Foam Filled Tyre & Wheel Assembly suitable for JLG 800AJ
Power Grid Corporation Of India Limited
SEONI, MADHYA PRADESH
Bid Publish Date
02-Jan-2026, 7:37 pm
Bid End Date
06-Feb-2026, 3:00 pm
EMD
₹13,000
Location
Progress
Quantity
4
Bid Type
Two Packet Bid
Power Grid Corporation Of India Limited invites bids for the procurement of 04 Nos of Foam filled Tyres along with wheel assemblies suitable for a JLG manlift at the organizational location in SOLAPUR, MAHARASHTRA 413001. The estimated value is not disclosed; the tender requires an EMD of ₹13,000. The scope centers on replacement components for elevated access equipment, with a key delivery/quantity option clause allowing a ±25% variation. The tender emphasizes contract risk sharing via supplier consent on assignment and subcontracting, while maintaining joint liability for performance. Unique aspects include the absence of BOQ items and a focus on spare parts that fit JLG systems.
Product/service: Foam filled tyres with wheel assemblies for JLG manlift
Quantity: 04 Nos
Location: Solapur, Maharashtra 413001
EMD: ₹13,000
Standards/Certifications: Not specified in tender data
Delivery dynamics: 25% quantity variation permitted; delivery period adjusted accordingly
Sub-contracting/assignment: Requires buyer's prior written consent
EMD of ₹13,000 required with bid submission
Quantity may vary ±25% during contract
No BOQ items; scope relies on foam tyres and wheel assemblies for JLG
Delivery period alignment with original order date; extended time rules apply
Assignment/sub-contracting requires buyer consent; joint liability remains
Not specified in data; bidders should await ATC for actual payment schedule and milestones.
Delivery period starts from last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days.
Not specified in data; check ATC for LD/penalty terms if extended.
Eligibility for spare parts procurement of JLG manlift tyres
Compliance with assignment/sub-contracting restrictions
Demonstrated capability to supply foam-filled tyres and wheel assemblies
Main Document
BOQ
TECHNICAL
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Power Grid Corporation Of India Limited
SEONI, MADHYA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates (if any for spare parts procurement)
Financial statements (as applicable)
EMD document (₹13,000) and payment details
Technical bid documents (spare parts compatibility with JLG manlift)
OEM authorizations or supplier certifications (if required by ATC)
Cancelled cheque and EFT mandate
Extended Deadline
06-Feb-2026, 3:00 pm
Opening Date
06-Feb-2026, 3:30 pm
Extended Deadline
30-Jan-2026, 3:00 pm
Opening Date
30-Jan-2026, 3:30 pm
Key insights about MAHARASHTRA tender market
Bidders should prepare documents listed in Terms: PAN, GSTIN, canceled cheque, EFT mandate, and vendor code creation. Confirm OEM compatibility with JLG manlift and ensure the 04 unit requirement, plus a ₹13,000 EMD. Follow ATC for delivery terms and option clause execution when quantity variations occur.
Submit PAN card, GST certificate, canceled cheque, EFT Mandate, and any vendor code creation documents. Include potential experience certificates and financial statements if requested by ATC. OEM authorizations may be required to prove component authenticity and compatibility with JLG equipment.
No explicit technical specs provided; ensure tyres and wheel assemblies are foam-filled and compatible with JLG manlift dimensions. Verify fitment with JLG models used by Power Grid and confirm OEM alignment to avoid installation issues, while awaiting detailed ATC standards.
Delivery terms reference the original delivery order date and the option clause allows up to 25% quantity changes. If exercised, the additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; confirm final timeline in ATC.
EMD is ₹13,000 as per tender data. Submit the EMD along with bid in the format specified in ATC, ensuring payment method aligns with bank account details on EFT Mandate and PAN/GST validations.
Suppliers must demonstrate capability to supply foam-filled tyres and wheel assemblies for JLG manlifts, comply with assignment/sub-contracting rules, and provide necessary documentation (PAN, GST, EFT) to participate. Experience in similar spare parts procurement enhances eligibility.
The purchaser may increase/decrease quantity up to 25% at contracted rates during or after contract, with delivery time adjustments calculated per the specified formula, ensuring minimum 30 days extension and alignment with original delivery period.
The procurement is targeted at Solapur, Maharashtra (postal 413001) under Power Grid Corporation of India Limited, focusing on 04 units of foam filled tyres and wheel assemblies for JLG manlift applications.
Sign up now to access all documents
Main Document
BOQ
TECHNICAL
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS