The Madhya Pradesh Forest Department invites bids for an off-grid solar photovoltaic power plant in SAGAR, Madhya Pradesh (470001). The procurement covers supply, installation, testing and commissioning of the solar system with an EMD of ₹11,000. The tender references a flexible quantity clause allowing a ±25% adjustment at award and during the contract period, with delivery timelines tied to the original delivery end date and extended periods. The scope emphasizes turnkey procurement and on-site integration, including both hardware and commissioning services. Bidders should note the absence of BOQ itemization, suggesting a design-and-supply approach within the stated framework, and compliance with the option clause is mandatory.
Product/service: Off-grid Solar Photovoltaic Power Plant (V2) for MP Forest Department
Category: PV Module – Type and minimum Rated Power (Wp) requirement
Category: PCU/Solar Inverter – Rated Power (kVA) and charger technology
Scope: Supply, Installation, Testing and Commissioning
EMD: ₹11,000
Delivery location: SAGAR, Madhya Pradesh
Option clause: ±25% quantity with extension rules
EMD: ₹11,000 to be submitted with bid
Quantity adjustments up to ±25% at contract award and during currency
SCIC: Bid price must cover Supply, Installation, Testing and Commissioning
Delivery period begins from last date of original delivery order; extensions governed by formula
Not specified in data; ensure terms align with general government procurement norms outlined in ATC/ATC amendments
Delivery period calculated per option clause; minimum 30 days for additional time; base from last date of original order
Not specified in available data; subject to ATC terms and contract clause
Experience in supplying and installing off-grid solar PV systems
Financial capacity to undertake turnkey SCIC projects
Compliance with ATC terms and certificate submission requirements
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Solapur Zilla Parishad
SOLAPUR, MAHARASHTRA
N/a
SOLAPUR, MAHARASHTRA
Pune District Panchayats
PUNE, MAHARASHTRA
Zilla Parishad Satara
SATARA, MAHARASHTRA
Uttar Pradesh Forest Corporation
LUCKNOW, UTTAR PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | Capacity of power plant (kVA) | 5 |
| PV Module | Type of Solar Module | Crystalline Silicon Terrestrial Photovoltaic (PV) modules conforming to IS 14286 IS/IEC 61730 -1 IS/IEC 61730 -2 |
| PV Module | Rated power of PV module (in Wp) - Minimum | 4000 |
| Power Conditioning Unit (PCU)/ Solar Inverter | Rated Power (in kVA) (Hint: Inverter Rating) | 5.0 |
| Power Conditioning Unit (PCU)/ Solar Inverter | Charger technology | MPPT |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates in similar solar PV projects
Financial statements (latest)
EMD receipt or proof of payment (₹11,000)
Technical bid documents
OEM authorization or certifications (if applicable)
Any Certificates requested in ATC/ Corrigendum
Key insights about MADHYA PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD ₹11,000, and technical documents. Ensure OEM authorizations if applicable, and comply with the option clause allowing ±25% quantity changes. Include SCIC scope, delivery schedule, and ATC-corroborated certificates to avoid rejection.
Required documents include GST certificate, PAN, experience certificates in similar solar projects, latest financial statements, EMD receipt of ₹11,000, technical bid documents, and OEM authorizations if required. Ensure ATC/corrigendum certificates are uploaded to prevent bid rejection.
Specifications cover PV module type and minimum rated power (Wp), PCU/inverter rated power in kVA, and charger technology. The scope includes supply, installation, testing and commissioning. Delivery is to SAGAR, MP, with adherence to option clause for quantity adjustments.
The EMD is ₹11,000. Payment proof must accompany the bid as part of the submission package, along with GST, PAN, experience and financial documents, and all requested technical certificates.
Delivery starts from the last date of the original delivery order; the extended time for added quantity is calculated as (increased quantity/original quantity) × original period, with a minimum of 30 days.
Eligibility requires prior experience in similar solar PV turnkey projects, sufficient financial capacity, GST/PAN compliance, and submission of OEM authorizations or certifications if specified in ATC. Ensure you meet the 25% quantity option and timely SCIC delivery.
Submit the ATC-compliant certificates and the Corrigendum (if any), along with standard bid documents (GST, PAN, experience, financials) and EMD. Non-compliance leads to bid rejection; verify all attachments match the ATC requirements.
If quantity increases, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is shorter than 30 days, the additional time equals the original period.