CMPDI Tea Leaf Procurement Bilaspur Chhattisgarh 2026 - Delivery, GST, EMD, CMPDI

Bid Publish Date

05-Sep-2026, 12:30 pm

Bid End Date

15-Sep-2026, 1:00 pm

Value

₹88,811

Progress

Issue05-Sep-2026, 12:30 pm
AwardPending

Key Highlights

  • Delivery flexibility: 25% quantity variation during contract and currency
  • Staggered delivery: 38 units within 10 days, then 38 units monthly
  • Shelf life requirement: minimum 50% usable shelf life at supply
  • GST handling: bidder bears GST; reimbursement as actuals or applicable rate

Tender Overview

Central Mine Planning And Design Institute Limited (CMPDI) under Coal India Limited invites bids for a Tea Leaf procurement in Bilaspur, Chhattisgarh. Estimated value listed at ₹88,811.00 with an option to adjust up to ±25% of bid quantity. Delivery is staggered: an initial 38 units within 10 days of contract placement, followed by 38 units per month. Items must withstand GST considerations as applicable, with data sheets matched to technical parameters. The contract requires installation/commissioning where applicable and formal invoicing in the consignee’s name with GSTIN. Unique terms include a requirement to avoid subcontracting without prior written consent and to strictly align with the data sheet. Geographic scope is limited to CMPDI’s Songanga complex in Bilaspur (ZIP 495006). This tender emphasizes delivery scheduling flexibility, benchmark shelf-life requirements, and a fixed delivery sequence that supports phased supply.

Technical Specifications & Requirements

  • No explicit product specifications provided in the public data; bidders must upload a detailed Data Sheet aligned with offered products to enable verification against technical parameters.
  • Data Sheet mismatch triggers bid rejection; emphasis on data-sheet accuracy and compliance checked by CMPDI.
  • Staggered delivery schedule: 38 units within 10 days; 38 units each subsequent month.
  • Shelf life requirement: minimum 50% usable shelf life at the time of supply; ensure remaining shelf life meets or exceeds 50% at delivery.
  • Invoices must be issued in the consignee’s name with the consignee GSTIN.
  • GST handling is bidder’s responsibility; reimbursement as per actuals or applicable rates, capped to quoted rate.
  • Delivery and installation (if covered) to CMPDI Complex, Songanga Colony, Sarkanda, Bilaspur, CG 495006.
  • No BOQ items listed; Data Sheet alignment essential for evaluation.

Terms, Conditions & Eligibility

  • Option clause allows ±25% quantity variation at contract placement and during currency at contracted rates.
  • Delivery timeline: staggered quantity; initial 10-day burst then monthly deliveries; minimum extension logic to be applied if options exercised.
  • EMD details: not specified in data; bidders must satisfy standard EMD/secure payment norms per CMPDI terms.
  • GST compliance: bidder responsible for applicable GST; CMPDI will reimburse as per actuals or applicable rates (whichever is lower).
  • Data Sheet verification: mismatch leads to rejection; data sheet must mirror offered product specifications.
  • Payment terms: invoice in consignee name with GSTIN; no explicit payment timeline provided in data; follow CMPDI terms.
  • Sub-contracting: cannot subcontract without prior written consent.
  • Shelf life: minimum 50% usable shelf life at delivery; verify before shipment.

Key Specifications

  • Tea leaf procurement aligned with data sheet uploaded by bidder

  • Delivery: initial 38 units within 10 days; subsequent 38 units per month

  • Shelf life: minimum 50% usable shelf life on delivery

  • GST: bidder bears applicable GST; CMPDI reimbursement per actuals or applicable rates

  • Invoicing: consignee name with GSTIN on all invoices

  • No BOQ items; data sheet-driven evaluation

Terms & Conditions

  • Quantity variation up to 25% during contract at contracted rates

  • Staggered delivery schedule with monthly increments

  • Data Sheet accuracy is mandatory for bid evaluation

Important Clauses

Payment Terms

Invoice must be raised in the consignee name with GSTIN; GST handling as per actuals or applicable rate; no explicit payment timeline provided

Delivery Schedule

38 units within 10 days of contract placement; 38 units every month thereafter; option to adjust quantity during contract and currency

Penalties/Liquidated Damages

Not explicitly stated in data; standard CMPDI terms to apply if delivery/default occurs; verify in final terms

Bidder Eligibility

  • Must upload Data Sheet aligning with offered product specifications

  • Must be eligible for GST and have valid GSTIN

  • No subcontracting without prior written consent from CMPDI

Tender Data

Bid Details

Quantity

456

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

3 months

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Tea Leaf (??? ?????) (Q4)

Payment Timelines

Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

38

Delivery Locations

1

Delivery Cities

Bilaspur

Delivery Pincodes

495006

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Himanshu Vashishtha495006,REGIONAL INSTITUTE V, CENTRAL MINE PLANNING & DESIGN INSTITUTE LIMITED, SECL COMPLEX, SIPAT ROADBilaspurChhattisgarh495006-38-

Authority Records

MINISTRY OF COALCOAL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9828778.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Regional Institute 5 Cmpdi Complex Bilaspur Cg

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate (bidders)

2

PAN card copy

3

GSTIN copy

4

Cancelled cheque copy

5

EFT mandate certified by bank

6

Data Sheet of offered product(s)

7

Experience certificates (if any in tea leaf procurement)

8

OEM authorization or vendor authorization (if applicable)

9

Financial statements (as required by CMPDI terms)

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for CMPDI tea leaf tender in Bilaspur 2026?

Bidders must submit the Data Sheet for offered tea leaf, GSTIN, PAN, cancelled cheque, and EFT mandate. Ensure staggered delivery (38 units in 10 days, then 38 monthly) and conformance with shelf life of ≥50%. Invoices must be in the consignee name with GSTIN; avoid subcontracting without consent.

What documents are required for CMPDI tea leaf procurement in Bilaspur?

Required documents include GST registration, PAN, GSTIN copy, cancelled cheque, EFT mandate, Data Sheet, and any OEM authorizations if applicable. Experience certificates and financial statements may be requested. Ensure data sheet consistency with product specifications to avoid rejection.

What are the delivery terms for CMPDI tea leaf tender 2026?

Delivery begins with 38 units within 10 days of contract placement, followed by 38 units per month. Quantity variations up to 25% are allowed during contract and currency at contracted rates. Installations, if covered, are at CMPDI Songanga Complex, Bilaspur.

What are GST implications for CMPDI tea leaf supply contract?

Bidder bears GST applicability; CMPDI reimburses actual GST or applicable rate, whichever is lower, on the quoted value. Invoice must reflect consignee GSTIN and be issued in consignee name.

What is the shelf life requirement for CMPDI tea leaf supply?

Deliveries must have a minimum usable shelf life of 50% at the time of supply; confirm remaining shelf life balance to ensure eligibility and avoid rejection during inspection.

How to handle data sheet mismatches for CMPDI tender in Bilaspur?

Upload a Data Sheet precisely matching offered product specifications; CMPDI will reject bids with unexplained mismatches. Ensure all technical parameters, grade, moisture, and packaging details align with data sheet.

What is the eligibility criteria for tea leaf procurement CMPDI Bilaspur?

Provide valid GST registration, PAN, data-sheet-aligned product details, and EFT bank mandate. Ensure no subcontracting without buyer consent; demonstrate ability to comply with staggered delivery and shelf-life requirements.

What is the estimated value and delivery region for CMPDI tender 2026?

Estimated value is ₹88,811.00; procurement located at CMPDI Complex, Songanga Colony, Near Science College Ground, Seepat Road, Sarkanda, Bilaspur, CG 495006. Delivery must occur to the consignee address with GSTIN compliance.