Progress
Quantity
3
Bid Type
Two Packet Bid
The Directorate Of Municipal Administration under the Urban Development Department Karnataka invites bids for a Hopper Tipper Dumper for Garbage to be supplied, installed, tested and commissioned at Bellary, Karnataka 583101. The procurement involves a single project scope with an EMD of ₹77,940 and a bidder turnover gatekeeping criterion in line with the contract. The buyer reserves a ±25% quantity option during and after award, with delivery periods recalculated accordingly. A key differentiator is the requirement to submit Detailed Design Drawings within 5 days of award, followed by buyer approval or modification lists within 5 days, before fabrication begins. The project emphasizes compliance with OEM authorization, and a robust after-sales support framework through in-country service, including warranty and potential supply chain contingencies.
Hopper Tipper Dumper for Garbage with specified tipping angle
Container capacity in cubic metres
Body plate thickness in mm and sub-frame thickness in mm
Container material and base vehicle category
Chassis load carrying capacity (Kg)
Fuel type and axle configuration
Max engine power (kW) and emission compliance
Driver cabin AC and seating capacity
OEM authorization for body builders and required certifications
Quantity variation up to 25% with contract rate protection
5-day window for design drawings submission and 5-day approval/modification response
2-year warranty and post-installation support expectations
OEM/Authorized Seller must have India-based after-sales presence
Turnover evidence required; age of company considered for turnover criteria
Scope includes supply, installation, testing, commissioning
Not specified beyond EMD amount; payment terms linked to acceptance and commissioning as per tender terms
Delivery period adjustable based on option clause; extended time proportionate to quantity change with a minimum 30 days
LD terms not detailed; delivery delays linked to approval timelines and revised delivery schedule
Turnover evidence for last 3 years as per bid document
ISO/IS 550 or relevant emission compliance standard alignment is implied by base vehicle parameters
OEM authorization for body builders or direct OEM presence in India
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Hopper Tipper Dumper for Garbage (Q2)
Advisory Bank
HDFC Bank
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Vijaynagar
Delivery Pincodes
583135
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ramesha U | 583135,Town Panchayath Kudligi Gudekote Road, Kudligi, Bellary Dist Karnataka - 583135 | Vijaynagar | Karnataka | 583135 | 3 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Tipper Parameters | Type of Tipper | Box Body Tipper, Open Type Tipper |
| Tipper Parameters | Tipping Angle (Degree) | 45.0 Or higher |
| Tipper Parameters | Tipper Container Capacity/Volume (cubic metres) | 3.0 - 8.0 Or higher |
| Tipper Parameters | Body Plate Thickness (mm) | 1.6 - 6.0 Or higher |
| Tipper Parameters | Tipper Sub Frame Thickness (mm) | 3.0 - 8.0 Or higher |
| Tipper Parameters | Tipper Container Material | Mild Steel as per IS 2062, Stainless Steel Or higher |
| Base Vehicle Parameters | Vehicle Category | N1 (GVW <=3.5 tonnes) |
| Base Vehicle Parameters | Chassis Load Carrying Capacity (Kg) (Fabricated Body + Weight of Materials to be Carried) | 1377.0 - 10000.0 Or higher |
| Base Vehicle Parameters | Type of Fuel | Diesel |
| Base Vehicle Parameters | Axle Configuration | 4 X 2, 4 X 4 |
| Base Vehicle Parameters | Maximum Engine Output / Power (kW) at rated RPM | 51.45 - 150.0 Or higher |
| Base Vehicle Parameters | Vehicle Emission Compliance | BS VI |
| Base Vehicle Parameters | Vehicle Air Intake System | Turbocharged Intercooled Or higher |
| Base Vehicle Parameters | Air Conditioning in Driver Cabin | No |
| Base Vehicle Parameters | Seating Capacity in the cabin (Including driver) | 2, 3, 4 Or higher |
| Certification Parameters | Certification Type | Chassis Certification along with Form 22 Or higher |
| Certification Parameters | Availability of Chassis / Original Vehicle Manufacturer's authorization in case of Body Builders | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate showing turnover for last 3 years
EMD submission proof ( ₹77,940 )
Technical bid documents and drawings
OEM authorization or dealer/distributor authorization for body builders
Evidence of compliance with emission, fuel type, and chassis requirements
Any prior similar project performance certificates
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, turnover certificates for last 3 years, EMD ₹77,940, and technical drawings within 5 days of award. Ensure OEM authorization for body builders, compliance with base vehicle specs, and detailed design approval before fabrication.
Submit GST certificate, PAN, audited financials or CA certificate showing turnover, EMD receipt, technical bid with drawings, OEM authorization, proof of after-sales support in India, and prior project certificates demonstrating similar dump truck supply experience.
Key specs include tipping angle, container capacity in cubic metres, body plate thickness, sub-frame thickness, container material, vehicle category, chassis load capacity, fuel type, axle configuration, max engine power in kW, and emission compliance with suitable air intake and driver cabin AC.
EMD is ₹77,940. Payment terms are tied to acceptance and commissioning; ensure submission of EMD proof with bid and note any subsequent payment milestones linked to delivery and commissioning as per buyer terms.
Within 5 days of award, submit Detailed Design Drawings for buyer approval; if modifications are required, provide a modification list within 5 days; any delay may trigger recalculation of delivery schedule.
A minimum 2-year warranty from final acceptance or after installation/commissioning is expected; OEM/Authorized Seller must have India-based after-sales service; service and spare parts availability should be demonstrated.
Bid price must cover Supply, Installation, Testing, and Commissioning (SITC) of the hopper tipper dumper and any required site adaptations; ensure compliance with emission, chassis, and container material specs.
The purchaser may increase or decrease quantity up to 25% of the bid quantity at contract placement or during the currency of the contract; delivery calculations adjust proportionally with a minimum of 30 days.
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS