1
The opportunity is a GeM Portal works contract tender for pole installation and related tasks, with online Earnest Money Deposit (EMD) and a defined 30-day work completion window. Bidders should anticipate a two-part security deposit: 5% as Performance Security and 5% as Retention Money, with 95% payment on running bills and the remaining 5% retained. Bid validity is 120 days from bid submission end date. The purchase process requires inspection of site conditions prior to quoting, and all documents must be uploaded online in a single PDF, including PAN, GST, and experience proofs. Safety compliance and qualified personnel (VTC/IME/PME trained) are mandatory at the site. The timeline for commencement is calculated from the 10th day after award or upon handover of required poles and conductors, or site handover, whichever is later, with the option to adjust contract quantity or duration up to 25% per the contract terms.
Scope includes installation of poles and conductors as specified in the work order
Work completion time: 30 days from commencement
Two-part security deposit: 5% Performance Security + 5% Retention
Payment terms: 95% on running bills, 5% retention
Online submission of PAN, GST, and experience in a single PDF
Only VTC trained / IME / PME manpower permitted on site
EMD to be submitted online as per NIT requirements
30-day work completion timeline from commencement or handover
Two-part security deposit totalling 10% (5% performance, 5% retention)
Running bills paid at 95%; balance 5% retained as part of security; final payment subject to contract terms
Commencement date calculated from the award date or handover of poles/conductors; project completion within 30 days
Not explicitly stated in provided data; follow standard contract provisions or NIT guidelines
Eligibility to submit online EMD as per NIT
Experience in similar pole/conductor installation projects
Ability to deploy VTC/IME/PME trained personnel and ensure safety compliance
Main Document
BOQ
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Navy
PORBANDAR, GUJARAT
Indian Navy
PORBANDAR, GUJARAT
Indian Navy
PORBANDAR, GUJARAT
Indian Army
PUNE, MAHARASHTRA
Central Railway
JALGAON, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar works
Financial statements or balance sheets
EMD submission proof (online)
Technical bid documents
OEM authorizations (if applicable)
Safety/compliance certificates
Proof of manpower qualifications (VTC/IME/PME)
Key insights about MAHARASHTRA tender market
Bidders must submit online EMD as per NIT, upload PAN, GST, and experience certificates in a single PDF, and ensure VTC/IME/PME trained manpower. The contract requires 30-day completion, 5% performance security, 5% retention, and 95% payment on running bills. Bid validity is 120 days.
Required documents include GST registration, PAN, previous experience certificates for similar works, financial statements, EMD proof online, technical bid documents, and OEM authorizations if applicable. All documents must be uploaded as a single PDF per NIT instructions.
Payments are released at 95% of running bills, with 5% retention held as security. Performance security is 5% of annualized contract value, to be submitted within 21 days of LOA. Final settlement follows contract terms and may include deductions as per L/D and penalties.
The work completion period is 30 days from the date of commencement, which is calculated from the award date or the day of handover of required poles and conductors, whichever is later. Ensure timely site readiness to meet the deadline.
Only VTC trained, IME, or PME personnel may be engaged on the site. Bidder must implement all safety measures and comply with government guidelines. Documented safety certifications and site safety plans should be available upon request.
The contract allows quantity or duration adjustments up to 25% at contract issue and post-LOA. Bidders should price with flexibility but prepare for potential scope changes within the 25% threshold and adjust project planning accordingly.
EMD must be furnished online as indicated in the NIT. Ensure the EMD amount is aligned with the bid requirements and that the online submission confirms payment. EMD may be adjusted against Performance Security upon successful bid submission per guidelines.
Intending bidders are advised to inspect the actual job condition at the site before quoting. This ensures accurate pricing and schedules, as BOQ items are not specified in the provided data; align your bid with on-site conditions and safety standards.
Bharat Sanchar Nigam Limited Portal(bsnl)
📍 DHARWARD, KARNATAKA
National Centre For Coastal Research (nccr)
📍 CHENNAI, TAMIL NADU
Western Railway
📍 RAJKOT, GUJARAT
Mstc Limited
📍 NORTH 24 PARGANAS, WEST BENGAL
Oil And Natural Gas Corporation Limited
📍 MAHESANA, GUJARAT
Sign up now to access all documents
Main Document
BOQ
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS