TenderDekho Logo
GEM

Contract Bidding Open For LED street light,LED street light,LED street light,Timer Panel,power contactor,Digital time switch, in NARMADA, GUJARAT

Bid Publish Date

24-Feb-2026, 11:06 am

Bid End Date

16-Mar-2026, 6:00 pm

EMD

₹19,000

Value

₹18,33,201

Progress

Issue24-Feb-2026, 11:06 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

878

Category

LED street light

Bid Type

Two Packet Bid

Categories 50

Sardar Sraovar Narmada Nigam Limited invites bids for LED street light, Timer Panel, power contactor, Digital time switch, Modular MCB Switch, Mount Downlight, LED Panel Light, Ceiling fan, Tube Light with integral driver, LED Lamps integral type, RCCBs, exhaust fan, Foot Light, soft copper tubing, MS angle, telephone, Metal Halide lamps, HPSV MH Lamp, Switch board, remote control ac and CELL, remote control panel assembly, Shifting of Split A. C. , end termination kit, Straight through joint kit, in NARMADA, GUJARAT. Quantity: 878. Submission Deadline: 16-03-2026 18: 00: 00. Submit your proposal before the deadline.

Documents 7

GeM-Bidding-9025756.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Wiring for light point,Wiring for circuit,Circuit Wiring,Circuit,Wiring,Supplying and fixing PVC co

Bharat Sanchar Nigam Limited Portal(bsnl)

KATIHAR, BIHAR

Posted: 25 April 2025
Closed: 6 May 2025
GEM

Search light assy,Combination switch,Kilometer head digital 24V,Reverse Light Switch,Warning light

Indian Army

KOTA, RAJASTHAN

Posted: 25 July 2025
Closed: 4 August 2025
GEM

Stop light,Fuse box,Fuel pipe No III,Flexible pipe,AC Control switch,Spacer - No 12,Isolator switch

Indian Army

Posted: 19 November 2024
Closed: 10 December 2024
GEM

Modular GI Box with modular base and cover plate,Modular GI Box with modular base and cover plate,M

Directorate General Of Lighthouses And Lightships

RATNAGIRI, MAHARASHTRA

Posted: 21 May 2025
Closed: 11 June 2025
GEM

Focus light,Ceiling Light 15 W,Ceiling Light 9W,Tube Light,LED Bulb,Clamp Meter,Screw Driver Set,Sp

Indian Army

Posted: 4 August 2025
Closed: 21 August 2025
GEM

Bill of Quantities (BOQ) 34 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 LED street light LED street light 25 pieces con-ssnnl 15
2 LED street light LED street light 50 pieces con-ssnnl 15
3 LED street light LED street light 20 pieces con-ssnnl 15
4 Timer Panel Timer Panel 4 pieces con-ssnnl 15
5 power contactor power contactor 20 pieces con-ssnnl 15
6 Digital time switch Digital time switch 20 pieces con-ssnnl 15
7 Modular MCB Switch Modular MCB Switch 10 pieces con-ssnnl 15
8 Mount Downlight Mount Downlight 125 pieces con-ssnnl 15
9 Mount Downlight Mount Downlight 175 pieces con-ssnnl 15
10 LED Panel Light LED Panel Light 10 pieces con-ssnnl 15
11 Ceiling fan Ceiling fan 30 pieces con-ssnnl 15
12 Tube Light with integral driver Tube Light with integral driver 25 pieces con-ssnnl 15
13 Tube Light with integral driver Tube Light with integral driver 50 pieces con-ssnnl 15
14 LED Lamps integral type LED Lamps integral type 100 pieces con-ssnnl 15
15 RCCBs RCCBs 10 pieces con-ssnnl 15
16 RCCBs RCCBs 10 pieces con-ssnnl 15
17 RCCBs RCCBs 8 pieces con-ssnnl 15
18 exhaust fan exhaust fan 10 pieces con-ssnnl 15
19 Foot Light Foot Light 10 pieces con-ssnnl 15
20 soft copper tubing soft copper tubing 16 rmt con-ssnnl 15
21 MS angle MS angle 2 pieces con-ssnnl 15
22 telephone telephone 10 pieces con-ssnnl 15
23 Metal Halide lamps Metal Halide lamps 10 pieces con-ssnnl 15
24 Metal Halide lamps Metal Halide lamps 30 pieces con-ssnnl 15
25 HPSV MH Lamp HPSV MH Lamp 10 pieces con-ssnnl 15
26 HPSV MH Lamp HPSV MH Lamp 30 pieces con-ssnnl 15
27 Switch board Switch board 10 pieces con-ssnnl 15
28 remote control ac and CELL remote control ac and CELL 4 pieces con-ssnnl 15
29 remote control panel assembly remote control panel assembly 4 pieces con-ssnnl 15
30 Shifting of Split A.C. Shifting of Split A.C. 10 pieces con-ssnnl 15
31 end termination kit end termination kit 10 pieces con-ssnnl 15
32 Straight through joint kit, Straight through joint kit, 10 pieces con-ssnnl 15
33 end termination kit end termination kit 5 pieces con-ssnnl 15
34 Straight through joint kit, Straight through joint kit, 5 pieces con-ssnnl 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder Turnover

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

OEM Annual Turnover

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer