TenderDekho Logo
Active GEM

Centre For Development Of Advanced Computing Molded Case Circuit Breaker Tender Thiruvananthapuram Kerala 2026

Bid Publish Date

26-Oct-2026, 2:10 pm

Bid End Date

07-Nov-2026, 5:00 pm

Progress

Issue26-Oct-2026, 2:10 pm
AwardPending

Key Highlights

  • • OEM Authorization Certificate required with quotation
  • • Part Number, Make/Brand and datasheets must be furnished
  • • Up to 25% quantity variation at contracted rates
  • • Delivery period starts from last date of original delivery order

Tender Overview

Centre For Development Of Advanced Computing (c-dac), operating under the Department Of Electronics And Information Technology, seeks bids for a range of switchgear items including Molded Case Circuit Breaker, Extended Front Terminals, Rotary handle operating mechanism, Manual Change over switch I-0-II with external Direct handle, Electromechanical contactors, and Manual Transfer BYPASS Switch. Location: Thiruvananthapuram, Kerala – 695001. The procurement scope is wired to a supply-only contract with a multi-item BOQ, totaling 6 items. The tender emphasizes verifiable bidder credibility via Part Number, Make/Brand, and datasheets, and requires a valid OEM Authorization Certificate. The option clause allows up to 25% quantity variation at contracted rates, with delivery timelines linked to the original delivery order. Unique for Kerala government procurement, this tender mandates complete product documentation and brand traceability to ensure compatibility with existing infrastructure.

Technical Specifications & Requirements

  • Scope: Supply of goods only for 6 items listed in the BOQ (all items identified as switchgear components).
  • Key requirements: Provide Part Number, Make/Brand, and relevant datasheets for each quoted item.
  • OEM authorization: Submit a valid OEM Authorization Certificate with quotation.
  • Quantity flexibility: Up to +25% increase in quantity during contract execution; extended delivery time calculated as (increased quantity / original quantity) × original delivery period with a minimum of 30 days.
  • Delivery location: Thiruvananthapuram, Kerala; compliance with local procurement norms.
  • Tender type: Supply of goods only; no installation services included.

Terms, Conditions & Eligibility

  • EMD/financials: Not specified in the provided data; ensure readiness for standard EMD submission if applicable.
  • Delivery terms: Delivery period linked to the last date of the original delivery order; extended period applies if option clause is exercised.
  • Documentation: Include Part Number, Make/Brand, datasheets, and OEM Authorization Certificate with quotation.
  • Bid scope: Only supply of goods; no service or warranties specified in the data.
  • Bid clausal notes: Vendors must adhere to the tender specifications and provide traceable brand information and datasheets.

Key Specifications

  • Product category: Molded Case Circuit Breaker and allied switchgear

  • Quantity: 6 items in BOQ (specific quantities not disclosed)

  • Delivery location: Thiruvananthapuram, Kerala

  • Scope: Supply of goods only; no installation

  • Documentation: Part Number, Make/Brand, datasheets, OEM authorization

Terms & Conditions

  • 25% quantity variation allowed at contract initiation/within contract

  • Delivery timeline calculated from last original delivery order date

  • OEM authorization and datasheet submission is mandatory

Important Clauses

Delivery Terms

Delivery period starts from the last date of the original delivery order; additional time for increased quantity follows (Increased quantity / Original quantity) × Original delivery period, minimum 30 days

OEM Authorization

Quotations must be accompanied by a valid OEM Authorization Certificate and brand/datasheet documentation

Scope of Supply

Bid price must include all cost components for the supply of goods only

Bidder Eligibility

  • Must provide OEM authorization

  • Must quote with Part Number, Make/Brand and datasheets

  • Supply-only bid for switchgear items; installation not included

Advertisement

Tender Data

Bid Details

Quantity

7

Category

Molded Case Circuit Breaker

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Molded Case Circuit Breaker , Extended Front Terminals , Rotary handle operating mechanism , Manual Change over switch I-0-II with external Direct handle , Electromechanical contactors , Manual Transfer BYPASS Switch

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Thiruvananthapuram

Delivery Pincodes

695033

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manupriya M695033,Purchase Department, Centre for Development of Advanced Computing, VellayambalamThiruvananthapuramKerala695033145-

Authority Records

MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGYELECTRONICS AND INFORMATION TECHNOLOGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10081673.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Molded Case Circuit Breaker

Molded Case Circuit Breaker

1 pieces Delivery: 45 days
#2

Extended Front Terminals

Extended Front Terminals 4 pieces suitable for the item 1

1 pieces Delivery: 45 days
#3

Rotary handle operating mechanism

Rotary handle operating mechanism with Padlock device suitable for the item 1

1 pieces Delivery: 45 days
#4

Manual Change over switch I-0-II with external Direct handle

Manual Change over switch I-0-II with external Direct handle

1 pieces Delivery: 45 days
#5

Electromechanical contactors

Electromechanical contactors

2 pieces Delivery: 45 days
#6

Manual Transfer BYPASS Switch

Manual Transfer/BYPASS Switch I-0-II with external Direct handle

1 pieces Delivery: 45 days
Advertisement

Categories 16

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Product datasheets for all quoted items

3

Part Number and Make/Brand details for each item

4

Bidder's general information and contact details

5

Any standard bid documents as per buyer terms (if applicable)

Frequently Asked Questions

Key insights about KERALA tender market

How to bid for CDAC switchgear tender in Thiruvananthapuram 2026?

Bidders must submit OEM authorization along with Part Number, Make/Brand, and datasheets. Ensure supply-only scope and adhere to up to 25% quantity variation. Prepare product-specific documents and verify Thiruvananthapuram Kerala procurement norms. Delivery timelines depend on the last date of the original delivery order.

What documents are required for the Thiruvananthapuram switchgear bid 2026?

Prepare OEM Authorization Certificate, product datasheets, Part Number and Make/Brand details for each item, bidder information, and any standard bid forms. Ensure all items are supply-only with complete documentation for audit and compliance.

What is the scope of supply for the CDAC tender in Kerala?

The scope is strictly supply of goods for 6 switchgear items, including MCCBs and related components. No installation or commissioning services are included; bid must cover all costs for supply only.

What is the delivery period policy for quantity changes in this tender?

Delivery timing is tied to the original delivery order date. If quantity increases by up to 25%, the additional time is calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.

Are there any specific brand or standard requirements for this tender?

Bidders must provide Make/Brand information and datasheets; OEM authorization is mandatory. While no specific standard is listed in the data, ensure compatibility with common industry switchgear standards and verification through datasheets.

What does 'supply of goods only' imply for this CDAC tender?

It means the contract covers only procurement and delivery of switchgear items, with no on-site installation, testing, or commissioning services included in the bid or scope.

How is the 25% quantity variation managed in this tender?

The purchaser may increase or decrease the quantity by up to 25% at contract placement or during the currency of the contract, at contracted rates, ensuring delivery time adjustments per policy.

When can bidders expect the final delivery schedule for Kerala procurement?

Final delivery dates align with the original delivery order’s last date; any option-driven extension follows the calculated time rule and must maintain a minimum 30-day extension where applicable.

Advertisement