Bid Publish Date
10-Sep-2026, 11:13 am
Bid End Date
23-Sep-2026, 7:00 pm
Location
Progress
Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for Repair, Maintenance, and Installation of Plant/Systems/Equipments at a 220kV substation (MBd) in Uttar Pradesh. The scope includes replacement work of jack bus made up of single ACSR Zebra to twin ACSR Moose and related substation works. The tender notes a 25% variation in contract quantity or duration at issue and post-award, with consent required for scope changes in lumpsum service contracts. There are currently no BOQ items published, indicating potential scope details to be clarified during bid. This procurement targets electrical substation reliability and grid integrity in the UP region, with emphasis on equipping critical 220kV assets to improve transmission performance.
Product/service names: repair, maintenance, and installation of 220kV substation equipment
Quantity/scale: not yet published (BOQ items = 0 published); scope to be clarified
Estimated value: not available; bidders should await official tender data
Experience: not specified; bidders to demonstrate capability in HV substation works
Quality/standards: not specified in data; verify compliance in ATC and final contract
Delivery/installation: not specified; seek site access and scheduling details in ATC
25% variation in contract quantity or duration at issue and post-award
ATC document must be reviewed for condition specifics and compliance
No published BOQ items; expect scope clarification and itemization during bidding
Not specified in available data; verify in ATC and final contract; ensure alignment with UPPCL norms
Not specified; bidders should obtain site access timelines and installation windows from ATC
Not disclosed; confirm in contract documents and ATC to understand performance penalties
Demonstrated experience in high-voltage substation repair and maintenance
Ability to undertake jack bus replacement in 220kV environments
Compliance with UP electrical procurement norms and OEM authorizations if required
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 220kv substation mbd; Substation, replacement work of jack bus made up of single acsr zebra to twin ACSR moose; Buyer
Delivery Locations
1
Delivery Cities
Moradabad
Delivery Pincodes
244103
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rohit Kumar | 244103,ELECTRICITY TRANSMISSION SUB DIVISION II 220 KV SUB STATION CAMPUS MAJHOLA MORADABAD | Moradabad | Uttar Pradesh | 244103 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar high-voltage substation projects
Financial statements (audited) for recent years
EMD deposit documentation (amount to be specified in tender) or alternative security
Technical bid documents and compliance certificates
OEM authorization letter (if required) for jack bus/components
Any ATC-specific documents uploaded by the buyer
Key insights about UTTAR PRADESH tender market
Bidders should review the ATC document uploaded by the buyer, gather GST, PAN, and experience certificates for HV substation work, and prepare financials and technical compliance. The tender permits up to 25% variation in quantity or duration, with final contract terms in the ATC.
Required documents typically include GST registration, PAN, audited financial statements, experience certificates for HV substations, OEM authorizations if necessary, technical bid documents, and EMD/security documents as specified in the ATC.
The project scope involves replacing the jack bus from single ACSR Zebra to twin ACSR Moose at a 220kV substation as part of repair/maintenance and installation works for grid reliability, per the buyer’s terms.
The buyer may increase or decrease contract quantity or duration by up to 25% at contract issue and during execution, with consent required for scope changes in lumpsum service contracts.
Delivery timelines are not specified in the initial data; bidders must obtain site access schedules, installation windows, and completion timelines from the official ATC and contract documents.
Specific standards are not listed in the available data; bidders should verify IS/IEC compliance and OEM approvals as per ATC and final contract for HV substation work.
EMD details are not published here; bidders must refer to the ATC and tender documents for exact EMD amount, payment milestones, and security requirements.
The published BOQ shows zero items; expect subsequent Itemization in the ATC or during clarification meetings with UPPCL officials.