Bid Publish Date
18-Sep-2026, 7:07 pm
Bid End Date
06-Oct-2026, 5:00 pm
Location
Progress
The Government e-Marketplace (GEM) tender in Bhopal, Madhya Pradesh 462001 seeks procurement related to AIO display solutions and/or laptops with OEM letterhead specifications and preloaded Windows operating system confirmations. The opportunity includes an estimated quantity flexibility up to 25% at contracted rates and a delivery period tied to the last delivery order date, with a minimum extension rule of 30 days. A mix of compliance declarations from the OEM will be required, including RoHS, Energy Star, UL, CE, FCC, and TCO certificates for displays in AIO configurations. The tender emphasizes supplier eligibility criteria around OEM reputation and ongoing support commitments, ensuring that the selected bidder can supply within MP and provide onsite service.
Option to increase/decrease quantity by up to 25% during contract
Delivery extension calculated with a minimum 30 days
OEM-driven requirements: BOM, Windows preloads, RoHS/IS compliance
Top IDC ranking certification and non-blacklist status for the last 5 years
GSTR 3B to be uploaded; MAF for AIO/Laptop as bid requirement
Not explicitly stated; bidders should verify during bid submission and align with contract clauses.
Delivery starts from last date of original delivery order; extension duration = (Increased quantity / Original quantity) × Original delivery period, minimum 30 days.
Not detailed in data; bidders must await contract terms for LDs or penalties.
OEM authorization and BOM declaration required
Top IDC ranking certificate in AIO category within the last 12 months
Not blacklisted by Govt/Semi Govt/Educational institutions in the last 5 years
Quantity
5
Bid Type
Service
EMD Required
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Tender Category
Goods
Bid To RA
No
Delivery Locations
1
Delivery Cities
Bhopal
Delivery Pincodes
462001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jaswant Singh Thakur | 462001,Old RTO, 1st Floor,Bhopal | Bhopal | Madhya Pradesh | 462001 | 2 | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
06-Oct-2026, 11:30 am
Opening Date
07-Oct-2026, 11:30 am
Extended Deadline
01-Oct-2026, 2:30 pm
Opening Date
02-Oct-2026, 2:30 pm
GST registration certificate
PAN card
Experience certificates for similar AIO/Laptop supply
Financial statements (last 2-3 years)
EMD/Security deposit documentation (as applicable)
Technical bid / Technical compliance certificates
OEM authorizations and declarations
Declaration letters: BOM, Drivers support, Onsite service matrix
Certificate of OEM for top IDC ranking (AIO category)
No-blacklisting certificate from Govt/Semi Govt/Educational Institutions (last 5 years)
GSTR 3B filed with bid
Any RoHS/CE/UL/FCC/TCO certificates for displays
Key insights about MADHYA PRADESH tender market
Bidders must submit OEM declarations, BOM, BOM compliance letters, and drive support declarations along with GSTR 3B. Provide RoHS/UL/CE/FCC/TCO certificates for displays, and show top IDC ranking certificate for AIO category. Ensure OEM authorization and onsite service matrix for MP.
Required documents include GST registration, PAN, last 2-3 years financial statements, experience certificates for similar supply, OEM authorization letters, BOM declaration, Windows preloads confirmation, and GSTR 3B; ensure RoHS/UL/CE/FCC/TCO certificates are attached.
Key specs include OEM-confirmed BOM, Windows OS preload, RoHS, Energy Star, UL, CE, FCC, and TCO display certifications, and top IDC ranking certificate; ensure documentation on on-site service matrix for MP and driver support from OEM site.
Delivery periods start from the last date of the original delivery order; if quantity increases by up to 25%, extended delivery time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Bidders must provide OEM confirmation for preloaded Windows operating system, along with a confirmed BOM and driver support from the OEM website; this ensures compatibility and post-sale service coverage in MP.
Certifications required include RoHS, Energy Star, UL, CE, FCC, and TCO for the display components of AIOs; provide certificates on OEM letterhead and ensure model-level compliance documentation.
OEM must be in the top 5 IDC ranking for the last 1 year in the AIO category; submit a certificate proving this ranking along with official OEM authorization and blacklist status disclosure.