Bid Publish Date
07-Apr-2026, 10:19 am
Bid End Date
23-Apr-2026, 5:00 pm
Location
Progress
Quantity
84
Category
Schedule1_100270076_10_T2289605103_SLING ROPE 10MM 12M_For Korba Super Thermal Power
Bid Type
Two Packet Bid
NTPC Limited invites bids to supply a range of sling ropes and webbing for Korba Super Thermal Power. The item set includes 14 schedule lines covering ropes of 6mm to 32mm, lengths from 3m to 12m, and polyester webbings, with mix of galvanized steel and IWRC rope constructions. The order quantity is based on 14 schedule items, with an estimated value not disclosed. The procurement focuses on safe, durable lifting and rigging components for powerhouse operations, with emphasis on material grade and compliance. Bidder compliance to NTPC terms and avoidance of deviations is enforced. Unique context includes adherence to the agreed technical sheets and ATC clauses, and supply-only scope.
14 schedule lines of sling ropes and webbings for Korba NTPC
Diameters: 6MM, 8MM, 10MM, 12MM, 32MM among others
Lengths: 3M, 5M, 6M, 8M, 10M, 12M
Materials: Steel, IWRC, galvanized variants, polyester webbings
Quantities: schedule-based; exact numbers not disclosed
EMD amount and payment terms to be provided in ATC
GST treatment: GST payable/ reimbursable per actuals or rates
Nil deviation clause enforces full compliance with NTPC specifications
GST handling as per actuals or applicable rates; consignee invoicing with GSTIN; scope limited to goods supply.
Delivery terms to be defined in ATC; ensure timely delivery of 14 schedule item parts as per NTPC requirements.
Not specified in data; penalties to be defined in ATC and contract terms.
Experience in supplying lifting ropes and webbing to large industrial stations
Demonstrated GST compliance and proper invoicing to consignee
Financial stability evidenced by recent financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Schedule1_100270076_10_T2289605103_SLING ROPE 10MM 12M_For Korba Super Thermal Power , Schedule2_100270076_20_M2293855811_SLING ROPE STL GALV 6X37 STL 10MM 10M_For Korba Super Thermal Power , Schedule3_100270076_30_T2293716033_SLING ROPE STEEL 6MM 3M_For Korba Super Thermal Power , Schedule4_100270076_40_T2293716060_SLING ROPE STEEL 6MM 6M_For Korba Super Thermal Power , Schedule5_100270076_50_T2293716103_SLING ROPE STEEL 8MM 8M_For Korba Super Thermal Power , Schedule6_100270076_60_T2291212456_SLING ROPE SINGLE LEG 12MM 5M_For Korba Super Thermal Power , Schedule7_100270076_70_T2293960283_SLING ROPE ROUND UNGALV 12MM 8M_For Korba Super Thermal Power , Schedule8_100270076_80_M2293850287_SLING ROPE STL RND 6X36 FC 25MM 8M_For Korba Super Thermal Power , Schedule9_100270076_90_M2291531197_SLING ROPE STL SGL LEG IWRC 7MT 30MM 7M_For Korba Super Thermal Power , Schedule10_100270076_100_T2289525308_SLING ROPE 32MM 10M_For Korba Super Thermal Power , Schedule11_100270076_110_T2293217059_SLING ROPE POLYESTER WEBBING 1MT 3M_For Korba Super Thermal Power , Schedule12_100270076_120_T2299735568_SLING ROPE POLYESTER 1TN 1 5M 3M_For Korba Super Thermal Power , Schedule13_100270076_130_T2293730219_SLING ROPE FLAT WEBBING 5TN 6M_For Korba Super Thermal Power , Schedule14_100270076_140_T2293723325_SLING ROPE 6X37 32MM 8M_For Korba Super Thermal Power
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Schedule1_100270076_10_T2289605103_SLING ROPE 10MM 12M_For Korba Super Thermal Power
SLING ROPE 10MM 12M
Schedule2_100270076_20_M2293855811_SLING ROPE STL GALV 6X37 STL 10MM 10M_For Korba Super Thermal Power
SLING ROPE STL GALV 6X37 STL 10MM 10M
Schedule3_100270076_30_T2293716033_SLING ROPE STEEL 6MM 3M_For Korba Super Thermal Power
SLING ROPE STEEL 6MM 3M
Schedule4_100270076_40_T2293716060_SLING ROPE STEEL 6MM 6M_For Korba Super Thermal Power
SLING ROPE STEEL 6MM 6M
Schedule5_100270076_50_T2293716103_SLING ROPE STEEL 8MM 8M_For Korba Super Thermal Power
SLING ROPE STEEL 8MM 8M
Schedule6_100270076_60_T2291212456_SLING ROPE SINGLE LEG 12MM 5M_For Korba Super Thermal Power
SLING ROPE SINGLE LEG 12MM 5M
Schedule7_100270076_70_T2293960283_SLING ROPE ROUND UNGALV 12MM 8M_For Korba Super Thermal Power
SLING ROPE ROUND UNGALV 12MM 8M
Schedule8_100270076_80_M2293850287_SLING ROPE STL RND 6X36 FC 25MM 8M_For Korba Super Thermal Power
SLING ROPE STL RND 6X36 FC 25MM 8M
Schedule9_100270076_90_M2291531197_SLING ROPE STL SGL LEG IWRC 7MT 30MM 7M_For Korba Super Thermal Power
SLING ROPE STL SGL LEG IWRC 7MT 30MM 7M
Schedule10_100270076_100_T2289525308_SLING ROPE 32MM 10M_For Korba Super Thermal Power
SLING ROPE 32MM 10M
Schedule11_100270076_110_T2293217059_SLING ROPE POLYESTER WEBBING 1MT 3M_For Korba Super Thermal Power
SLING ROPE POLYESTER WEBBING 1MT 3M
Schedule12_100270076_120_T2299735568_SLING ROPE POLYESTER 1TN 1 5M 3M_For Korba Super Thermal Power
SLING ROPE POLYESTER 1TN 1 5M 3M
Schedule13_100270076_130_T2293730219_SLING ROPE FLAT WEBBING 5TN 6M_For Korba Super Thermal Power
SLING ROPE FLAT WEBBING 5TN 6M
Schedule14_100270076_140_T2293723325_SLING ROPE 6X37 32MM 8M_For Korba Super Thermal Power
SLING ROPE 6X37 32MM 8M
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Schedule1_100270076_10_T2289605103_SLING ROPE 10MM 12M_For Korba Super Thermal Power | SLING ROPE 10MM 12M | 6 | no | jitendrakumar45 | 90 | |
| 2 | Schedule2_100270076_20_M2293855811_SLING ROPE STL GALV 6X37 STL 10MM 10M_For Korba Super Thermal Power | SLING ROPE STL GALV 6X37 STL 10MM 10M | 6 | no | jitendrakumar45 | 90 | |
| 3 | Schedule3_100270076_30_T2293716033_SLING ROPE STEEL 6MM 3M_For Korba Super Thermal Power | SLING ROPE STEEL 6MM 3M | 6 | no | jitendrakumar45 | 90 | |
| 4 | Schedule4_100270076_40_T2293716060_SLING ROPE STEEL 6MM 6M_For Korba Super Thermal Power | SLING ROPE STEEL 6MM 6M | 6 | no | jitendrakumar45 | 90 | |
| 5 | Schedule5_100270076_50_T2293716103_SLING ROPE STEEL 8MM 8M_For Korba Super Thermal Power | SLING ROPE STEEL 8MM 8M | 6 | no | jitendrakumar45 | 90 | |
| 6 | Schedule6_100270076_60_T2291212456_SLING ROPE SINGLE LEG 12MM 5M_For Korba Super Thermal Power | SLING ROPE SINGLE LEG 12MM 5M | 6 | no | jitendrakumar45 | 90 | |
| 7 | Schedule7_100270076_70_T2293960283_SLING ROPE ROUND UNGALV 12MM 8M_For Korba Super Thermal Power | SLING ROPE ROUND UNGALV 12MM 8M | 6 | no | jitendrakumar45 | 90 | |
| 8 | Schedule8_100270076_80_M2293850287_SLING ROPE STL RND 6X36 FC 25MM 8M_For Korba Super Thermal Power | SLING ROPE STL RND 6X36 FC 25MM 8M | 6 | no | jitendrakumar45 | 90 | |
| 9 | Schedule9_100270076_90_M2291531197_SLING ROPE STL SGL LEG IWRC 7MT 30MM 7M_For Korba Super Thermal Power | SLING ROPE STL SGL LEG IWRC 7MT 30MM 7M | 6 | no | jitendrakumar45 | 90 | |
| 10 | Schedule10_100270076_100_T2289525308_SLING ROPE 32MM 10M_For Korba Super Thermal Power | SLING ROPE 32MM 10M | 6 | no | jitendrakumar45 | 90 | |
| 11 | Schedule11_100270076_110_T2293217059_SLING ROPE POLYESTER WEBBING 1MT 3M_For Korba Super Thermal Power | SLING ROPE POLYESTER WEBBING 1MT 3M | 6 | no | jitendrakumar45 | 90 | |
| 12 | Schedule12_100270076_120_T2299735568_SLING ROPE POLYESTER 1TN 1 5M 3M_For Korba Super Thermal Power | SLING ROPE POLYESTER 1TN 1 5M 3M | 6 | no | jitendrakumar45 | 90 | |
| 13 | Schedule13_100270076_130_T2293730219_SLING ROPE FLAT WEBBING 5TN 6M_For Korba Super Thermal Power | SLING ROPE FLAT WEBBING 5TN 6M | 6 | no | jitendrakumar45 | 90 | |
| 14 | Schedule14_100270076_140_T2293723325_SLING ROPE 6X37 32MM 8M_For Korba Super Thermal Power | SLING ROPE 6X37 32MM 8M | 6 | no | jitendrakumar45 | 90 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of lifting and rigging ropes
Financial statements or balance sheets for last 2-3 years
EMD/Security deposit documents as per ATC
Technical bid documents aligned with item specifications
OEM authorization letters (if applicable for branded items)
Any GST-related documentation and consignee GSTIN
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ASIAN CHAIN INDUSTRIES Under PMA | - | 23-04-2026 16:30:40 | |
| 2 | REPUBLIC HARDWARE STORES Under PMA | - | 13-04-2026 14:14:58 | |
| 3 | TEJWALA ENGINEERING COMPANY Under PMA | - | 23-04-2026 16:56:28 | |
| 4 | VIKRANT & CO. Under PMA | - | 23-04-2026 16:40:29 | |
| 5 | WIRE ROPE INDIA Under PMA | - | 23-04-2026 13:04:15 |
Key insights about CHHATTISGARH tender market
Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD documents, and OEM authorizations per NTPC ATC. Ensure full compliance with the Nil Deviation Clause and attach complete technical specifications for each schedule line. Delivery terms and payment terms will be clarified in the ATC; prepare to meet goods-only scope.
Required documents include GST certificate, PAN, experience certificates for lifting gear supply, financial statements for last 2-3 years, EMD, technical bid documents, OEM authorizations if applicable, and consignee GSTIN details for invoicing. All documents must align with ATC clauses and bid sheets.
Specifications cover 14 schedule lines with diameters from 6MM to 32MM and lengths up to 12M, including steel, galvanised, and IWRC rope variants, plus polyester webbings and flat webbings. While exact quantities are undisclosed, ensure compliance with item sheets and attached technical specifications in ATC.
Delivery schedule will be defined in the ATC; the scope is goods only. Payment terms to be specified in ATC, with GST handling per actuals or applicable rates. Prepare for timely delivery aligned with NTPC project schedules and invoicing per consignee GSTIN.
EMD amount is not disclosed in the data and is defined in the ATC. Eligibility requires prior experience in similar lifting gear supply, GST registration, financial stability, and compliance with Nil Deviation Clause. Ensure OEM authorization where needed and full compliance with NTPC terms.
Standards are not explicitly listed in the available data; bidders should follow NTPC ATC terms and any attached technical sheets. Expect demand for quality control aligned with industry practices and supplier certifications per NTPC specification documents.
Scope specifies supply of goods only for 14 rope/webbing schedules. Confirm per-schedule item descriptions in the ATC, including diameters, lengths, and material type. Ensure your bid reflects all cost components with no deviation from NTPC terms.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS