Rural Development Department Bihar High Mast Lighting Tower with LED Flood Lighting System Tender 2026

Bid Publish Date

08-Sep-2026, 8:35 pm

Bid End Date

18-Sep-2026, 9:00 pm

Progress

Issue08-Sep-2026, 8:35 pm
AwardPending

Key Highlights

  • Dedicated/toll-free service support number required
  • Escalation matrix for service support mandatory
  • Option clause allows +/-25% quantity adjustment at contract rates
  • Functional Service Centre must exist in each consignee state or be established within 30 days

Tender Overview

The Rural Development Department of Bihar invites bids for a High Mast Lighting Tower system with LED Flood Lighting designed for large-area illumination in Samastipur, Bihar. The procurement scope references a configurable quantity under an option clause allowing +/-25% adjustments at contracted rates. Bidders must satisfy service-center presence requirements within the state, including post-award establishment within 30 days if not existing. The ATC terms mandate a dedicated toll-free service line and an escalation matrix, ensuring robust after-sales support across the state. The opportunity emphasizes field service readiness and responsive maintenance infrastructure.

Technical Specifications & Requirements

  • Product: High Mast Lighting Tower with LED Flood Lighting System for large outdoor areas
  • Requirements extracted from terms: functional service centers in the state of each consignee location (30 days to establish if absent); dedicated toll-free service number; escalation matrix for service support; option to increase quantity up to 25% during contract; delivery timeline calculated as (increase in quantity / original quantity) × original delivery period with minimum 30 days; bidders must not be under liquidation or bankruptcy; delivery/delivery terms to be confirmed with award.
  • No explicit performance specs provided; emphasis on serviceability, warranty provisioning, and scalable quantity handling.

Terms, Conditions & Eligibility

  • Right to modify quantity by up to 25% during and after award; delivery period scales with quantity changes; minimum 30 days extension rule.
  • Bidder not in liquidation or bankruptcy; submission of undertaking to this effect.
  • Functional Service Centre in each consignee state or establishment within 30 days of award; evidence required before payment release.
  • Dedicated toll-free service number and escalation matrix required; ATC documents to be viewed by bidders.
  • No BOQ items listed; no listed start/end dates; procurement appears focused on serviceability and scalable supply.

Key Specifications

    • Product/service: High Mast Lighting Tower with LED Flood Lighting System for large outdoor areas
    • Key capabilities: scalable quantity handling (up to 25% variation), service-center coverage in state, dedicated toll-free support
    • Compliance notes: evidence of functional service centers; escalation matrix; ATC viewable by bidders

Terms & Conditions

  • Option to increase quantity by 25% during or after contract with proportional delivery extension

  • Must have a functional Service Centre in each consignee state or establish within 30 days

  • Dedicated toll-free service line and escalation matrix required for service support

Important Clauses

Payment Terms

Payment release contingent on evidence of functional service center and service support readiness; details not specified in tender text

Delivery Schedule

Delivery period scales with quantity changes; minimum 30 days extension; base period defined by original delivery order date

Penalties/Liquidated Damages

Not explicitly stated in tender; escalation and ATC documents may define penalties or LDs

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Demonstrated capability to supply high mast lighting towers with LED systems

  • Presence of or ability to establish State-based service centers within 30 days of award

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Samastipur

Delivery Pincodes

848117

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Navin Kumar Thakur848117,gram panchayat raj shripurgahar westSamastipurBihar848117115-

Authority Records

RURAL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9866188.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Block Office Khanpur Samastipur

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar high-mmast lighting or LED lighting projects

4

Financial statements (audited, if available)

5

EMD documentation (as applicable by buyer terms)

6

Technical bid documents and compliance certificates

7

OEM authorization or sole distributor certificate

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for the high mast lighting tender in Samastipur Bihar 2026

Bidders should submit a complete bid with company credentials, GST and PAN, financials, and experience certificates for similar LED lighting projects. Ensure a dedicated service center in Bihar or a plan to establish within 30 days of award, plus an OEM authorization if required. Include documentation for EMD as applicable.

What documents are required for the Bihar lighting tender submission

Required documents include GST certificate, PAN card, audited financial statements, experience certificates for similar projects, OEM authorizations, and technical bid documents. Ensure proof of service capability in Bihar, and an undertaking if the bidder is under any financial distress as per ATC terms.

What are the service center requirements for this Bihar procurement

Bidders must have a functional service center in the state of each consignee location or establish one within 30 days of award. Payment release is contingent on documentary evidence of establishing the center. A dedicated toll-free number and escalation matrix are mandatory for after-sales support.

What are the quantity adjustment terms for this tender in Bihar

The purchaser reserves the right to increase or decrease the quantity up to 25% of bid quantity at contract placement and during currency at contracted rates. Delivery calculations follow (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension.

What is required to prove financial stability for this bid in Bihar

Bidders must upload an undertaking confirming they are not in liquidation or bankruptcy. Financial stability evidence should be provided via financial statements and any available creditworthiness documentation as part of the bid package.

How will service support be structured for this Bihar LED project

A dedicated toll-free support line and an Escalation Matrix must be provided by the bidder/OEM. Service centers must be functional in Bihar, with evidence submitted prior to payment release; ATC terms define the exact support process.

When is delivery and installation expected for the Bihar high mast project

Delivery timeline depends on the original delivery order and any quantity changes. The minimum extension for any increased quantity is 30 days beyond the original delivery period; exact dates will be specified in the award and delivery order.