility criteria for LTE suppliers?

Only LTE-issued offers are considered. Eligible bidders must complete vendor registration on www.sailtenders.co.in and demonstrate relevant gear coupling supply experience and financial stability per Terms and ATC.

What is the scope of supply for this gear coupling tender?

Scope is limited to the supply of goods only; no service or installation components are specified. Ensure all gear coupling items (ZINA 5, ZIZS 3.5-250) are supplied, with post-delivery inspection compliance.

What is the role of post-receipt inspection in GeM procurement?

Post-receipt inspection at the consignee site validates quantity and quality before acceptance; pre-dispatch inspection is not mandatory unless ATC requires it. Ensure readiness to accommodate inspection criteria at RSP Stores.

Advertisement