TenderDekho Logo
GEM

Invitation to Bid - Hydraulic Puller in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

03-Jan-2025, 5:23 pm

Bid End Date

13-Jan-2025, 12:00 pm

Progress

Issue03-Jan-2025, 5:23 pm
Technical01-Sep-2025, 12:17 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Categories 4

A tender has been published for East Coast Railway Hydraulic Puller (Q3) in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 2 by. Submission Deadline: 13-01-2025 12: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Hydraulic Puller (Q3)

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-7290852.pdf

Main Document

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Results

S.No Seller Item Date Status
1
ALICO INDUSTRIAL ENTERPRISES   Under PMA
Make : ARROW HYDRAULICS Model : AHP1009-01-2025 12:17:38
2
COTS & COTS   Under PMA
Make : ARROW HYDRAULICS Model : AHP1013-01-2025 11:27:45
3
GRIPHOLD ENGINEERING PRIVATE LIMITED   Under PMA
Make : Griphold Model : Gph-102 with accessories10-01-2025 15:48:44
4
JALAP ENTERPRISES   Under PMA
Make : HYDTLKT Model : HYHP-1004-01-2025 18:08:04
5
M.R.ENTERPRISES   Under PMA
Make : HYDTLKT Model : HYHP-1010-01-2025 21:15:39
6
M2R CIVILINFRA PRIVATE LIMITED   Under PMA
Make : VANKOS Model : RC-HO-10/7509-01-2025 06:26:28
7
mata enterprises   Under PMA
Make : Unique Model : UPM100012-01-2025 23:57:12
8
PERFECT ENTERPRISES   Under PMA
Make : HYDTLKT Model : HYHP-1013-01-2025 11:15:03
9
POOJA INTERNATIONAL   Under PMA
Make : Unique Model : UPM100011-01-2025 14:29:42
10
SR ENTERPRISES   Under PMA
Make : ARROW HYDRAULICS Model : AHP1004-01-2025 19:03:43

Financial Results

Rank Seller Price Item
L1
PERFECT ENTERPRISES   Under PMA
Item Categories : Hydraulic Puller
L2
M.R.ENTERPRISES   Under PMA
Item Categories : Hydraulic Puller
L3
COTS & COTS   Under PMA
Item Categories : Hydraulic Puller
L4
mata enterprises   Under PMA
Item Categories : Hydraulic Puller
L5
ALICO INDUSTRIAL ENTERPRISES   Under PMA
Item Categories : Hydraulic Puller
L6
JALAP ENTERPRISES   Under PMA
Item Categories : Hydraulic Puller
L7
SR ENTERPRISES   Under PMA
Item Categories : Hydraulic Puller
L8
POOJA INTERNATIONAL   Under PMA
Item Categories : Hydraulic Puller
L9
GRIPHOLD ENGINEERING PRIVATE LIMITED (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Hydraulic Puller
L10
M2R CIVILINFRA PRIVATE LIMITED   Under PMA
Item Categories : Hydraulic Puller

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

What are the eligibility requirements for bids related to hydraulic pullers?

The eligibility requirements include being a registered entity in India, having relevant experience in supplying hydraulic equipment, and compliance with specified technical standards outlined in the tender documentation.

What certifications are required for the hydraulic puller tender?

Bidders must submit all required certificates demonstrating compliance with industry standards and safety regulations. This includes documentation validating the technical specifications of the hydraulic pullers as per the tender requirements.

What is the process for registration to participate in this tender?

The registration process involves submitting an application through the specified online platform, and ensuring all necessary documentation is uploaded in the accepted formats as indicated in the tender guidelines.

What document formats are accepted for submission?

Accepted document formats typically include PDF, JPEG, or any other format specified in the tender documentation. Bidders must refer to the guidelines for specific requirements.

What are the technical specifications for the hydraulic pullers?

The technical specifications include robust construction, compliance with safety standards, and performance metrics necessary for heavy-duty operations as detailed in the tender documentation.

Are there any quality standards that bidders must comply with?

Yes, bidders must adhere to recognized quality standards and have necessary certifications to ensure that the hydraulic pullers meet operational demands as specified in the tender documents.

What compliance requirements are applicable for bidders?

Bidders must comply with all relevant regulations pertaining to the procurement of hydraulic equipment, including safety and technical specifications as outlined in the tender documentation.

What are the testing criteria for the hydraulic pullers?

Bidders are required to provide details about the testing criteria in their technical proposals, demonstrating how the hydraulic pullers meet operational specifications and quality assurance standards.

What is the Earnest Money Deposit (EMD) requirement?

The EMD requirement is a financial guarantee to demonstrate the seriousness of the bidder's offer. It is specified in the tender documents and must be submitted along with the bid proposal.

What performance security requirements must bidders fulfill?

Bidders must provide a performance security that typically represents a percentage of the contract value. This ensures the commitment to fulfill the contract obligations as stated in the tender documents.

What are the payment terms outlined in the tender?

Payment terms will be detailed in the tender documentation, outlining obligations regarding payment schedules, milestones, and final payment upon successful delivery and installation of the hydraulic pullers.

How are price evaluations conducted for bids?

Price evaluations consider the total value of the bid, taking into account compliance with technical specifications, experience, and competitive pricing, in line with the tender evaluation process.

What submission methods are allowed for the bids?

Bids must be submitted through the designated online platform as explained in the tender documentation. All documents need to be uploaded appropriately, adhering to the specifications provided.

What key timelines should bidders be aware of?

Bidders should note important timelines detailed in the tender such as the proposal submission deadline, bid opening date, and any other relevant key milestones.

How does the evaluation and selection process work?

The evaluation and selection process involves reviewing submitted bids against technical specifications, financial aspects, and past performance metrics to ensure the most suitable provider is selected.

How will bidders be notified of the results?

Bidders will be notified of the results through the designated communication channels indicated in the tender documents once the evaluation process has been completed.