TenderDekho Logo
Closed GEM

Procurement Opportunity: Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connecti in WEST DELHI, DELHI

Bid Publish Date

11-Apr-2025, 4:39 pm

Bid End Date

02-May-2025, 5:00 pm

EMD

₹99,000

Progress

RA
Issue11-Apr-2025, 4:39 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

3546

Bid Type

Two Packet Bid

Categories 43

Indian Navy announces a tender for Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connecti in WEST DELHI, DELHI. Quantity: 3546. Submission Deadline: 02-05-2025 17: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN NAVY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7678790.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 124 Items Sign in for GEM prices

#1

Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connections

Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connections

1 pieces Delivery: 120 days
#2

10K Pot Top Tune 1 by 4 Watt

10K Pot Top Tune 1 by 4 Watt

8 pieces Delivery: 120 days
#3

10k Resistor 1 by 4 watt tolerance 1percent

10k Resistor 1 by 4 watt tolerance 1percent

150 pieces Delivery: 120 days
#4

270E Resistor 1 by 4 watt tolerance 1percent

270E Resistor 1 by 4 watt tolerance 1percent

84 pieces Delivery: 120 days
#5

5k Resistor 1 by 4 watt tolerance 1percent

5k Resistor 1 by 4 watt tolerance 1percent

76 pieces Delivery: 120 days
#6

14 point 9K Resistor 1 by 4 watt tolerance 1percent

14 point 9K Resistor 1 by 4 watt tolerance 1percent

20 pieces Delivery: 120 days
#7

0 point 05E Resistor 5watt tolerance 1percent

0 point 05E Resistor 5watt tolerance 1percent

20 pieces Delivery: 120 days
#8

1 point 5K RESISTOR

1 point 5K RESISTOR

30 pieces Delivery: 120 days
#9

14k Resistor 1 by 4 watt tolerance 1percent

14k Resistor 1 by 4 watt tolerance 1percent

20 pieces Delivery: 120 days
#10

150E Resistor 1 by 4 watt tolerance 1percent

150E Resistor 1 by 4 watt tolerance 1percent

20 pieces Delivery: 120 days
#11

1E Resistor 1 by 4 watt tolerance1percent

1E Resistor 1 by 4 watt tolerance1percent

45 pieces Delivery: 120 days
#12

26k Resistor 1 by 4 watt tolerance 1percent

26k Resistor 1 by 4 watt tolerance 1percent

20 pieces Delivery: 120 days
#13

470E RESISTOR

470E RESISTOR

20 pieces Delivery: 120 days
#14

500E RESISTOR

500E RESISTOR

50 pieces Delivery: 120 days
#15

680E Resistor 1 by 4 watt tolerance 1percent

680E Resistor 1 by 4 watt tolerance 1percent

20 pieces Delivery: 120 days
#16

11point 0592MHz Xtal Oscillator

11point 0592MHz Xtal Oscillator

5 pieces Delivery: 120 days
#17

RELAY S4EB 5V General Purpose Relay S Series Power Non Latching 4PST NO 5VDC 4A

RELAY S4EB 5V General Purpose Relay S Series Power Non Latching 4PST NO 5VDC 4A

70 pieces Delivery: 120 days
#18

1 N by O DIP 5D MAKE PLA RELAY

1 N by O DIP 5D MAKE PLA RELAY

30 pieces Delivery: 120 days
#19

Relay base for NC4D P DC5V Part No NC4 PS Digi Key Part No 255 1751 ND

Relay base for NC4D P DC5V Part No NC4 PS Digi Key Part No 255 1751 ND

12 pieces Delivery: 120 days
#20

Relay base for S4EB 5V Part No. S PS Digi key Part No 255 1751 ND

Relay base for S4EB 5V Part No. S PS Digi key Part No 255 1751 ND

50 pieces Delivery: 120 days
#21

RELAY S4EB 5V GENERAL PURPOSE RELAY 4PST NO 5VDC 4A

RELAY S4EB 5V GENERAL PURPOSE RELAY 4PST NO 5VDC 4A

50 pieces Delivery: 120 days
#22

RELAY DPDT Part No NC4D P DC5V

RELAY DPDT Part No NC4D P DC5V

12 pieces Delivery: 120 days
#23

Diode IN4001 signal Diode

Diode IN4001 signal Diode

52 pieces Delivery: 120 days
#24

15V Zener Diode

15V Zener Diode

60 pieces Delivery: 120 days
#25

Capacitor 30pF Ceramic

Capacitor 30pF Ceramic

15 pieces Delivery: 120 days
#26

104 pF Capacitor

104 pF Capacitor

50 pieces Delivery: 120 days
#27

Capacitor 1uF Tantalum

Capacitor 1uF Tantalum

10 pieces Delivery: 120 days
#28

Capacitor 10uF Tantalum

Capacitor 10uF Tantalum

5 pieces Delivery: 120 days
#29

1 uF 63 V Capacitor Electrolytic

1 uF 63 V Capacitor Electrolytic

14 pieces Delivery: 120 days
#30

100uf 63V ELECROLYTIC CAPACITOR

100uf 63V ELECROLYTIC CAPACITOR

32 pieces Delivery: 120 days
#31

33pF Capacitor Ceramic

33pF Capacitor Ceramic

70 pieces Delivery: 120 days
#32

30pF Capacitor Ceramic

30pF Capacitor Ceramic

50 pieces Delivery: 120 days
#33

10uF by 63 V Capacitor Electrolytic

10uF by 63 V Capacitor Electrolytic

90 pieces Delivery: 120 days
#34

LM 317 IC

LM 317 IC

5 pieces Delivery: 120 days
#35

IC 74LVC244

IC 74LVC244

8 pieces Delivery: 120 days
#36

74LS244 IC

74LS244 IC

30 pieces Delivery: 120 days
#37

DS89C450 MicroController

DS89C450 MicroController

30 pieces Delivery: 120 days
#38

74LS240 IC

74LS240 IC

25 pieces Delivery: 120 days
#39

HCPL2630 IC

HCPL2630 IC

36 pieces Delivery: 120 days
#40

HCPL3700 IC

HCPL3700 IC

12 pieces Delivery: 120 days
#41

SN74HC157N IC mux

SN74HC157N IC mux

12 pieces Delivery: 120 days
#42

ULN2003 IC

ULN2003 IC

18 pieces Delivery: 120 days
#43

Power Connector 3 Pin

Power Connector 3 Pin

1 pieces Delivery: 120 days
#44

BJ 770 Trompter Connector

BJ 770 Trompter Connector

14 pieces Delivery: 120 days
#45

PL 75 9 Connector

PL 75 9 Connector

4 pieces Delivery: 120 days
#46

Shock Mounts As per our specifications

Shock Mounts As per our specifications

4 pieces Delivery: 120 days
#47

12 Pin PCB Mount Ribbon Connector Pair

12 Pin PCB Mount Ribbon Connector Pair

8 pieces Delivery: 120 days
#48

12 Wired Ribbon Cable Grey Colour

12 Wired Ribbon Cable Grey Colour

1 pieces Delivery: 120 days
#49

3 PIN CABLE MOUNT FEMALE CONNECTOR MS3106F 10SL 3P 1520

3 PIN CABLE MOUNT FEMALE CONNECTOR MS3106F 10SL 3P 1520

50 pieces Delivery: 120 days
#50

3 PIN CABLE MOUNT MALE CONNECTOR MS3102R 10SL 3P 1846

3 PIN CABLE MOUNT MALE CONNECTOR MS3102R 10SL 3P 1846

50 pieces Delivery: 120 days
#51

3 PIN CHASIS MOUNT MALE CONNECTOR MS3102R 14S 7P 1846

3 PIN CHASIS MOUNT MALE CONNECTOR MS3102R 14S 7P 1846

50 pieces Delivery: 120 days
#52

3 PIN CHASIS MOUNT MALE POWER CONNECTOR MS3102 14S 7P

3 PIN CHASIS MOUNT MALE POWER CONNECTOR MS3102 14S 7P

50 pieces Delivery: 120 days
#53

3 PIN FEMALE CHASIS MOUNT MS CONNECTOR MS3102R 10SL 3S

3 PIN FEMALE CHASIS MOUNT MS CONNECTOR MS3102R 10SL 3S

50 pieces Delivery: 120 days
#54

3 PIN CABLE MOUNT FEMALE POWER CONNECTOR MS3106 14S 7S

3 PIN CABLE MOUNT FEMALE POWER CONNECTOR MS3106 14S 7S

50 pieces Delivery: 120 days
#55

3 PIN MALE CABLE MOUNT MALE CONNECTOR MS3106F 10SL 3P

3 PIN MALE CABLE MOUNT MALE CONNECTOR MS3106F 10SL 3P

50 pieces Delivery: 120 days
#56

6 pin Wago connector female with Cage Clamp with Locking device Part No 231 306 037 000

6 pin Wago connector female with Cage Clamp with Locking device Part No 231 306 037 000

50 pieces Delivery: 120 days
#57

6 pin Wago connector right angle solder Pin Male Part No 231 566 001 000

6 pin Wago connector right angle solder Pin Male Part No 231 566 001 000

50 pieces Delivery: 120 days
#58

64 pin Female euro connector straight

64 pin Female euro connector straight

35 pieces Delivery: 120 days
#59

64 pin Male euro connector right angle

64 pin Male euro connector right angle

35 pieces Delivery: 120 days
#60

5 Pin cable Mount male Connector MS3106F 14S 5P 1846

5 Pin cable Mount male Connector MS3106F 14S 5P 1846

50 pieces Delivery: 120 days
#61

5 Pin cable Mount Female Connector MS3106F 14S 5S 1723

5 Pin cable Mount Female Connector MS3106F 14S 5S 1723

50 pieces Delivery: 120 days
#62

19 PIN MS CONNECTOR CHASIS MOUNT MS 3102R 22 14S

19 PIN MS CONNECTOR CHASIS MOUNT MS 3102R 22 14S

10 pieces Delivery: 120 days
#63

19 PIN MS CONNECTOR MALE CABLE MOUNT MS 3106F 22 14P

19 PIN MS CONNECTOR MALE CABLE MOUNT MS 3106F 22 14P

10 pieces Delivery: 120 days
#64

37 PIN CABEL MOUNT MALE CONNECTOR

37 PIN CABEL MOUNT MALE CONNECTOR

4 pieces Delivery: 120 days
#65

40 pin RIBBON FRC CONNECTOR

40 pin RIBBON FRC CONNECTOR

10 pieces Delivery: 120 days
#66

5 pin chasis mount male connector MS3102R 14S 5P 1618

5 pin chasis mount male connector MS3102R 14S 5P 1618

50 pieces Delivery: 120 days
#67

5 PIN CIRCULAR FEMALE CONNECTOR MS 3102 10SL 3P

5 PIN CIRCULAR FEMALE CONNECTOR MS 3102 10SL 3P

50 pieces Delivery: 120 days
#68

5 PIN CIRCULAR FEMALE CONNECTOR MS 3102 14S 5P

5 PIN CIRCULAR FEMALE CONNECTOR MS 3102 14S 5P

50 pieces Delivery: 120 days
#69

5 PIN CIRCULAR FEMALE CONNECTOR MS 3106F 14S 5P

5 PIN CIRCULAR FEMALE CONNECTOR MS 3106F 14S 5P

50 pieces Delivery: 120 days
#70

5 PIN CIRCULAR MALE CONNECTOR MS 3106 10SL 3S

5 PIN CIRCULAR MALE CONNECTOR MS 3106 10SL 3S

50 pieces Delivery: 120 days
#71

5 PIN CIRCULAR MALE CONNECTOR MS 3106 14S 5S

5 PIN CIRCULAR MALE CONNECTOR MS 3106 14S 5S

50 pieces Delivery: 120 days
#72

5 PIN CIRCULAR MALE CONNECTOR MS 3106R 14S 5S

5 PIN CIRCULAR MALE CONNECTOR MS 3106R 14S 5S

50 pieces Delivery: 120 days
#73

6 PIN FEMALE CONNECTOR WITH CAGE

6 PIN FEMALE CONNECTOR WITH CAGE

25 pieces Delivery: 120 days
#74

6 PIN MALE CONNECTOR WITH CAGE

6 PIN MALE CONNECTOR WITH CAGE

25 pieces Delivery: 120 days
#75

6 PIN FEMALE CHASIS MOUNT MS CONNECTOR MS3102F 14S 6S

6 PIN FEMALE CHASIS MOUNT MS CONNECTOR MS3102F 14S 6S

25 pieces Delivery: 120 days
#76

6 PIN MALE CABLE MOUNT MS CONNECTOR MS3106F 14S 6P

6 PIN MALE CABLE MOUNT MS CONNECTOR MS3106F 14S 6P

25 pieces Delivery: 120 days
#77

ITP 2 PIN FEMALE Connector With wire

ITP 2 PIN FEMALE Connector With wire

40 pieces Delivery: 120 days
#78

ITP 2 PIN MALE Connector

ITP 2 PIN MALE Connector

40 pieces Delivery: 120 days
#79

ITP 4 PIN FEMALE Connector

ITP 4 PIN FEMALE Connector

40 pieces Delivery: 120 days
#80

ITP 4 PIN MALE Connector

ITP 4 PIN MALE Connector

40 pieces Delivery: 120 days
#81

ITP CONNECTOR FEMALE

ITP CONNECTOR FEMALE

30 pieces Delivery: 120 days
#82

ITP CONNECTOR MALE

ITP CONNECTOR MALE

30 pieces Delivery: 120 days
#83

RJ 45 CONNECTOR

RJ 45 CONNECTOR

10 pieces Delivery: 120 days
#84

Spacer Hexagonal 3CM Length

Spacer Hexagonal 3CM Length

10 pieces Delivery: 120 days
#85

Hexgonal Metal Spacer 50mm

Hexgonal Metal Spacer 50mm

10 pieces Delivery: 120 days
#86

Spacer Hexagonal 1CM Length

Spacer Hexagonal 1CM Length

10 pieces Delivery: 120 days
#87

8 Pin IC Base Dip 8 Pin Round pin machine hole

8 Pin IC Base Dip 8 Pin Round pin machine hole

