Bid Publish Date
03-Jan-2025, 5:23 pm
Bid End Date
13-Jan-2025, 12:00 pm
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
A tender has been published for East Coast Railway Hydraulic Puller (Q3) in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 2 by. Submission Deadline: 13-01-2025 12: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Hydraulic Puller (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ALICO INDUSTRIAL ENTERPRISES Under PMA | Make : ARROW HYDRAULICS Model : AHP10 | 09-01-2025 12:17:38 | |
| 2 | COTS & COTS Under PMA | Make : ARROW HYDRAULICS Model : AHP10 | 13-01-2025 11:27:45 | |
| 3 | GRIPHOLD ENGINEERING PRIVATE LIMITED Under PMA | Make : Griphold Model : Gph-102 with accessories | 10-01-2025 15:48:44 | |
| 4 | JALAP ENTERPRISES Under PMA | Make : HYDTLKT Model : HYHP-10 | 04-01-2025 18:08:04 | |
| 5 | M.R.ENTERPRISES Under PMA | Make : HYDTLKT Model : HYHP-10 | 10-01-2025 21:15:39 | |
| 6 | M2R CIVILINFRA PRIVATE LIMITED Under PMA | Make : VANKOS Model : RC-HO-10/75 | 09-01-2025 06:26:28 | |
| 7 | mata enterprises Under PMA | Make : Unique Model : UPM1000 | 12-01-2025 23:57:12 | |
| 8 | PERFECT ENTERPRISES Under PMA | Make : HYDTLKT Model : HYHP-10 | 13-01-2025 11:15:03 | |
| 9 | POOJA INTERNATIONAL Under PMA | Make : Unique Model : UPM1000 | 11-01-2025 14:29:42 | |
| 10 | SR ENTERPRISES Under PMA | Make : ARROW HYDRAULICS Model : AHP10 | 04-01-2025 19:03:43 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | PERFECT ENTERPRISES Under PMA | Item Categories : Hydraulic Puller | |
| L2 | M.R.ENTERPRISES Under PMA | Item Categories : Hydraulic Puller | |
| L3 | COTS & COTS Under PMA | Item Categories : Hydraulic Puller | |
| L4 | mata enterprises Under PMA | Item Categories : Hydraulic Puller | |
| L5 | ALICO INDUSTRIAL ENTERPRISES Under PMA | Item Categories : Hydraulic Puller | |
| L6 | JALAP ENTERPRISES Under PMA | Item Categories : Hydraulic Puller | |
| L7 | SR ENTERPRISES Under PMA | Item Categories : Hydraulic Puller | |
| L8 | POOJA INTERNATIONAL Under PMA | Item Categories : Hydraulic Puller | |
| L9 | GRIPHOLD ENGINEERING PRIVATE LIMITED (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Hydraulic Puller | |
| L10 | M2R CIVILINFRA PRIVATE LIMITED Under PMA | Item Categories : Hydraulic Puller |
Key insights about ANDHRA PRADESH tender market
The eligibility requirements include being a registered entity in India, having relevant experience in supplying hydraulic equipment, and compliance with specified technical standards outlined in the tender documentation.
Bidders must submit all required certificates demonstrating compliance with industry standards and safety regulations. This includes documentation validating the technical specifications of the hydraulic pullers as per the tender requirements.
The registration process involves submitting an application through the specified online platform, and ensuring all necessary documentation is uploaded in the accepted formats as indicated in the tender guidelines.
Accepted document formats typically include PDF, JPEG, or any other format specified in the tender documentation. Bidders must refer to the guidelines for specific requirements.
The technical specifications include robust construction, compliance with safety standards, and performance metrics necessary for heavy-duty operations as detailed in the tender documentation.
Yes, bidders must adhere to recognized quality standards and have necessary certifications to ensure that the hydraulic pullers meet operational demands as specified in the tender documents.
Bidders must comply with all relevant regulations pertaining to the procurement of hydraulic equipment, including safety and technical specifications as outlined in the tender documentation.
Bidders are required to provide details about the testing criteria in their technical proposals, demonstrating how the hydraulic pullers meet operational specifications and quality assurance standards.
The EMD requirement is a financial guarantee to demonstrate the seriousness of the bidder's offer. It is specified in the tender documents and must be submitted along with the bid proposal.
Bidders must provide a performance security that typically represents a percentage of the contract value. This ensures the commitment to fulfill the contract obligations as stated in the tender documents.
Payment terms will be detailed in the tender documentation, outlining obligations regarding payment schedules, milestones, and final payment upon successful delivery and installation of the hydraulic pullers.
Price evaluations consider the total value of the bid, taking into account compliance with technical specifications, experience, and competitive pricing, in line with the tender evaluation process.
Bids must be submitted through the designated online platform as explained in the tender documentation. All documents need to be uploaded appropriately, adhering to the specifications provided.
Bidders should note important timelines detailed in the tender such as the proposal submission deadline, bid opening date, and any other relevant key milestones.
The evaluation and selection process involves reviewing submitted bids against technical specifications, financial aspects, and past performance metrics to ensure the most suitable provider is selected.
Bidders will be notified of the results through the designated communication channels indicated in the tender documents once the evaluation process has been completed.
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS