Bid Publish Date
28-Sep-2026, 5:31 pm
Bid End Date
14-Oct-2026, 6:00 pm
Location
Progress
Nagar Panchayat Bhairamgarh (Urban Administration And Development) invites bids for LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2) in BIJAPUR, CHHATTISGARH. Tender scope references a flexible quantity model with a 25% bid quantity option and corresponding delivery timelines. The procurement emphasizes adherence to IS 10322 standards, with design drawings required post-award and a formal approval cycle prior to fabrication. The contract contemplates dynamic order quantities during execution and a defined path for EMD via Fixed Deposit Receipt (FDR) as an acceptable security method. A GST framework is noted, with reimbursement aligned to actuals or the quoted rate, whichever is lower. The BOQ shows no line items, indicating a possible single-line or vendor-wide supply requirement under this category. The primary differentiator is the integration of post-award design validation and modifications via buyer approvals, ensuring product conformance to IS 10322 standards and the specific V3 revision.
Delivery period linked to last delivery order date; extended delivery time formula with minimum 30 days
EMD acceptable via FDR; hard copy required within 5 days of bid end/open
Post-award design approval process; 5-day submission, 7-day modification cycle
GST handling borne by bidder; reimbursement as actuals or lower quoted rate; no fixed GST burden by buyer
Delivery period calculated from last date of original delivery order; option to extend with minimum 30 days
LD terms not explicitly stated; delivery delays linked to drawing approvals may shift delivery schedule without LD
Not under liquidation, court receivership, or bankruptcy
Demonstrable experience in LED luminaire supply or related electro-mechanical procurement
Financial stability with auditable financial statements
Quantity
338
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
20
Past Performance
80 %
Warranty Period
1 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bijapur
Delivery Pincodes
494450
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mausam Gupta | 494450,Nagar Panchayat Bhairamgarh, Sanjay Para, Bijapur Chhatisgarh | Bijapur | Chhattisgarh | 494450 | 338 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
14-Oct-2026, 12:30 pm
Opening Date
15-Oct-2026, 12:30 pm
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD document (DD/FDR or online payment proof)
Technical bid documents
OEM authorizations (if applicable)
Data Sheet of offered product
Key insights about CHHATTISGARH tender market
Bidders should submit GST, PAN, financials, experience certificates, EMD via DD/FDR, and the Data Sheet with the technical bid. Ensure post-award Detailed Design Drawings are prepared within 5 days and approved within 7 days to avoid schedule shifts. Compliance with IS 10322 (V3) is mandatory.
Required documents include GST certificate, PAN card, experience certificates, financial statements, EMD proof (FDR or online), OEM authorizations if applicable, technical bid, and product Data Sheet aligned to IS 10322 (Part 5/Section 3) (V3). Upload with bid submission.
Up to 25% quantity variation is permitted at contract award and during execution. Delivery period starts from the last date of the original order, with extended delivery calculated as (increased quantity ÷ original quantity) × original period, minimum 30 days.
EMD can be submitted as a fixed deposit receipt (FDR) in favor of A/C CMO 5/10 or via standard bid deposit; scanned proof must be uploaded with the bid and the hard copy delivered within 5 days after bid end/opening.
Submit Detailed Design Drawings within 5 days of award; buyer will approve or provide a modification list within 7 days. Any delay in approval postpones the delivery schedule unless extended as per option terms.
Luminaires must conform to IS 10322 (Part 5/Section 3) (V3) (Q2). Bidder must provide Data Sheets that match the standard; non-compliant items will be disqualified during verification against product specifications.
GST is bidder responsibility; reimbursement will be provided to the bidder based on actuals or the quoted GST rate, whichever is lower, subject to applicable rates. Ensure GST registration is current and reflected in bids.
Submit a complete Data Sheet for each offered LED luminaire, including electrical ratings, lumen output, efficiency, IP rating, operating temperature, and wiring diagram; ensure it matches IS 10322 (V3) specifications for verification with buyer data.