Bid Publish Date
29-Sep-2026, 3:35 pm
Bid End Date
20-Oct-2026, 4:00 pm
Location
Progress
Bharat Dynamics Limited invites bids for the Spherical Hydrophone 8105 with AC-0034 cable and JP-0108 BNC (M) 10m, under PAC. Location is Visakhapatnam, Andhra Pradesh. Scope includes supply, certification, and delivery to BDL at no cost to the buyer, with a quoted cadence of 6 months from PO. Bidders must be OEM or OEM-Authorized dealers, backed by OEM manufacturing authorization. Key differentiators include stringent CoCs/Test reports and on-time acceptance criteria. This procurement targets high-precision underwater sensing equipment and requires compliance with Annexure-1 technical specs.
PAC eligibility with OEM/OEM authorized dealers only
Delivery within 6 months with free dispatch to BDL
18-month warranty and 0.5% weekly LD up to 10% maximum
Payment terms: 95% after acceptance; 5% on PBG submission
CoCs/Test certificates required for acceptance
95% basic price + taxes within 30 days after receipt/acceptance; 5% basic price against PBG valid through warranty + 3 months claim period
Delivery within 06 months from PO date; items packed with proper markings and delivered to BDL free of cost
LD at 0.5% of undelivered stores per week, max 10%; time is of the essence
OEM/OEM Authorized dealer status with valid authorization
Compliance with Annexure-1 technical specifications
Ability to deliver within 06 months and provide CoCs/Test reports
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
18 months
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Standard Hydrophone (B&K 8105)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
21
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Visakhapatnam
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Visakhapatnam | Visakhapatnam | - | - | 1 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
OEM Manufacturing Authorization Certificate
Test certificates and Calibration reports (CoCs)
Annexure-1 compliance statement
Bid document uploads per ATC/Corrigendum
Key insights about ANDHRA PRADESH tender market
Bidders must be OEM or OEM-authorized dealers, submit OEM authorization with the bid, and provide CoCs, calibration reports, and Test Certificates per Annexure-1. Delivery is within 6 months; payment terms are 95% within 30 days of acceptance, 5% on PBG submission.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization certificate, CoCs, test/calibration certificates, and Annexure-1 compliance statement. Ensure all documents are uploaded with the bid to avoid rejection under T&C.
Delivery must occur within 06 months of PO, with free dispatch to BDL and proper packaging. Warranty lasts 18 months from acceptance, covering repair or replacement of faulty components at no cost.
Payment is 95% of basic price plus taxes within 30 days after receipt/acceptance; the remaining 5% is paid after submission of a PBG valid through warranty plus 3 months claim period.
Suppliers must comply with Annexure-1 technical specs, provide CoCs, calibration reports, and OEM manufacturing authorization. Items must be verified by BDL QC, and acceptance hinges on these documents.
Late delivery incurs LD of 0.5% of the price per week, up to a maximum of 10%. Time is deemed essential; extensions do not increase tax costs per the ATC terms.
Acceptance is based on submission and review of CoCs/Test reports and calibration certificates. Only upon successful verification will BDL issue acceptance for final delivery and payment processing.