TenderDekho Logo
Closed GEM

Government Tender Published for Attending DG fault,Attending DG fault,Attending DG fault,ReplacementlubeoilandFilters,Replacementlu in RAJKOT, GUJARAT

Bid Publish Date

02-Jan-2025, 1:54 pm

Bid End Date

13-Jan-2025, 3:00 pm

Value

₹4,76,320

Progress

Issue02-Jan-2025, 1:54 pm
Technical13-01-2025 11:14:46
Financial
AwardCompleted

Bharat Sanchar Nigam Limited Portal(bsnl) has released a public tender for Attending DG fault, ReplacementlubeoilandFilters, Rewiring, SFofSMPS, RepairingBattery Charger, SF ofParts, RSofselfstarter, Calibrationof fuelpump, SFElect Component, Replacement AVR, Replacement of Diode plate, Hiring of Batteries, Servicing Radiator, RepairingandSer ofRadiator, Dismantling shifting DG set, Transportation of DG set, Dismantling shifting DG set within compound, ITC of DG set, Supply of MS Pipe, Transporting Dept Cable, Cable Joint in RAJKOT, GUJARAT. Quantity: 264. Submission Deadline: 13-01-2025 15: 00: 00. Download documents and apply online.

Technical Results

S.No Seller Item Date Status
1
GIRNAR ELECTRICALS   Under PMA
-13-01-2025 11:14:46
2
SUPER ELECTRICALS   Under PMA
-11-01-2025 18:15:07

Financial Results

Rank Seller Price Item
L1
SUPER ELECTRICALS   Under PMA
Item Categories : Attending DG fault,Attending DG fault,Attending DG fault,ReplacementlubeoilandFilters,Replacementlu
L2
GIRNAR ELECTRICALS   Under PMA
Item Categories : Attending DG fault,Attending DG fault,Attending DG fault,ReplacementlubeoilandFilters,Replacementlu

Tender Data

Bid Details

Quantity

264

Category

Attending DG fault

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

2

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Attending DG fault , ReplacementlubeoilandFilters , Rewiring , SFofSMPS , RepairingBattery Charger , SF ofParts , RSofselfstarter , Calibrationof fuelpump , SFElect Component , Replacement AVR , Replacement of Diode plate , Hiring of Batteries , Servicing Radiator , RepairingandSer ofRadiator , Dismantling shifting DG set , Transportation of DG set , Dismantling shifting DG set within compound , ITC of DG set , Supply of MS Pipe , Transporting Dept Cable , Cable Joint

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7326412.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 63 Items Sign in for GEM prices

#1

Attending DG fault

As per ATC 1(a)

1 job Delivery: 720 days
#2

Attending DG fault

As per ATC 1(b)

1 job Delivery: 720 days
#3

Attending DG fault

As per ATC 1(c)

1 job Delivery: 720 days
#4

ReplacementlubeoilandFilters

As per ATC 2(a)

1 job Delivery: 720 days
#5

ReplacementlubeoilandFilters

As per ATC 2(b)

1 job Delivery: 720 days
#6

ReplacementlubeoilandFilters

As per ATC 2(c)

1 job Delivery: 720 days
#7

ReplacementlubeoilandFilters

As per ATC 2(d)

1 job Delivery: 720 days
#8

Rewiring

As per ATC 3(a)

1 job Delivery: 720 days
#9

Rewiring

As per ATC3(b)

1 job Delivery: 720 days
#10

SFofSMPS

As per ATC4(a)

1 job Delivery: 720 days
#11

SFofSMPS

As per ATC4(b)

1 job Delivery: 720 days
#12

RepairingBattery Charger

As per ATC5(a)

1 job Delivery: 720 days
#13

RepairingBattery Charger

As per ATC5(b)

1 job Delivery: 720 days
#14

SF ofParts

As per ATC6(a)

1 job Delivery: 720 days
#15

SF ofParts

As per ATC6(b)

2 nos Delivery: 720 days
#16

SF ofParts

As per ATC6(c)

1 no Delivery: 720 days
#17

SF ofParts

As per ATC6(d)

25 ltrs Delivery: 720 days
#18

SF ofParts

As per ATC6(e)

1 no Delivery: 720 days
#19

RSofselfstarter

As per ATC7(a)

1 set Delivery: 720 days
#20

RSofselfstarter

As per ATC7(b)

1 no Delivery: 720 days
#21

RSofselfstarter

As per ATC7(c)

1 no Delivery: 720 days
#22

RSofselfstarter

As per ATC7(d)

1 no Delivery: 720 days
#23

Calibrationof fuelpump

As per ATC 8(a)

2 job Delivery: 720 days
#24

Calibrationof fuelpump

As per ATC 8(b)

1 job Delivery: 720 days
#25

SFElect Component

As per ATC 9(a)

10 nos Delivery: 720 days
#26

SFElect Component

As per ATC 9(b)

1 no Delivery: 720 days
#27

SFElect Component

As per ATC 9(c)

1 no Delivery: 720 days
#28

SFElect Component

As per ATC 9(d)

5 nos Delivery: 720 days
#29

SFElect Component

As per ATC 9(e)

2 nos Delivery: 720 days
#30

SFElect Component

As per ATC 9(f)

1 no Delivery: 720 days
#31

SFElect Component

As per ATC 9(g)

2 no Delivery: 720 days
#32

SFElect Component

As per ATC 9(h)

2 no Delivery: 720 days
#33

Replacement AVR

As per ATC10(a)

1 job Delivery: 720 days
#34

Replacement AVR

As per ATC 10(b)

1 job Delivery: 720 days
#35

Replacement AVR

As per ATC 10( c)

1 job Delivery: 720 days
#36

Replacement of Diode plate

As per ATC 11

1 job Delivery: 720 days
#37

Hiring of Batteries

As per ATC 12

1 job Delivery: 720 days
#38

Servicing Radiator

As per ATC 13(a)

1 job Delivery: 720 days
#39

Servicing Radiator

As per ATC 13(b)

1 job Delivery: 720 days
#40

Servicing Radiator

As per ATC 13( c)

1 job Delivery: 720 days
#41

RepairingandSer ofRadiator

As per ATC 14

1 job Delivery: 720 days
#42

Dismantling shifting DG set

As per ATC 15(a)

1 job Delivery: 720 days
#43

Dismantling shifting DG set

As per ATC 15(b)

1 job Delivery: 720 days
#44

Dismantling shifting DG set

As per ATC 15(c)

1 job Delivery: 720 days
#45

Dismantling shifting DG set

As per ATC 15(d)

1 job Delivery: 720 days
#46

Transportation of DG set

As per ATC 16(a)

50 km Delivery: 720 days
#47

Transportation of DG set

As per ATC 16(b)

50 km Delivery: 720 days
#48

Transportation of DG set

As per ATC 16(c)

50 km Delivery: 720 days
#49

Dismantling shifting DG set within compound

As per ATC 17(a)

2 job Delivery: 720 days
#50

Dismantling shifting DG set within compound

As per ATC 17(b)

2 job Delivery: 720 days
#51

Dismantling shifting DG set within compound

As per ATC 17(c)

1 job Delivery: 720 days
#52

Dismantling shifting DG set within compound

As per ATC 17(d)

1 job Delivery: 720 days
#53

ITC of DG set

As per ATC 18(a)

2 job Delivery: 720 days
#54

ITC of DG set

As per ATC 18(b)

2 job Delivery: 720 days
#55

ITC of DG set

As per ATC 18 ( c)

2 job Delivery: 720 days
#56

ITC of DG set

As per ATC 18(d)

1 job Delivery: 720 days
#57

Supply of MS Pipe

As per ATC 19(a)

1 meter Delivery: 720 days
#58

Supply of MS Pipe

As per ATC 19(b)

1 meter Delivery: 720 days
#59

Supply of MS Pipe

As per ATC 19( c)

1 meter Delivery: 720 days
#60

Supply of MS Pipe

As per ATC 19 (d)

1 meter Delivery: 720 days
#61

Transporting Dept Cable

As per ATC 20(a)

4 job Delivery: 720 days
#62

Transporting Dept Cable

As per ATC 20(b)

4 job Delivery: 720 days
#63

Cable Joint

As per ATC 21

2 job Delivery: 720 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements?

To participate in the tender, bidders must be registered entities and provide substantial documentation proving their technical capabilities. This includes demonstrating relevant experience, past performance, and OEM authorization certificates. Additionally, financial documents ensuring sufficient turnover are necessary.

What certificates are required?

Bidders are required to submit various certifications, including but not limited to experience criteria certifications, OEM authorization certificates, and your firm's annual turnover certificates as specified in the tender documents.

What is the registration process for bidders?

Bidders must register on the official bidding platform. Once registered, they can upload the required documents and submit bids in accordance with the provided guidelines outlined in the tender details.

What document formats are accepted for submission?

Documents must typically be submitted in PDF format, as specified in the submission guidelines. Again, ensure all documents meet the requirements as detailed in the tender documentation.

What are the technical specifications outlined in the tender?

The tender specifies that services should include thorough assessments of DG sets, necessary repairs, replacements, and any additional work required for optimal performance of the generator sets, including both hardware and installation aspects.

Are there specific quality standards to comply with?

Yes, compliance with industry standards is mandatory. Bidders must prove their adherence to these standards through accompanying documentation, ensuring that quality and safety protocols are followed during repairs and servicing.

What compliance requirements must bidders fulfill?

Bidders must comply with the legal regulations governing their operations as well as any additional guidelines prescribed by the Department of Telecommunications. This encompasses certification requirements and confirmation of adherence to all relevant safety and operational protocols.

Are there testing criteria outlined in the tender?

While the main focus is on servicing and repairing DG sets, specific testing criteria will be necessary to ensure all work meets operational standards. Documentation confirming successful tests may be required post-repair.

What are the details regarding the Earnest Money Deposit (EMD)?

The specific details regarding the Earnest Money Deposit will be outlined in the tender documentation. Bidders should review the terms to understand the financial commitment required during the bidding process.

What are the performance security requirements?

Bidders will be required to furnish performance security as part of contract conditions. This is typically a percent of the contract value, ensuring compliance with service delivery and quality standards.

What payment terms should bidders expect?

Payment terms will be specified in the contractual agreement and are linked to the successful completion of services and associated quality checks as laid out in the tender documents.

What price evaluation considerations are there?

Bids will be evaluated based on a comprehensive review of the pricing submitted along with the compliance to technical specifications. The total value evaluation ensures the best value for the Department of Telecommunications.

How are submissions to be made?

Bidders must submit their proposals electronically through the specified bidding portal, ensuring all requisite documents are included for assessment at the time of submission.

What are key timelines for this tender?

Specific timelines including bid submission, opening, and operational commencement will be specified in the tender documents. Bidders are encouraged to keep abreast of these timelines to ensure timely submissions.

How will the evaluation and selection process occur?

Bids will undergo a rigorous evaluation process focusing on both financial and technical aspects. The winning bid will be selected based on adherence to criteria, quality assurances, and overall value offered.

When will bidders be notified of the results?

Bidders will be notified of the outcome of their submissions within the timeframe specified in the tender documents. All communications will follow official channels as per the guidelines provided.

What benefits are offered for MSEs?

Micro, Small, and Medium Enterprises may be entitled to exemptions from certain criteria. Detailed provisions can be found in the tender documents, which encourage the participation of smaller firms in government contracts.

Are there specific provisions for startups?

Startups can also benefit from relaxed criteria. They should look through the provided documents for specific terms that could assist in their eligibility and competitiveness during the bidding process.

How does this tender align with 'Make in India' policies?

The tender supports local industries by encouraging participation from domestic firms, aligning well with the 'Make in India' initiative. Bidders are urged to demonstrate compliance with local content and procurement rules.