TenderDekho Logo
Active GEM

Indian Army Fire Retardant Tarpaulin Tender Pathankot Punjab 2026 ISI/ILAC Standards

Bid Publish Date

22-Jul-2026, 8:38 pm

Bid End Date

27-Jul-2026, 11:00 am

Progress

Issue22-Jul-2026, 8:38 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

50

Bid Type

Two Packet Bid

Categories 1

Tender Overview

The procurement is for Indian Army under the Department Of Military Affairs located in Pathankot, Punjab for a Fire Retardant Tarpaulin (Q3). Tender details emphasize color, fabric weave construction per square inch, rope parameters (number, diameter, material), and verification via centralized test reports. The opportunity references an option clause allowing ±25% quantity adjustments at contracted rates, with delivery timelines linked to the original order and possible extensions. No BOQ items are listed, and the estimated value and EMD are not disclosed in the provided data. The tender’s differentiator lies in test-report requirements (Central Govt/NABL/ILAC accreditation) and on-demand conformity documentation. This signals a compliant, standards-driven supply contract with emphasis on material specifications and quality verification.

Technical Specifications & Requirements

  • Product: Fire Retardant Tarpaulin (Q3)
  • Color: specified but not enumerated here; ensure exact hue per purchase order
  • Fabric details: Fabric weave construction per square inch; require precise weave density
  • Rope: properties to include Number of Rope, Diameter, and Rope Material
  • Testing: Availability of Test Report from Central Govt/NABL/ILAC accredited lab; report to be provided on demand
  • Documentation: conform to specified test reports for conformity to specification; ensure IS/IEC alignment if applicable
  • No BOQ items listed; focus on meeting the above technical and test requirements

Terms, Conditions & Eligibility

  • Delivery terms: option to increase quantity up to 25% of bid quantity; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Delivery period alignment with original delivery order; extensions allowed during currency of contract
  • Compliance: bidders must adhere to the purchaser’s option clause and verify conformity to test-report requirements
  • EMD/financial terms: not disclosed in the provided information; bidders should confirm during bid submission
  • Documents: ensure readiness of mandatory GST, PAN, and test reports upon demand; ATC may include additional bidder obligations

Key Specifications

  • Product/service: Fire Retardant Tarpaulin (Q3)

  • Key specs: color, fabric weave construction per square inch, rope details (number, diameter, material)

  • Testing: NABL/ILAC accredited lab conformity report; test report availability on demand

  • Delivery: follow original delivery period with potential 25% quantity adjustment

  • Documentation: conformity to specified test reports and IS/quality standards where applicable

Terms & Conditions

  • EMD amount and exact delivery dates not disclosed in tender data

  • Quantity may be increased by 25% during contract; delivery period scales with quantity

  • Test reports must be from Central Govt/NABL/ILAC accredited labs and provided on demand

Important Clauses

Payment Terms

Not specified in data; bidders should verify ATC for advance or milestone payments

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time formula applies with minimum 30 days

Penalties/Liquidated Damages

Not detailed in provided information; ATC may include penalties for late delivery

Bidder Eligibility

  • Experience in supplying fire retardant textiles or tarpaulins

  • Ability to furnish NABL/ILAC accredited test reports on demand

  • Compliance with 25% quantity option and associated delivery schedule

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fire Retardant Tarpaulin (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

PATHANKOT

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PATHANKOTPATHANKOT--5015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9604376.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Color Blue
Additional Information Features Good flame retardancy
Additional Information Fabric Weave Construction, per square-Inch 12 x 12
Rope Number of Rope 8
Rope Diameter 8 mm
Rope Rope Material Polypropylene Rope
Test Report Details Availability of Test Report from Central Govt/NABL/ILAC accredited lab to prove conformity to specification Yes
Test Report Details Test Report to be submitted to the Buyer on Demand Yes

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant to tarpaulin or similar textile products)

4

Financial performance statements (as required by terms)

5

EMD/Security deposit documents (amount to be confirmed in ATC)

6

Technical bid documents confirming fabric weave, rope specs, and flame retardant standard

7

OEM authorizations or supplier certifications (if applicable)

8

Test reports from Central Govt/NABL/ILAC accredited lab (on demand)

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for fire retardant tarpaulin tender in Pathankot?

Bidders should prepare GST, PAN, financial statements, experience proofs, and ensure NABL/ILAC accredited test reports. The ATC permits up to 25% quantity variation; confirm delivery terms and EMD amount with the buyer. Ensure tarpaulin meets Q3 fire retardant standards and rope specifications as specified.

What documents are required for tarpaulin tender in Indian Army Pathankot?

Required documents include GST certificate, PAN card, experience certificates, financial statements, EMD documentation, technical bid for weave and rope specs, OEM authorizations if applicable, and test reports from Central Govt/NABL/ILAC labs on demand.

What are the test report requirements for tarpaulin conformity?

Conformity testing must be from a Central Govt/NABL/ILAC accredited lab. A test report must be available on demand to prove compliance with specified tarpaulin standards and safety criteria; ensure report validity during bid submission.

What is the delivery extension rule for quantity variation?

Delivery time adjusts by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend to match the original delivery period while exercising the option clause.

What standards apply to the fire retardant tarpaulin?

Standards include fire retardant properties for Q3 category and IS/quality-related requirements as applicable. Ensure color, weave density, rope specs, and material meet stated scope and any referenced BIS/IS norms in ATC.

When is the bid submission window for this tarpaulin tender?

The exact start and end dates are not provided in the data. Bidders should monitor the tender portal for notifications, ATC, and submission deadlines once the tender is published.

What is required to demonstrate eligibility for PPE/tarpaulin supply?

Demonstrate prior supply of tarpaulins or similar textiles, provide experience certificates, ensure financial stability with statements, and present NABL/ILAC test reports if demanded. Verify EMD details and supplier authorization if applicable.

What happens if the tender quantities increase during contract?

If quantities increase by up to 25%, the contract value remains at the contracted rates. Delivery timelines shift proportionally using the prescribed formula, with minimum 30 days extra, subject to extension possible during currency.