TenderDekho Logo
Closed GEM

Indian Army EOI for 200-Item Procurement Pune Maharashtra 410301 2025 - EOI/ATC Request, No Specifications

Bid Publish Date

02-Jan-2026, 5:27 pm

Bid End Date

15-Jan-2026, 6:00 pm

Value

₹200

Generate Docs

Progress

Issue02-Jan-2026, 5:27 pm
Corrigendum12-Jan-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

200

Category

LV1 MTLB 8-02-029 BRANCH PIPE

Bid Type

Two Packet Bid

Categories 104

AGITATORS WIND MILL ENERGY PROJECT CABIN PLATFORM SCALE ANIMAL WATERING MACHINES MISCELLANEOUS VALVE SHAFT SUPPLY RING PRECIOUS METAL SCRAP STRUCTURE FABRICATION AIR CYLINDERS TUBE AND FITTING AIR COOLED ENGINE DESERT COOLER MATERIAL HANDLING MACHINERY HEAVY EQUIPMENT COMPONENT PROCESS INDICATOR HEATING EQUIPMENTS BEARINGS BUSHINGS AND GEARS WRENCH SPRAYER STEEL FURNITURE HYDRAULIC PART AIR REGULATORS GEYSER WELL TESTING EQUIPMENTS SUPPLY OF SCHOOL UNIFORM INDUSTRIAL WHEEL RUBBER GASKET RADAR AND SONAR SYSTEMS AND COMPONENTS FLANGE PARTS OF GUNS MILITARY VEHICLE PANEL INDICATING AND RECORDING INSTRUMENTS NOZZLE ENGINE POWER PRESSURE INDICATORS SEALING RING COUPLER DAM BRACKET BLASTING MACHINE HYDRAULIC BRAKE FABRIC ROTATING PISTON PUMPS GLUCOSE MONITORS LABORATORY PRESSES HYDRO FLUID BAG FILTER GOLF EQUIPMENT PNEUMATIC IDLER WHEEL PRESSURE GAUGE GASKETS AND SEALS HYDRAULIC MACHINES PRESSURE REGULATOR SPORT VEHICLE EXPLOSIVES VALVE DISPLACEMENT PUMP PRESSURE MEASURING AND CONTROL INSTRUMENTS FILTER RETAINERS GEAR ERECTION OF STRUCTURAL WORM GEAR TURBINE PUMPS STEAM GENERATOR AIRCRAFT HYDRAULIC SYSTEMS EXHAUST SYSTEM FLUORESCENT LAMP POLLUTION CONTROL SYSTEM BRAKE HYDRAULIC ENGINES ANAESTHESIA MACHINE HYDRAULIC SYSTEM WINCH HYDRAULIC PUMP BOILER MOUNTING VALVE CABLE FIRE BREATHING APPARATUS HYDRAULIC CYLINDER FABRICATOR STARTER GAUGE GAS PIPELINE FILTERS VALVE PARTS AND ACCESSORIES SOLID ROCKET MOTORS FLOAT VALVES WATER COOLED ENGINE ROTARY PUMP PULLING MACHINE BOILER VALVE HYDRAULIC WATER PUMP ELECTROMAGNET FAN METAL PRODUCTS BAR BOYLES APPARATUS BUSH POLYMERASE CHAIN REACTION PCR MANUFACTURING SERVICES

Tender Overview

The Indian Army, Department Of Military Affairs, released an EOI for a bulk procurement project in Pune, Maharashtra 410301. The scope lists a total of 200 items with no itemized specifications or technical details provided in the BOQ. The estimated value is 200.0 (currency not specified). Bidders must submit the EOI documents to the designated email address within 10 days of publication. This tender emphasizes an information-gathering solicitation rather than a fixed- specification purchase, with a focus on supplier qualification and readiness to participate in later stages. The unique aspect is the explicit absence of product-level specs, signaling potential follow-on bidding with detailed technical parameters.

Technical Specifications & Requirements

  • Total Items: 200 items in the BOQ.
  • Specifications: Not provided within the tender data; no IS/ISO requirements listed.
  • Submission Method: Email-based EOI submission to [email protected] within 10 days of publication.
  • Estimated Value: 200.0 (currency not specified).
  • Location: Pune, Maharashtra (410301).
  • Buyer Process: Includes an uploaded ATC document referenced in the tender, indicating additional terms may accompany the EOI.
  • Context: This is an Army procurement process with an emphasis on pre-qualification rather than immediate supply of goods.

Terms, Conditions & Eligibility

  • EOI submission window: 10 days from publication to the email address [email protected].
  • Total BOQ items: 200 (no item-specific specifications provided).
  • Estimated value: 200.0 (no currency specified).
  • Location: Pune, Maharashtra 410301.
  • EMD: Not specified in the available data.
  • Documentation flow: Refer to Buyer Added ATC and ATC document for additional conditions.
  • Next steps: Likely follow-on tender with detailed specs post-EOI acceptance.

Key Specifications

  • Total BOQ items: 200

  • No product-level specifications provided in tender data

  • Submission email: [email protected] with 10-day window

  • Estimated value: 200.0 (currency unspecified)

  • Location: Pune, Maharashtra 410301

  • ATC document uploaded; potential additional terms

Terms & Conditions

  • EOI submission deadline: 10 days via email

  • Total quantity: 200 items; no specs in BOQ

  • Estimated value: 200.0; currency not stated

Important Clauses

Submission Method

EOI documents must be emailed to [email protected] within 10 days of publication.

BoQ Details

BOQ lists 200 total items with no itemized specifications provided in this data.

ATC Documents

ATC and uploaded documents may contain additional terms; bidders must review.

Bidder Eligibility

  • Ability to participate in government EOI processes for military procurement

  • Compliance with email-based bid submission requirements

  • Demonstrated experience in bulk procurement or similar scale projects

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8661913.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 200 Items Sign in for GEM prices

#201

LV1 MTLB 8-02-029 BRANCH PIPE

LV1 MTLB 8-02-029 BRANCH PIPE

1 nos Delivery: 630 days
#202

LV1 MTLB TU-37-003-756-76 WIND SHIELD WIPER SL-231L

LV1 MTLB TU-37-003-756-76 WIND SHIELD WIPER SL-231L

1 nos Delivery: 630 days
#203

LV3 MTLB RS103-3708000 MTLB STARTER SOLENOID SWITCH

LV3 MTLB RS103-3708000 MTLB STARTER SOLENOID SWITCH

1 nos Delivery: 630 days
#204

LV3 MTLB G 273B-3701000 GENERATOR

LV3 MTLB G 273B-3701000 GENERATOR

1 nos Delivery: 630 days
#205

LV3 MTLB 201-1117036-A2 FILTER ELEMENT

LV3 MTLB 201-1117036-A2 FILTER ELEMENT

1 nos Delivery: 630 days
#206

LV3 MTLB 238-NB-1308050 FAN DRIVE SHAFT

LV3 MTLB 238-NB-1308050 FAN DRIVE SHAFT

1 nos Delivery: 630 days
#207

LV3 MTLB 238HB-1017010-A4 MTL SECONDARY OIL FILTER

LV3 MTLB 238HB-1017010-A4 MTL SECONDARY OIL FILTER

1 nos Delivery: 630 days
#208

LV3 MTLB SKST1033708000 STARTER

LV3 MTLB SKST1033708000 STARTER

1 nos Delivery: 630 days
#209

LV3 MTLB 238-BM-1000410-VPS ENGINE RMZ-238-BM STRELLA 10M

LV3 MTLB 238-BM-1000410-VPS ENGINE RMZ-238-BM STRELLA 10M

1 nos Delivery: 630 days
#210

LV1 MTLB 701-08-SB197A PVRV

LV1 MTLB 701-08-SB197A PVRV

1 nos Delivery: 630 days
#211

LV1 MTLB 8-32-121 GASKET

LV1 MTLB 8-32-121 GASKET

1 nos Delivery: 630 days
#212

LV1 MTLB 8-03-038 FILTER

LV1 MTLB 8-03-038 FILTER

1 nos Delivery: 630 days
#213

LV1 MTLB 8-03-020 PIPE ASSY FUEL FEED PUMP

LV1 MTLB 8-03-020 PIPE ASSY FUEL FEED PUMP

1 nos Delivery: 630 days
#214

LV1 MTLB 236-1601203-B2 CLUTCH RELEASE FORK

LV1 MTLB 236-1601203-B2 CLUTCH RELEASE FORK

1 nos Delivery: 630 days
#215

LV1 MTLB 8-50-068 CABIN FAN

LV1 MTLB 8-50-068 CABIN FAN

1 nos Delivery: 630 days
#216

LV1 MTLB 8-34-014 RUBBERISED PIN

LV1 MTLB 8-34-014 RUBBERISED PIN

1 nos Delivery: 630 days
#217

LV1 MTLB 8-02-017 RADIATOR

LV1 MTLB 8-02-017 RADIATOR

1 nos Delivery: 630 days
#218

LV3 MTLB 240-1017078-A FILTER BOWL

LV3 MTLB 240-1017078-A FILTER BOWL

1 nos Delivery: 630 days
#219

LV1 MTLB 8-07-019 OIL COLLER ASSY

LV1 MTLB 8-07-019 OIL COLLER ASSY

1 nos Delivery: 630 days
#220

LV1 MTLB 8-03-261-02 HOSE

LV1 MTLB 8-03-261-02 HOSE

1 nos Delivery: 630 days
#221

LV1 MTLB 832-019 BOGIE WHEEL ROAD WHEEL ASSY

LV1 MTLB 832-019 BOGIE WHEEL ROAD WHEEL ASSY

1 nos Delivery: 630 days
#222

LV1 MTLB 8-32-108 TORSION BAR

LV1 MTLB 8-32-108 TORSION BAR

1 nos Delivery: 630 days
#223

LV1 MTLB 100-3057 PUMP

LV1 MTLB 100-3057 PUMP

1 nos Delivery: 630 days
#224

LV1 MTLB TU-16-535-853-79 LAMP GN 28-10

LV1 MTLB TU-16-535-853-79 LAMP GN 28-10

1 nos Delivery: 630 days
#225

LV1 MTLB OST-3-1406-72 PORTABLE FILLING DEVICE MZA-3

LV1 MTLB OST-3-1406-72 PORTABLE FILLING DEVICE MZA-3

1 nos Delivery: 630 days
#226

Z6 R90 KDS1 2S 012 RACK

Z6 R90 KDS1 2S 012 RACK

1 nos Delivery: 630 days
#227

Z6 R90 KDS1 2S 200 UNIT

Z6 R90 KDS1 2S 200 UNIT

1 nos Delivery: 630 days
#228

Z6 R90 BAS6 210 LANDING GEAR

Z6 R90 BAS6 210 LANDING GEAR

1 nos Delivery: 630 days
#229

Z6 R90 EDM 14 180 TRAVERSE

Z6 R90 EDM 14 180 TRAVERSE

1 nos Delivery: 630 days
#230

Z6 R90 B13 350 UNIT

Z6 R90 B13 350 UNIT

1 nos Delivery: 630 days
#231

K9 TUNG MTO-ATG-M1 NNK CCES WRENCH

K9 TUNG MTO-ATG-M1 NNK CCES WRENCH

1 nos Delivery: 630 days
#232

K9 TUNG GO27 NB TG-5-886-001 MS-751 FILTER

K9 TUNG GO27 NB TG-5-886-001 MS-751 FILTER

1 nos Delivery: 630 days
#233

K9 TUNG GO27 NB TG-5-886-003 MS-752 FILTER

K9 TUNG GO27 NB TG-5-886-003 MS-752 FILTER

1 nos Delivery: 630 days
#234

LV1 TUNG 352-1110050 TRANSMISSION

LV1 TUNG 352-1110050 TRANSMISSION

1 nos Delivery: 630 days
#235

LV1 TUNG OYUO-481-021TU MS-10 FUSE LINKS VPB 6-23

LV1 TUNG OYUO-481-021TU MS-10 FUSE LINKS VPB 6-23

1 nos Delivery: 630 days
#236

LV1 TUNG OST 3-408-70 ISG-214 SHAFT

LV1 TUNG OST 3-408-70 ISG-214 SHAFT

1 nos Delivery: 630 days
#237

LV1 TUNG 352-2202050D MS-150 POWER REDUCTION GEAR

LV1 TUNG 352-2202050D MS-150 POWER REDUCTION GEAR

1 nos Delivery: 630 days
#238

LV1 TUNG NPN 161 MS 261 HYDRO MOTOR WITH DRIVE

LV1 TUNG NPN 161 MS 261 HYDRO MOTOR WITH DRIVE

1 nos Delivery: 630 days
#239

LV1 TUNG NPN 163 MS 237 IDLER WHEEL WITH BEARING RT SIDE

LV1 TUNG NPN 163 MS 237 IDLER WHEEL WITH BEARING RT SIDE

1 nos Delivery: 630 days
#240

LV1 TUNG 5393-1 CES-138 FABRIC FILTER

LV1 TUNG 5393-1 CES-138 FABRIC FILTER

1 nos Delivery: 630 days
#241

LV1 TUNG 306-400K SB2 CES-79 WRENCH

LV1 TUNG 306-400K SB2 CES-79 WRENCH

1 nos Delivery: 630 days
#242

LV1 TUNG NPN 204 MS 258 SAFETY VALVE

LV1 TUNG NPN 204 MS 258 SAFETY VALVE

1 nos Delivery: 630 days
#243

LV1 TUNG ATS4-496-007 MS-466 ELCETRICALY HEATED PROTECTIVE GLASS Z15

LV1 TUNG ATS4-496-007 MS-466 ELCETRICALY HEATED PROTECTIVE GLASS Z15

1 nos Delivery: 630 days
#244

LV1 TUNG 352-1210111 MS-158 BOLT

LV1 TUNG 352-1210111 MS-158 BOLT

1 nos Delivery: 630 days
#245

LV3 TUNG GTE PB6-450-230 HOSE PERISHABLE

LV3 TUNG GTE PB6-450-230 HOSE PERISHABLE

1 nos Delivery: 630 days
#246

LV3 TUNG GTE 91156-9 21-00-10-000 GTE ASSY 9E 56-9

LV3 TUNG GTE 91156-9 21-00-10-000 GTE ASSY 9E 56-9

1 nos Delivery: 630 days
#247

LV3 TUNG NPN 245 MS 164 PUMP WITH ELECTRIC MOTOR

LV3 TUNG NPN 245 MS 164 PUMP WITH ELECTRIC MOTOR

1 nos Delivery: 630 days
#248

LV1 TUNG TU25-02-110461-85 MS PRESSURE GAUGE RECEIVER PD-IT-1 5 MPA-K4

LV1 TUNG TU25-02-110461-85 MS PRESSURE GAUGE RECEIVER PD-IT-1 5 MPA-K4

1 nos Delivery: 630 days
#249

LV1 TUNG NNK 7 CCES 20 SELF RECOVERY LOG

LV1 TUNG NNK 7 CCES 20 SELF RECOVERY LOG

1 nos Delivery: 630 days
#250

LV1 TUNG 569-1623130 CES-139 DRAIN HOSE

LV1 TUNG 569-1623130 CES-139 DRAIN HOSE

1 nos Delivery: 630 days
#251

LV1 TUNG TU 16522001-76 MS-30 SAFETY FUSE TV-2 30V

LV1 TUNG TU 16522001-76 MS-30 SAFETY FUSE TV-2 30V

1 nos Delivery: 630 days
#252

K9 TUNG NBC LO-2-09-00-07-00-000 EXTENSION PIECE

K9 TUNG NBC LO-2-09-00-07-00-000 EXTENSION PIECE

1 nos Delivery: 630 days
#253

Z7 6220-000615 LIGHT UNIT HEAD LIGHT

Z7 6220-000615 LIGHT UNIT HEAD LIGHT

1 nos Delivery: 630 days
#254

LV1 VT-72B MISC-1183-70-0131 INTER CONNECTING CABLE 15 M

LV1 VT-72B MISC-1183-70-0131 INTER CONNECTING CABLE 15 M

1 nos Delivery: 630 days
#255

LV1 VT-72B 1211-95-9120 HOSES SET

LV1 VT-72B 1211-95-9120 HOSES SET

1 nos Delivery: 630 days
#256

LV1 VT-72B BV-9139999571 HOSE 725 13 4040 450

LV1 VT-72B BV-9139999571 HOSE 725 13 4040 450

1 nos Delivery: 630 days
#257

LV1 VT-72B BV-9139999574 HOSE 722-10-1010 1000

LV1 VT-72B BV-9139999574 HOSE 722-10-1010 1000

1 nos Delivery: 630 days
#258

LV1 VT-72B BV-9139999581 HOSE 722-10-1010 600

LV1 VT-72B BV-9139999581 HOSE 722-10-1010 600

1 nos Delivery: 630 days
#259

LV1 VT-72B 1181-91-9137 ROLLER

LV1 VT-72B 1181-91-9137 ROLLER

1 nos Delivery: 630 days
#260

LV1 VT-72B 1183-78-9076 PIPE 1183-78-9076

LV1 VT-72B 1183-78-9076 PIPE 1183-78-9076

1 nos Delivery: 630 days
#261

LV1 VT-72B 1183-78-9075 PIPE 1183-78-9075

LV1 VT-72B 1183-78-9075 PIPE 1183-78-9075

1 nos Delivery: 630 days
#262

LV1 VT-72B 1183-78-9015 PIN DISTRIBUTION 3 1183-78-9015

LV1 VT-72B 1183-78-9015 PIN DISTRIBUTION 3 1183-78-9015

1 nos Delivery: 630 days
#263

LV1 VT-72B 1183-69-9102 NUT 1183-69-9102

LV1 VT-72B 1183-69-9102 NUT 1183-69-9102

1 nos Delivery: 630 days
#264

LV1 VT-72B 1181-33-9110 FLOAT VALVE 1181-33-9110

LV1 VT-72B 1181-33-9110 FLOAT VALVE 1181-33-9110

1 nos Delivery: 630 days
#265

LV1 VT-72B 1181-60-9127 PIPE 1181-60-9127

LV1 VT-72B 1181-60-9127 PIPE 1181-60-9127

1 nos Delivery: 630 days
#266

LV1 VT-72B 1183-69-9100 RIGHT BRACKET

LV1 VT-72B 1183-69-9100 RIGHT BRACKET

1 nos Delivery: 630 days
#267

LV1 VT-72B 1181-60-9118 PIPE 1181-60-9118

LV1 VT-72B 1181-60-9118 PIPE 1181-60-9118

1 nos Delivery: 630 days
#268

LV1 VT-72B 1181-33-9144 FLANGE 1181-33-9144

LV1 VT-72B 1181-33-9144 FLANGE 1181-33-9144

1 nos Delivery: 630 days
#269

LV1 VT-72B 1183-78-9012 CRANE JIB BLOCK

LV1 VT-72B 1183-78-9012 CRANE JIB BLOCK

1 nos Delivery: 630 days
#270

LV1 VT-72B 1183-69-9009 LOADING CAPACITY INDICATOR

LV1 VT-72B 1183-69-9009 LOADING CAPACITY INDICATOR

1 nos Delivery: 630 days
#271

LV1 VT-72B 1183-69-0151 SHORT SLIDE 1183-69-0151

LV1 VT-72B 1183-69-0151 SHORT SLIDE 1183-69-0151

1 nos Delivery: 630 days
#272

LV1 VT-72B 1183-51-9104 ARM WITH BUSH OF 2ND RIGHT SUSPENSION

LV1 VT-72B 1183-51-9104 ARM WITH BUSH OF 2ND RIGHT SUSPENSION

1 nos Delivery: 630 days
#273

LV1 VT-72B 1183-51-9105 ARM WITH BUSH OF 6TH RIGHT SUSPENSION

LV1 VT-72B 1183-51-9105 ARM WITH BUSH OF 6TH RIGHT SUSPENSION

1 nos Delivery: 630 days
#274

LV1 VT-72B 1181-33-9145 PIPE COUPLING

LV1 VT-72B 1181-33-9145 PIPE COUPLING

1 nos Delivery: 630 days
#275

LV1 VT-72B 1183-69-0146 PIN 1183-69-0146

LV1 VT-72B 1183-69-0146 PIN 1183-69-0146

1 nos Delivery: 630 days
#276

LV1 VT-72B 1183-69-0147 PIN 1183-69-0147

LV1 VT-72B 1183-69-0147 PIN 1183-69-0147

1 nos Delivery: 630 days
#277

LV1 VT-72B 1181-60-9112 PIPE 1181-60-9112

LV1 VT-72B 1181-60-9112 PIPE 1181-60-9112

1 nos Delivery: 630 days
#278

LV1 VT-72B 1181-33-9103 FRONT RIGHT TANK

LV1 VT-72B 1181-33-9103 FRONT RIGHT TANK

1 nos Delivery: 630 days
#279

LV1 VT-72B 1181-33-9106 EQUALIZATION BASIN 1181-33-9106

LV1 VT-72B 1181-33-9106 EQUALIZATION BASIN 1181-33-9106

1 nos Delivery: 630 days
#280

LV1 VT-72B 1183-76-0051 RING 1183-76-0051

LV1 VT-72B 1183-76-0051 RING 1183-76-0051

1 nos Delivery: 630 days
#281

LV1 VT-72B 1181-45-9005 FINAL DRIVE MAJOR ASSY

LV1 VT-72B 1181-45-9005 FINAL DRIVE MAJOR ASSY

1 nos Delivery: 630 days
#282

LV1 VT-72B 1181-45-9105 OUTPUT SHAFT

LV1 VT-72B 1181-45-9105 OUTPUT SHAFT

1 nos Delivery: 630 days
#283

LV1 VT-72B 1181-57-0010 GEAR 1181-57-0010

LV1 VT-72B 1181-57-0010 GEAR 1181-57-0010

1 nos Delivery: 630 days
#284

LV1 VT-72B 1183-76-0057 FUSE 1183-76-0057

LV1 VT-72B 1183-76-0057 FUSE 1183-76-0057

1 nos Delivery: 630 days
#285

LV1 VT-72B SSL-70-ZSSR BEARING SSL 70-ZSSR

LV1 VT-72B SSL-70-ZSSR BEARING SSL 70-ZSSR

1 nos Delivery: 630 days
#286

LV1 VT-72B 1181-45-9115 DISTRIBUTION OIL 1181-45-9115

LV1 VT-72B 1181-45-9115 DISTRIBUTION OIL 1181-45-9115

1 nos Delivery: 630 days
#287

LV1 VT-72B 1181-45-9116 PIPE 1181-45-9116

LV1 VT-72B 1181-45-9116 PIPE 1181-45-9116

1 nos Delivery: 630 days
#288

LV1 VT-72B 1181-59-9208 CARRIER

LV1 VT-72B 1181-59-9208 CARRIER

1 nos Delivery: 630 days
#289

LV1 VT-72B 1181-59-0080 PISTON 1181-59-0080

LV1 VT-72B 1181-59-0080 PISTON 1181-59-0080

1 nos Delivery: 630 days
#290

LV1 VT-72B 1181-59-0092 BUSH 1181-59-0092

LV1 VT-72B 1181-59-0092 BUSH 1181-59-0092

1 nos Delivery: 630 days
#291

LV1 VT-72B 1181-59-0041 BEARING BUSH 1181-59-0041

LV1 VT-72B 1181-59-0041 BEARING BUSH 1181-59-0041

1 nos Delivery: 630 days
#292

LV1 VT-72B 1181-59-0039 CHAIN WHEEL 1181-59-0039

LV1 VT-72B 1181-59-0039 CHAIN WHEEL 1181-59-0039

1 nos Delivery: 630 days
#293

LV1 VT-72B 1181-59-0089 PLANET WHEEL PIN 1181-59-0089

LV1 VT-72B 1181-59-0089 PLANET WHEEL PIN 1181-59-0089

1 nos Delivery: 630 days
#294

LV1 VT-72B 1181-57-0025 PIN 1181-57-0025

LV1 VT-72B 1181-57-0025 PIN 1181-57-0025

1 nos Delivery: 630 days
#295

LV1 VT-72B 1181-57-0013 GEAR 1181-57-0013

LV1 VT-72B 1181-57-0013 GEAR 1181-57-0013

1 nos Delivery: 630 days
#296

LV1 VT-72B 1181-57-0026 PIN 1181-57-0026

LV1 VT-72B 1181-57-0026 PIN 1181-57-0026

1 nos Delivery: 630 days
#297

LV1 VT-72B 1181-57-0015 GEAR 1181-57-0015

LV1 VT-72B 1181-57-0015 GEAR 1181-57-0015

1 nos Delivery: 630 days
#298

LV1 VT-72B 1181-57-0017 COUPLING 1181-57-0017

LV1 VT-72B 1181-57-0017 COUPLING 1181-57-0017

1 nos Delivery: 630 days
#299

LV1 VT-72B 1181-57-0019 GUFERO BODY 1181-57-0019

LV1 VT-72B 1181-57-0019 GUFERO BODY 1181-57-0019

1 nos Delivery: 630 days
#300

LV1 VT-72B 1181-57-0028 WASHER 1181-57-0028

LV1 VT-72B 1181-57-0028 WASHER 1181-57-0028

1 nos Delivery: 630 days
#301

LV1 VT-72B 1181-57-0011 GEAR IDLE 1181-57-0011

LV1 VT-72B 1181-57-0011 GEAR IDLE 1181-57-0011

1 nos Delivery: 630 days
#302

LV1 VT-72B 1181-57-0024 SHAFT 1181-57-0024

LV1 VT-72B 1181-57-0024 SHAFT 1181-57-0024

1 nos Delivery: 630 days
#303

LV1 VT-72B 1181-57-0012 IDLE GEAR 1181-57-0012

LV1 VT-72B 1181-57-0012 IDLE GEAR 1181-57-0012

1 nos Delivery: 630 days
#304

LV1 VT-72B 1181-59-0087 SATELLITE 1181-59-0087

LV1 VT-72B 1181-59-0087 SATELLITE 1181-59-0087

1 nos Delivery: 630 days
#305

LV1 VT-72B 1181-59-9001 AUXILIARY WINCH

LV1 VT-72B 1181-59-9001 AUXILIARY WINCH

1 nos Delivery: 630 days
#306

LV1 VT-72B 1181-59-9111 RING 1181-59-9111

LV1 VT-72B 1181-59-9111 RING 1181-59-9111

1 nos Delivery: 630 days
#307

LV1 VT-72B 1181-59-0255 PIN 1181-59-0255

LV1 VT-72B 1181-59-0255 PIN 1181-59-0255

1 nos Delivery: 630 days
#308

LV1 VT-72B 1183-76-0049 PIN 1183-76-0049

LV1 VT-72B 1183-76-0049 PIN 1183-76-0049

1 nos Delivery: 630 days
#309

LV1 VT-72B 1181-59-9119 GUIDE BOLT 1181-59-9119

LV1 VT-72B 1181-59-9119 GUIDE BOLT 1181-59-9119

1 nos Delivery: 630 days
#310

LV1 VT-72B CSN-02-4630 BEARING 6314 A TPX

LV1 VT-72B CSN-02-4630 BEARING 6314 A TPX

1 nos Delivery: 630 days
#311

LV1 VT-72B 1183-76-0007 FLANGE 1183-76-0007

LV1 VT-72B 1183-76-0007 FLANGE 1183-76-0007

1 nos Delivery: 630 days
#312

LV1 VT-72B CSN-02-4630 6008 BEARING 6008 VS

LV1 VT-72B CSN-02-4630 6008 BEARING 6008 VS

1 nos Delivery: 630 days
#313

LV1 VT-72B CSN-02-4630 6215 BEARING 6215 A

LV1 VT-72B CSN-02-4630 6215 BEARING 6215 A

1 nos Delivery: 630 days
#314

LV1 VT-72B CSN-02-4630 BEARING 6312 A TPX

LV1 VT-72B CSN-02-4630 BEARING 6312 A TPX

1 nos Delivery: 630 days
#315

LV1 VT-72B CSN-02-4630 6216 BEARING 6216 TPX

LV1 VT-72B CSN-02-4630 6216 BEARING 6216 TPX

1 nos Delivery: 630 days
#316

LV1 VT-72B 1183-78-0065 BUSH 1183-78-0065

LV1 VT-72B 1183-78-0065 BUSH 1183-78-0065

1 nos Delivery: 630 days
#317

LV1 VT-72B 0019-28-306-1 LOWER CONE GEAR

LV1 VT-72B 0019-28-306-1 LOWER CONE GEAR

1 nos Delivery: 630 days
#318

LV1 VT-72B 1183-91-9116 SUSPENSION 2X5000KG

LV1 VT-72B 1183-91-9116 SUSPENSION 2X5000KG

1 nos Delivery: 630 days
#319

LV1 VT-72B 1183-91-9106 SUSPENSION ROPE

LV1 VT-72B 1183-91-9106 SUSPENSION ROPE

1 nos Delivery: 630 days
#320

LV1 VT-72B CSN-02-4705 BEARING 22218 M TPX

LV1 VT-72B CSN-02-4705 BEARING 22218 M TPX

1 nos Delivery: 630 days
#321

LV1 VT-72B 1183-78-0064 BUSH 1183-78-0064

LV1 VT-72B 1183-78-0064 BUSH 1183-78-0064

1 nos Delivery: 630 days
#322

LV1 VT-72B 1181-78-0046 NOZZLE 1181-78-0046

LV1 VT-72B 1181-78-0046 NOZZLE 1181-78-0046

1 nos Delivery: 630 days
#323

LV1 VT-72B 1181-78-0434 NECK M27X2

LV1 VT-72B 1181-78-0434 NECK M27X2

1 nos Delivery: 630 days
#324

LV1 VT-72B 1183-76-0009 PISTON 1183-76-0009

LV1 VT-72B 1183-76-0009 PISTON 1183-76-0009

1 nos Delivery: 630 days
#325

LV1 VT-72B 1183-78-0055 PIN 1183-78-0055

LV1 VT-72B 1183-78-0055 PIN 1183-78-0055

1 nos Delivery: 630 days
#326

LV1 VT-72B 1183-70-0039 TEMPERATURE BREAKER LUN3192-01-08

LV1 VT-72B 1183-70-0039 TEMPERATURE BREAKER LUN3192-01-08

1 nos Delivery: 630 days
#327

LV1 VT-72B CSN-02-9280-9 20X16 RING 20X16 ZMES NBR 1078

LV1 VT-72B CSN-02-9280-9 20X16 RING 20X16 ZMES NBR 1078

1 nos Delivery: 630 days
#328

LV1 VT-72B 1183-70-0101 PRESSURE GAUGE P 6 AK

LV1 VT-72B 1183-70-0101 PRESSURE GAUGE P 6 AK

1 nos Delivery: 630 days
#329

LV1 VT-72B 1183-70-9100 TIE ROD

LV1 VT-72B 1183-70-9100 TIE ROD

1 nos Delivery: 630 days
#330

LV1 VT-72B CSN-02-4630 BEARING 6210 AC3 TPX

LV1 VT-72B CSN-02-4630 BEARING 6210 AC3 TPX

1 nos Delivery: 630 days
#331

LV1 VT-72B 1181-70-9286 WELDING PANEL

LV1 VT-72B 1181-70-9286 WELDING PANEL

1 nos Delivery: 630 days
#332

LV1 VT-72B RC-25-01A HYDRAULIC PUMP RC-25-01A

LV1 VT-72B RC-25-01A HYDRAULIC PUMP RC-25-01A

1 nos Delivery: 630 days
#333

LV1 VT-72B 1183-76-0004 BRAKE BODY 1183-76-0004

LV1 VT-72B 1183-76-0004 BRAKE BODY 1183-76-0004

1 nos Delivery: 630 days
#334

LV1 VT-72B PND-13-09369 FILTER ELEMENT H 20 PND-13-09369

LV1 VT-72B PND-13-09369 FILTER ELEMENT H 20 PND-13-09369

1 nos Delivery: 630 days
#335

LV1 VT-72B CSN-02-4705 BEARING 22222W 33 JVS

LV1 VT-72B CSN-02-4705 BEARING 22222W 33 JVS

1 nos Delivery: 630 days
#336

LV1 VT-72B 1181-67-0121 BUSH 1181-67-0121

LV1 VT-72B 1181-67-0121 BUSH 1181-67-0121

1 nos Delivery: 630 days
#337

LV1 VT-72B CSN-02-4630 6016 BEARING UR 6016 AVS

LV1 VT-72B CSN-02-4630 6016 BEARING UR 6016 AVS

1 nos Delivery: 630 days
#338

LV1 VT-72B 1181-70-9101 CHASIS DRIVERS INSTRUMENT PANEL

LV1 VT-72B 1181-70-9101 CHASIS DRIVERS INSTRUMENT PANEL

1 nos Delivery: 630 days
#339

LV1 VT-72B 1181-78-9362 HYDRAULIC MOTOR AM 56 02 AVAM

LV1 VT-72B 1181-78-9362 HYDRAULIC MOTOR AM 56 02 AVAM

1 nos Delivery: 630 days
#340

LV1 VT-72B 1203-70-9271 CABLE BUNCH C-46 1203-70-9271

LV1 VT-72B 1203-70-9271 CABLE BUNCH C-46 1203-70-9271

1 nos Delivery: 630 days
#341

LV1 VT-72B 1183-91-9145 STIRRUP WITH LOCK 1183-91-9145

LV1 VT-72B 1183-91-9145 STIRRUP WITH LOCK 1183-91-9145

1 nos Delivery: 630 days
#342

LV1 VT-72B CSN-02-7486 OIL LEVEL INDICATOR M36X1 5

LV1 VT-72B CSN-02-7486 OIL LEVEL INDICATOR M36X1 5

1 nos Delivery: 630 days
#343

LV1 VT-72B 1183-91-9117 SUSPENSION 2X5200KG 1183-91-9117

LV1 VT-72B 1183-91-9117 SUSPENSION 2X5200KG 1183-91-9117

1 nos Delivery: 630 days
#344

LV1 VT-72B 1181-78-0477 PIN

LV1 VT-72B 1181-78-0477 PIN

1 nos Delivery: 630 days
#345

LV1 VT-72B 902-9999-433 BEARING 9E 1Z30-0823-80 VS

LV1 VT-72B 902-9999-433 BEARING 9E 1Z30-0823-80 VS

1 nos Delivery: 630 days
#346

LV1 VT-72B 1181-68-0073 FINGER 1181-68-0073

LV1 VT-72B 1181-68-0073 FINGER 1181-68-0073

1 nos Delivery: 630 days
#347

LV1 VT-72B 1181-68-0032 INSERT

LV1 VT-72B 1181-68-0032 INSERT

1 nos Delivery: 630 days
#348

LV1 VT-72B 1183-78-9118 PIPE 1183-78-9118

LV1 VT-72B 1183-78-9118 PIPE 1183-78-9118

1 nos Delivery: 630 days
#349

LV1 VT-72B 1181-69-9198 LEFT ARM

LV1 VT-72B 1181-69-9198 LEFT ARM

1 nos Delivery: 630 days
#350

LV1 VT-72B 1181-78-9360 AXIAL PISTON HYDROMOTOR AM 12-03 ADAM

LV1 VT-72B 1181-78-9360 AXIAL PISTON HYDROMOTOR AM 12-03 ADAM

1 nos Delivery: 630 days
#351

LV1 VT-72B 1181-78-9407 PIPE 1181-78-9407

LV1 VT-72B 1181-78-9407 PIPE 1181-78-9407

1 nos Delivery: 630 days
#352

LV1 VT-72B CSN-02-4670 210 BEARING NU210 BMA TPX

LV1 VT-72B CSN-02-4670 210 BEARING NU210 BMA TPX

1 nos Delivery: 630 days
#353

LV1 VT-72B 1181-67-9001 DRIVE OF ROTARY DEVICE

LV1 VT-72B 1181-67-9001 DRIVE OF ROTARY DEVICE

1 nos Delivery: 630 days
#354

LV1 VT-72B 1181-64-9110 TIE ROD 1181-64-9110

LV1 VT-72B 1181-64-9110 TIE ROD 1181-64-9110

1 nos Delivery: 630 days
#355

LV1 VT-72B 1181-64-9117 TIE ROD 1181-64-9117

LV1 VT-72B 1181-64-9117 TIE ROD 1181-64-9117

1 nos Delivery: 630 days
#356

LV1 VT-72B 1183-78-9140 PIPE 1183-78-9140

LV1 VT-72B 1183-78-9140 PIPE 1183-78-9140

1 nos Delivery: 630 days
#357

LV1 VT-72B HVC-63-1-0001 LINEAR HYDRAULIC MOTOR BODY

LV1 VT-72B HVC-63-1-0001 LINEAR HYDRAULIC MOTOR BODY

1 nos Delivery: 630 days
#358

LV1 VT-72B HVC-63-3-0007 PISTON

LV1 VT-72B HVC-63-3-0007 PISTON

1 nos Delivery: 630 days
#359

LV1 VT-72B 1181-64-9120 TIE ROD 1181-64-9120

LV1 VT-72B 1181-64-9120 TIE ROD 1181-64-9120

1 nos Delivery: 630 days
#360

LV1 VT-72B 1181-68-0028 SATELLITE 1181-68-0028

LV1 VT-72B 1181-68-0028 SATELLITE 1181-68-0028

1 nos Delivery: 630 days
#361

LV1 VT-72B 1181-66-9011 PIPE 1181-66-9011

LV1 VT-72B 1181-66-9011 PIPE 1181-66-9011

1 nos Delivery: 630 days
#362

LV1 VT-72B 1181-67-0103 SHAFT WITH PINION

LV1 VT-72B 1181-67-0103 SHAFT WITH PINION

1 nos Delivery: 630 days
#363

LV1 VT-72B 1183-78-9091 PIPE 1183-78-9091

LV1 VT-72B 1183-78-9091 PIPE 1183-78-9091

1 nos Delivery: 630 days
#364

LV1 VT-72B 1183-78-9094 PIPE 1183-78-9094

LV1 VT-72B 1183-78-9094 PIPE 1183-78-9094

1 nos Delivery: 630 days
#365

LV1 VT-72B 1183-78-9087 PIPE 1183-78-9087

LV1 VT-72B 1183-78-9087 PIPE 1183-78-9087

1 nos Delivery: 630 days
#366

LV1 VT-72B 1183-78-9089 PIPE 1183-78-9089

LV1 VT-72B 1183-78-9089 PIPE 1183-78-9089

1 nos Delivery: 630 days
#367

LV1 VT-72B 1183-78-9095 PIPE 1183-78-9095

LV1 VT-72B 1183-78-9095 PIPE 1183-78-9095

1 nos Delivery: 630 days
#368

LV1 VT-72B HVC-10-3-0006 PISTON

LV1 VT-72B HVC-10-3-0006 PISTON

1 nos Delivery: 630 days
#369

LV1 VT-72B 1183-78-9096 PIPE 1183-78-9096

LV1 VT-72B 1183-78-9096 PIPE 1183-78-9096

1 nos Delivery: 630 days
#370

LV1 VT-72B 1183-78-9101 PIPE 1183-78-9101

LV1 VT-72B 1183-78-9101 PIPE 1183-78-9101

1 nos Delivery: 630 days
#371

LV1 VT-72B 961-009 SATELLITE PAD 961-009

LV1 VT-72B 961-009 SATELLITE PAD 961-009

1 nos Delivery: 630 days
#372

LV1 VT-72B 961-008 PLANET WHEEL PIN

LV1 VT-72B 961-008 PLANET WHEEL PIN

1 nos Delivery: 630 days
#373

LV1 VT-72B 1183-78-9102 PIPE 1183-78-9102

LV1 VT-72B 1183-78-9102 PIPE 1183-78-9102

1 nos Delivery: 630 days
#374

LV1 VT-72B 1183-78-9106 PIPE 1183-78-9106

LV1 VT-72B 1183-78-9106 PIPE 1183-78-9106

1 nos Delivery: 630 days
#375

LV1 VT-72B 1181-63-9137 TIE ROD 1181-63-9137

LV1 VT-72B 1181-63-9137 TIE ROD 1181-63-9137

1 nos Delivery: 630 days
#376

LV1 VT-72B 1181-63-9136 TIE ROD 1181-63-9136

LV1 VT-72B 1181-63-9136 TIE ROD 1181-63-9136

1 nos Delivery: 630 days
#377

LV1 VT-72B 1181-63-9114 TIE ROD 1181-63-9114

LV1 VT-72B 1181-63-9114 TIE ROD 1181-63-9114

1 nos Delivery: 630 days
#378

LV1 VT-72B DHP-100-946 GEAR HYDRAULIC PUMP

LV1 VT-72B DHP-100-946 GEAR HYDRAULIC PUMP

1 nos Delivery: 630 days
#379

LV1 VT-72B DHP-100-950 GEAR HYDRAULIC PUMP

LV1 VT-72B DHP-100-950 GEAR HYDRAULIC PUMP

1 nos Delivery: 630 days
#380

LV1 VT-72B 1181-63-9113 TIE ROD 1181-63-9113

LV1 VT-72B 1181-63-9113 TIE ROD 1181-63-9113

1 nos Delivery: 630 days
#381

LV1 VT-72B DMV 06C OIS SAFETY VALVE NW 06-2 02 01

LV1 VT-72B DMV 06C OIS SAFETY VALVE NW 06-2 02 01

1 nos Delivery: 630 days
#382

LV1 VT-72B 1181-63-9112 TIE ROD 1181-63-9112

LV1 VT-72B 1181-63-9112 TIE ROD 1181-63-9112

1 nos Delivery: 630 days
#383

LV1 VT-72B 1181-63-9111 RIGHT TIE ROD 1181-63-9111

LV1 VT-72B 1181-63-9111 RIGHT TIE ROD 1181-63-9111

1 nos Delivery: 630 days
#384

LV1 VT-72B 1181-78-9318 PIPE 1181-78-9318

LV1 VT-72B 1181-78-9318 PIPE 1181-78-9318

1 nos Delivery: 630 days
#385

LV1 VT-72B 960-23-SB-2 RIGHT RING

LV1 VT-72B 960-23-SB-2 RIGHT RING

1 nos Delivery: 630 days
#386

LV1 VT-72B 1181-66-9021 CONNECTING BODY 1181-66-9021

LV1 VT-72B 1181-66-9021 CONNECTING BODY 1181-66-9021

1 nos Delivery: 630 days
#387

LV1 VT-72B 1181-78-9357 REGULATING HYDRAULIC MOTOR MR-089

LV1 VT-72B 1181-78-9357 REGULATING HYDRAULIC MOTOR MR-089

1 nos Delivery: 630 days
#388

LV1 VT-72B 1181-78-9359 HYDRAULIC PUMP AC 12 03 PVAMA

LV1 VT-72B 1181-78-9359 HYDRAULIC PUMP AC 12 03 PVAMA

1 nos Delivery: 630 days
#389

LV1 VT-72B 1183-69-9130 ROTARY DEVICE WELDMENT

LV1 VT-72B 1183-69-9130 ROTARY DEVICE WELDMENT

1 nos Delivery: 630 days
#390

LV1 VT-72B 1181-78-9320 PIPE 1181-78-9320

LV1 VT-72B 1181-78-9320 PIPE 1181-78-9320

1 nos Delivery: 630 days
#391

LV1 VT-72B 1181-78-9346 PRESSURE GUAGE 60 MPA 1181-78-9346

LV1 VT-72B 1181-78-9346 PRESSURE GUAGE 60 MPA 1181-78-9346

1 nos Delivery: 630 days
#392

LV1 VT-72B 1183-78-9141 PIPE 1183-78-9141

LV1 VT-72B 1183-78-9141 PIPE 1183-78-9141

1 nos Delivery: 630 days
#393

LV1 VT-72B 1181-63-9109 TIE ROD 1181-63-9109

LV1 VT-72B 1181-63-9109 TIE ROD 1181-63-9109

1 nos Delivery: 630 days
#394

LV1 VT-72B 1181-63-9108 TIE ROD 1181-63-9108

LV1 VT-72B 1181-63-9108 TIE ROD 1181-63-9108

1 nos Delivery: 630 days
#395

LV1 VT-72B 1181-63-9104 TIE ROD 1181-63-9104

LV1 VT-72B 1181-63-9104 TIE ROD 1181-63-9104

1 nos Delivery: 630 days
#396

LV1 VT-72B 1183-78-9130 PIPE 1183-78-9130

LV1 VT-72B 1183-78-9130 PIPE 1183-78-9130

1 nos Delivery: 630 days
#397

LV1 VT-72B 1181-63-9103 TIE ROD 1181-63-9103

LV1 VT-72B 1181-63-9103 TIE ROD 1181-63-9103

1 nos Delivery: 630 days
#398

LV1 VT-72B TB-12-1-0003 PIPE

LV1 VT-72B TB-12-1-0003 PIPE

1 nos Delivery: 630 days
#399

LV1 VT-72B 1181-63-9107 TIE ROD 1181-63-9107

LV1 VT-72B 1181-63-9107 TIE ROD 1181-63-9107

1 nos Delivery: 630 days
#400

LV1 VT-72B 1183-69-9140 COVER

LV1 VT-72B 1183-69-9140 COVER

1 nos Delivery: 630 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (relevant to bulk procurements)

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documentation (if required in ATC)

6

Technical bid documents

7

OEM authorization (if applicable)

8

Any additional documents specified in ATC/EOI

Corrigendum Updates

1 Update
#1

Update

12-Jan-2026

Extended Deadline

15-Jan-2026, 6:00 pm

Opening Date

15-Jan-2026, 6:30 pm

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to participate in Indian Army EOI procurement in Pune 2025 with 200 items

Bidders must submit the EOI documents to [email protected] within 10 days of publication. Ensure GST, PAN, financials, and experience certificates are ready. Although no item-level specs are provided, review the ATC document for any additional terms and be prepared for subsequent detailed tender rounds.

What documents are required for the Pune Army EOI 200-item bidding

Prepare GST registration, PAN, company financial statements, minimum 3 years of experience in bulk procurements, and OEM authorizations if applicable. Include EMD documentation if requested in ATC, plus technical compliance certificates and prior project experience as one package for submission.

What are the submission deadlines for the Pune Army EOI 2025

Submission deadline is within 10 days of publication. Email the EOI package to [email protected] with all required documents, including any ATC-referenced terms. Delays or missing documents may disqualify from this pre-qualification stage.

What are the technical specifications for the Pune Army EOI 200 items

No item-level specifications are provided in the current data. The tender mentions a separate ATC document; bidders should review the uploaded ATC to identify any technical or compliance requirements that may apply to later tender stages.

How is the estimated value handled in this Army EOI for 200 items

Estimated value is listed as 200.0 (currency unspecified). Bidders should prepare pricing assumptions for subsequent tenders and focus on demonstrating capability to supply at scale, with readiness for detailed cost proposals in the follow-up tender.

What is the submission address for the Pune Army EOI

EOI documents must be emailed to [email protected] within 10 days of publication. Ensure subject lines and file formats align with ATC instructions to avoid rejection and facilitate prompt evaluation by the Indian Army procurement team.