TenderDekho Logo
Active GEM

ICAR Procurement LED Panels, LED Linear Hanging Lights & Ceiling Fans Tender India 2026

Bid Publish Date

29-Sep-2026, 1:11 pm

Bid End Date

20-Oct-2026, 2:00 pm

Progress

Issue29-Sep-2026, 1:11 pm
AwardPending

Key Highlights

  • • ICAR procurement for SITC of LED panels, LED linear hanging lights, and ceiling fans across India
  • • Quantity flexibility up to ±25% during contract; delivery timeline adjustments based on extended delivery formula
  • • GST responsibility on bidder; GST invoice and GST payment proof required on GeM portal
  • • Scope includes supply, installation, testing, commissioning, and operator training; statutory clearances if any

Tender Overview

The Indian Council Of Agricultural Research (ICAR) invites bids for the SITC of LED Panel 600mmx600mm, SITC of LED Panel 300mmx300mm, SITC of LED Linear hanging light, and SITC of Ceiling Fan Set 1 and Ceiling Fan Set 2. Estimated value and EMD are not disclosed. Location is national, focusing on supply, installation, testing, commissioning, and operator training with statutory clearances if required. The ATC includes quantity option rights up to ±25% during and after contract award. This is a multi-item procurement intended to modernize lighting and cooling in ICAR facilities.

Technical Specifications & Requirements

  • Product categories: SITC of LED Panels (600x600 mm, 300x300 mm), LED Linear Hanging Light, Ceiling Fan Set 1, Ceiling Fan Set 2
  • Scope of supply: Supply, Installation, Testing, Commissioning, and operator training; includes statutory clearances if applicable
  • Delivery timing: Not specified; option to adjust quantity up to 25% during/after contract with extended delivery period formula
  • Compliance indicators: Specific standards not listed; bidders should align with BIS/IS markings and installation norms as per ATC guidance
  • Financials: EMD and estimated value not disclosed in the document; GST handling per bidder responsibility
  • Documentation: GST invoice submission on GeM portal with GST payment proof
  • ATC notes: Option clause and delivery time calculations apply; bidder undertakes GST and financial due diligence

Terms, Conditions & Eligibility

  • Option clause: Quantity may increase or decrease by up to 25% at contract placement and during the contract at contracted rates
  • GST: Bidders must assess applicable GST; reimbursement follows actuals or the lower applicable rate
  • Financial health: Bidders must not be under liquidation or bankruptcy; an undertaking is required
  • Invoicing: Upload scanned GST invoice and GST portal payment screenshot on GeM
  • Scope of supply: Price must include all costs for supply, installation, testing, commissioning, operator training, and any required statutory clearances
  • ATC compliance: Bidders must review Click-to-view ATC document for additional terms
  • Miscellaneous: Generic terms apply; delivery period and penalties, if any, to be governed by the contract terms

Key Specifications

  • Product names: SITC of LED Panel 600mmX600mm, SITC of LED Panel 300mmX300mm, SITC of LED Linear hanging light, SITC of Ceiling Fan Set 1, SITC of Ceiling Fan Set 2

  • Estimated value and EMD not disclosed in provided data

  • Delivery terms: Option to adjust quantity by ±25%; delivery period derived from original period with minimum 30 days extension rules

  • Quality/standards: No explicit standards listed; bidders should align with typical BIS/IS or OEM requirements as per ATC

  • Installation scope: Supply, Installation, Testing, Commissioning, Operator Training; statutory clearances if required

Terms & Conditions

  • Quantity adjustment up to 25% during and after contract with contracted rates

  • GST liability falls on bidder; invoice and payment proof must be uploaded on GeM

  • Scope includes installation, testing, commissioning, and operator training; statutory clearances if needed

Important Clauses

Payment Terms

GST handling by bidder; payment is processed with GST invoice proof on GeM; coverage of all costs in bid price

Delivery Schedule

Delivery duration calculated by original delivery period; extended period follows (Extended quantity ÷ Original quantity) × Original delivery period with minimum 30 days

Penalties/Liquidated Damages

Penalties, if any, subject to contract terms; not explicitly stated in provided ATC

Bidder Eligibility

  • Not under liquidation or bankruptcy; valid undertaking submitted

  • Experience in SITC of LED lighting or ceiling fan installations

  • Financial statements demonstrating financial stability

Advertisement

Tender Data

Bid Details

Quantity

125

Category

SITC of LED Panel 600mmX600mm

Bid Type

Two Packet Bid

Bid Validity

160 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

15

OEM Avg. Turnover

11

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of LED Panel 600mmX600mm , SITC of LED Linear hanging light , SITC of LED Panel 300mmX300mm , SITC of Ceiling fan Set 1 , SITC of Ceiling fan Set 2

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Pincodes

226002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Arvind Kumar Yadav226002,Raebareli Road, P.O. DilkushaLucknowUttar Pradesh2260025830-

Authority Records

MINISTRY OF AGRICULTURE AND FARMERS WELFAREAGRICULTURAL RESEARCH AND EDUCATION DEPARTMENTINDIAN COUNCIL OF AGRICULTURAL RESEARCH

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9961918.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

SITC of LED Panel 600mmX600mm

Refer specifications

58 nos Delivery: 30 days
#2

SITC of LED Linear hanging light

Refer specifications

18 nos Delivery: 30 days
#3

SITC of LED Panel 300mmX300mm

Refer specifications

18 nos Delivery: 30 days
#4

SITC of Ceiling fan Set 1

Refer specifications

15 nos Delivery: 30 days
#5

SITC of Ceiling fan Set 2

Refer specifications

16 nos Delivery: 30 days
Advertisement

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar SITC lighting and ceiling fan projects

4

Financial statements (audited or equivalent)

5

Bid security/EMD details (if applicable, per ATC)

6

Technical compliance certificates or OEM authorizations (if required by ATC)

7

GST invoice format and GST payment proof (GeM portal)

8

Any statutory clearance certificates (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for ICAR LED panels and ceiling fans tender in India 2026?

Bidders must submit GST registration, PAN, experience certificates for similar SITC projects, financial statements, and GeM portal GST invoice proof. Ensure compliance with ATC terms, and provide OEM authorizations if required. Delivery scope includes installation, testing, commissioning, and operator training.

What documents are required for ICAR lighting tender participation in India?

Required documents include GST registration certificate, PAN card, relevant experience certificates for SITC projects, audited financial statements, proof of EMD (if applicable), technical compliance or OEM authorization, and GST payment proof uploaded on GeM.

What are the delivery terms for ICAR LED panel and fan procurement?

Delivery is subject to a 25% quantity variance during/after award. The delivery period uses the extended formula: (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What standards or certifications are required for ICAR SITC items?

While explicit standards are not listed, bidders should target BIS/ISI or ISO-aligned certifications and OEM specifications as per the ATC. Include any relevant compliance certificates with the bid submission.

How is GST treatment handled for the ICAR procurement bid?

Bidder must determine applicable GST; reimbursement is based on actual GST or the lower rate. GST invoice and GST portal payment proof must be uploaded on GeM during bid submission.

What is the scope of supply for ICAR lighting and ceiling fans tender?

Scope includes supply, installation, testing, commissioning, operator training, and any statutory clearances, with the seller responsible for GST compliance and complete project execution.

Advertisement