COUPLING, SPINDLE, DWN: 004.06. 012.0001136,SPINDLE GEAR, DWN: 04.06. 012/1136B,SPINDLE, DWN: 004.0
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Bid Publish Date
02-Jun-2026, 11:51 am
Bid End Date
12-Jun-2026, 12:00 pm
Location
Progress
Quantity
3
Category
SPINDLE HEAD DWN RSM15 12A R1
Bid Type
Two Packet Bid
The procurement is issued by Bhilai Steel Plant, part of the Steel Authority of India Limited (SAIL), for SPINDLE HEAD DWN RSM15 12A R1 and HEAD DWN RSM 5 13A R2 components. Location is DURG, CHHATTISGARH – 490001. The BoQ shows no listed items or quantities, and there is no clearly stated estimated value or EMD amount in the published data. The tender context appears to target specialized spindle head down assemblies, likely for rolling mill or machine tooling applications within the steel plant. The absence of items in the BOQ and explicit values suggests a limited data publish or an early tender notice phase. Unique aspects include the combination of two distinct spindle head-down models and the presence of a buyer-added ATC document, indicating special terms may exist in the ATC file.
No explicit technical specifications are published. Available data references two spindle head-down models (RSM15 12A R1 and RSM 5 13A R2), implying machine-tooling or spindle head components. The absence of standard numbers, capacity ratings, or performance metrics requires bidders to rely on the ATC document, equipment cross-reference details, and any OEM authorizations. Critical expectations include compliance with internal Bhilai Steel Plant engineering standards and alignment with the ATC terms. Bidders should prepare for potential OEM-based qualifications and industry-standard quality checks once the ATC file is reviewed.
EMD amount not disclosed; verify in ATC for exact value and payment method
Delivery timeline and penalties to be clarified in ATC; confirm lead times
OEM authorizations and technical compliance documents required per ATC
Details to be provided in ATC; bidders should anticipate standard plant procurement terms at Bhilai Steel Plant
Delivery timelines and milestone payments will be defined in the ATC; bidders must monitor the uploaded document
LD clauses, if any, will be specified in ATC; ensure readiness for performance-based penalties
Bidders must review ATC for verification of OEM authorizations
Capability to supply spindle head down assemblies compatible with RSM models
Compliance with Bhilai Steel Plant procurement norms and required certificates
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SPINDLE HEAD DWN RSM15 12A R1 , HEAD DWN RSM 5 13A R2
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
TECHNICAL
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Rourkela Steel Plant
Bokaro Steel Plant
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar spindle head components
Financial statements (last 2-3 years)
EMD/Security deposit proof (as applicable)
Technical bid documents demonstrating compliance with ATC
OEM authorization letters (if bidding as an authorized distributor/agent)
Key insights about CHHATTISGARH tender market
Bidders should review the ATC document uploaded by the buyer for specific terms. Prepare GST, PAN, experience certificates, financial statements, and OEM authorizations. Ensure the bid demonstrates capability to supply RSM15 12A R1 and RSM 5 13A R2 spindle head components and aligns with site standards.
Submit GST certificate, PAN card, experience certificates for similar spindle heads, financial statements, EMD proof, and OEM authorization if bidding as an authorized supplier. Include technical bid details and any ATC-specified certifications after reviewing the uploaded ATC file.
The tender excerpt lists two models: RSM15 12A R1 and RSM 5 13A R2. Precise technical specs, capacities, and tolerances will be provided in the ATC. Bidders should await ATC guidance and prepare demonstration of OEM compliance and replacement parts readiness.
Delivery timeline details are not published in the basic notice and will be specified in the ATC. Bidders should monitor the ATC upload for milestone dates, installation prerequisites, and on-site delivery checks to align with Bhilai Steel Plant expectations.
EMD details are not disclosed in the excerpt. The bidder must check the ATC for the exact amount, mode of payment, and validity period. Ensure the EMD is ready in the specified format per Bhilai Steel Plant procurement guidelines.
Eligibility will rely on audited financials, tax registrations, and OEM authorizations. At minimum, provide GST, PAN, experience certificates for similar spindle head projects, and technical compliance documents. The ATC may specify additional site-specific eligibility tests.
Bharat Earth Movers Limited (beml)
Rashtriya Ispat Nigam Limited
📍 VISAKHAPATNAM, ANDHRA PRADESH
Bokaro Steel Plant
📍 BOKARO, JHARKHAND
Bokaro Steel Plant
📍 BOKARO, JHARKHAND
Indian Army
📍 PUNE, MAHARASHTRA
Sign up now to access all documents
Main Document
OTHER
TECHNICAL
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS