Progress
The Indian Army, Department Of Military Affairs, invites bids for multiple items including BUDHA WATER FOUNTAIN, BADMINTON INCLUDING SHUTTLECOCK, ELECTRIC DIFFUSER, WALL FAN and FS PAPER at Senapati, Manipur 795007. The exact quantities are not disclosed, but the tender supports a flexible quantity option of ±25% during contract execution. The procurement aims to furnish unit location needs with required quality and freshness checks, including sample submission. A crucial differentiator is the mandatory submission of GST and OEM certificates, plus a sample item at the unit location to demonstrate quality standards.
Product names from BOQ: N/A (5 items listed: water fountain, badminton gear with shuttlecock, electric diffuser, wall fan, FS paper)
Quantities: Not disclosed; quantity variation up to 25%
Estimated value: Not provided
Standards/certifications: GST; OEM certificate required
Delivery: Flexible per original and extended delivery period with minimum 30 days
Quality/Testing: Sample at unit location to assess quality
Quantity may increase or decrease by up to 25% at contract placement and during contract currency
Mandatory GST registration and OEM authorization; provide item sample at unit location
Delivery period calculated with specified formula and minimum 30 days; extended delivery allowed
Not specified in provided data; bidders should anticipate standard government terms per applicable procurement rules
Delivery starts from the last date of original delivery order; quantity variations trigger adjusted delivery periods with minimum 30 days
Not detailed in data; follow standard L1/L2 penalties and LD clauses as per DMA guidelines
GST registration valid in India
OEM authorization/certificate for supplied items
Ability to supply samples at unit location for quality verification
Compliance with Buyer Added Terms and ATC clauses, including quantity variation and delivery timelines
Quantity
9
Category
BUDHA WATER FOUNTAIN
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
20 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
BUDHA WATER FOUNTAIN , BADMINTION INCLUDING SHUTTLECOCK , ELECTRIC DIFFUSER , WALL FAN , FS PAPER
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Senapati
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Senapati | Senapati | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
BUDHA WATER FOUNTAIN
BUDHA WATER FOUNTAIN
BADMINTION INCLUDING SHUTTLECOCK
BADMINTION INCLUDING SHUTTLECOCK
ELECTRIC DIFFUSER
ELECTRIC DIFFUSER
WALL FAN
WALL FAN
FS PAPER
FS PAPER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BUDHA WATER FOUNTAIN | BUDHA WATER FOUNTAIN | 1 | nos | consignee210cts | 30 | |
| 2 | BADMINTION INCLUDING SHUTTLECOCK | BADMINTION INCLUDING SHUTTLECOCK | 2 | nos | consignee210cts | 30 | |
| 3 | ELECTRIC DIFFUSER | ELECTRIC DIFFUSER | 1 | nos | consignee210cts | 30 | |
| 4 | WALL FAN | WALL FAN | 4 | nos | consignee210cts | 30 | |
| 5 | FS PAPER | FS PAPER | 1 | nos | consignee210cts | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
OEM certificate/authorization
Bidder's sample submission at unit location
Technical bid documents demonstrating product conformity
Financial statements (as per standard procurement norms)
Experience certificates (if applicable to similar items)
Any additional documents required under Buyer Added Terms and Conditions
Key insights about MANIPUR tender market
To bid, ensure GST and OEM certificates are ready, provide a product sample at the unit location, and be prepared for a ±25% quantity variation. Submit technical and financial bids as per DMA terms, and comply with ATC clauses including delivery timelines.
Required documents include GST registration, OEM certificate, sample at unit location, technical bid, financial statements, and experience certificates if applicable. Ensure readiness to meet Buyer Added Terms and demonstrate quality via the sample item.
Delivery begins after the last date of the original delivery order. The option clause allows up to a 25% quantity increase during the contract with a delivery time adjustment formula; minimum delivery period is 30 days when extended.
Vendors must provide GST registration and OEM certificates. While no product-specific standards are listed, samples must pass quality checks at the unit location, ensuring basic conformity to procurement norms.
Quantity variation up to 25% is allowed at contract signing and during the currency of contract. Delivery period adjusts using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must provide a sample of the item at the unit location to demonstrate quality. The sample submission is mandatory alongside GST and OEM certificates for bid evaluation.