5 pieces Delivery: 120 days
#88

20 pin IC Base Dip 20 Pin Round pin machine hole

20 pin IC Base Dip 20 Pin Round pin machine hole

5 pieces Delivery: 120 days
#89

14 Pin IC Base Dip 14 Pin Round pin machine hole

14 Pin IC Base Dip 14 Pin Round pin machine hole

5 pieces Delivery: 120 days
#90

28 Pin IC Base Dip 28 Pin Round pin machine hole

28 Pin IC Base Dip 28 Pin Round pin machine hole

5 pieces Delivery: 120 days
#91

16 pin IC Base Dip 16 Pin Round pin machine hole

16 pin IC Base Dip 16 Pin Round pin machine hole

8 pieces Delivery: 120 days
#92

40 PIN IC BASE DIP ROUND PIN MACHINE HOLE

40 PIN IC BASE DIP ROUND PIN MACHINE HOLE

5 pieces Delivery: 120 days
#93

PCBs as per Gerber File

PCBs as per Gerber File

5 pieces Delivery: 120 days
#94

12V DC Fan

12V DC Fan

3 pieces Delivery: 120 days
#95

LED HOLDER 5MM

LED HOLDER 5MM

50 pieces Delivery: 120 days
#96

LED WHITE 5mm dia

LED WHITE 5mm dia

20 pieces Delivery: 120 days
#97

LED GREEN 5mm dia

LED GREEN 5mm dia

50 pieces Delivery: 120 days
#98

LED RED 5mm dia

LED RED 5mm dia

70 pieces Delivery: 120 days
#99

LED YELLOW 5mm dia

LED YELLOW 5mm dia

50 pieces Delivery: 120 days
#100

LED BLUE 5mm dia

LED BLUE 5mm dia

22 pieces Delivery: 120 days
#101

BA Card PCB Gerber file will be provided

BA Card PCB Gerber file will be provided

15 pieces Delivery: 120 days
#102

DIGITAL CARD PCB

DIGITAL CARD PCB

12 pieces Delivery: 120 days
#103

HEAT SINK FOR BA CARD DOUBLE CHANNEL

HEAT SINK FOR BA CARD DOUBLE CHANNEL

8 pieces Delivery: 120 days
#104

ON OFF SPDT TOGGLE SWITCH 6Amp

ON OFF SPDT TOGGLE SWITCH 6Amp

6 pieces Delivery: 120 days
#105

Solder

Solder

1 pieces Delivery: 120 days
#106

3 x 10 mm screws and nuts

3 x 10 mm screws and nuts

50 pieces Delivery: 120 days
#107

10 mm nuts

10 mm nuts

50 pieces Delivery: 120 days
#108

3MM SS WASHER

3MM SS WASHER

50 pieces Delivery: 120 days
#109

4MM SS WASHER

4MM SS WASHER

50 pieces Delivery: 120 days
#110

MEAN WELL POWER SUPPLY LRS 200 24

MEAN WELL POWER SUPPLY LRS 200 24

4 pieces Delivery: 120 days
#111

POWER SUPPLY LDA 10F 5 5V 2A

POWER SUPPLY LDA 10F 5 5V 2A

5 pieces Delivery: 120 days
#112

POWER SUPPLY LDC 60 F 2 plus5V plus15V 15V

POWER SUPPLY LDC 60 F 2 plus5V plus15V 15V

5 pieces Delivery: 120 days
#113

Power Cable 15 Amp 1 point 5 meter

Power Cable 15 Amp 1 point 5 meter

50 pieces Delivery: 120 days
#114

Belden cable Multi Conductor Low Capacitance Computer Cable Part No 96820601000

Belden cable Multi Conductor Low Capacitance Computer Cable Part No 96820601000

1 pieces Delivery: 120 days
#115

WIRE SLEEVE 4MM Roll 400 meter

WIRE SLEEVE 4MM Roll 400 meter

1 pieces Delivery: 120 days
#116

WIRE SLEEVE 2MM Roll 400 meter

WIRE SLEEVE 2MM Roll 400 meter

1 pieces Delivery: 120 days
#117

WIRE SLEEVE 0 point 5MM Roll 400 meter

WIRE SLEEVE 0 point 5MM Roll 400 meter

1 pieces Delivery: 120 days
#118

WIRE SLEEVE 1MM Roll 400 meter

WIRE SLEEVE 1MM Roll 400 meter

1 pieces Delivery: 120 days
#119

ITP 16 PIN FEMALE with Wire

ITP 16 PIN FEMALE with Wire

40 pieces Delivery: 120 days
#120

ITP 2 PIN FEMALE Connector With wire

ITP 2 PIN FEMALE Connector With wire

40 pieces Delivery: 120 days
#121

SGI PTFE Teflon wire Size 24 19 36 Type ET Colour BLACK 100 meter

SGI PTFE Teflon wire Size 24 19 36 Type ET Colour BLACK 100 meter

3 pieces Delivery: 120 days
#122

SGI PTFE Teflon wire Size 24 19 36 Type ET Colour BLUE 100 meter

SGI PTFE Teflon wire Size 24 19 36 Type ET Colour BLUE 100 meter

3 pieces Delivery: 120 days
#123

SGI PTFE Teflon wire Size 24 19 36 Type ET Colour RED 100 meter

SGI PTFE Teflon wire Size 24 19 36 Type ET Colour RED 100 meter

3 pieces Delivery: 120 days
#124

Transformer 30VA INPUT 0 15 V OUTPUT 0 45 75 make Shreejee

Transformer 30VA INPUT 0 15 V OUTPUT 0 45 75 make Shreejee

10 pieces Delivery: 120 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

20-May-2025, 1:00 pm

End

21-May-2025, 1:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
HITECH SURVEY TOOLS PRIVATE LIMITED   Under PMA
-01-05-2025 18:49:55
2
JIYANJANI TECHNOLOGIES PRIVATE LIMITED   Under PMA
-29-04-2025 14:35:42
3
SINAXIS ENTERPRISES PRIVATE LIMITED   Under PMA
-25-04-2025 12:34:24
4
VAISHNAVI ENTERPRISES   Under PMA
-30-04-2025 22:22:28

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1VAISHNAVI ENTERPRISES(MSE,MII)   Under PMA Winner ₹47,37,710Item Categories : Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connecti
L2JIYANJANI TECHNOLOGIES PRIVATE LIMITED (MSE,MII)   Under PMA₹48,15,692Item Categories : Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connecti
L3HITECH SURVEY TOOLS PRIVATE LIMITED (MSE,MII)   Under PMA₹53,84,750Item Categories : Distribution Box Material Aluminium with plastic Brass glands for cables 80 terminal strip connecti

🎉 L1 Winner

VAISHNAVI ENTERPRISES(MSE,MII)   Under PMA

Final Price: ₹47,37,710

Frequently Asked Questions

Key insights about DELHI tender market

What are the eligibility requirements for procurement tenders in the Defence sector?

The eligibility requirements for participating in procurement tenders in the Defence sector generally include having a valid business registration, compliance with government regulations, and demonstrating prior experience in similar product supply contracts. Suppliers should also present evidence of capabilities in adhering to specified quality standards that are crucial for military applications.

What technical specifications must the electronic components meet?

The technical specifications outlined in the tender require that all electronic components, such as resistors and relays, comply with strict military standards. This includes precise tolerances, voltage ratings, and operational reliability under various conditions. Suppliers must ensure that their products can withstand the demands typical of military environments.

Are there any specific certificates required for the submission of bids?

Yes, the submission of bids typically necessitates several certificates, including manufacturing quality certifications, business registration documents, and any relevant compliance certificates that showcase adherence to industry standards. It's essential to include these documents to facilitate the evaluation process.

What are the payment terms established in this tender?

The payment terms for this tender will be specified within the contract following successful bid evaluation. Common terms may include progressive payments based on delivery milestones or upon completion of the entire order. Bidders are encouraged to specify any conditions relating to payment during their submission.

How will the successful bidders be notified about the results?

Once the evaluation process is complete, the successful bidders will be notified through official means, which may include email communication or official announcements published by the Department of Military Affairs. It's crucial for all bidders to monitor their communication channels post-evaluation for any updates regarding the tender status.