Progress
N/a has released a public tender for Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) in LATEHAR, JHARKHAND. Quantity: 6. Submission Deadline: 20-06-2025 14: 00: 00. Download documents and apply online.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AARADHAYA ENTERPRISES Under PMA | Make : NA Model : NA | 19-06-2025 14:01:29 | |
| 2 | DASHADHAYANA PROJECTS PRIVATE LIMITED Under PMA | Make : NA Model : NA | 20-06-2025 11:53:37 | |
| 3 | M/S G.S. CONSTRUCTION Under PMA | Make : NA Model : NA | 19-06-2025 15:59:38 | |
| 4 | Tulsyan Enterprises Under PMA | Make : NA Model : NA | 19-06-2025 20:22:08 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | AARADHAYA ENTERPRISES Under PMA | Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2),Off - Grid Solar Photovoltaic (PV) Power Plant | |
| L2 | M/S G.S. CONSTRUCTION Under PMA | Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2),Off - Grid Solar Photovoltaic (PV) Power Plant | |
| L3 | Tulsyan Enterprises Under PMA | Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2),Off - Grid Solar Photovoltaic (PV) Power Plant | |
| L4 | DASHADHAYANA PROJECTS PRIVATE LIMITED Under PMA | Item Categories : Off - Grid Solar Photovoltaic (PV) Power Plant (V2),Off - Grid Solar Photovoltaic (PV) Power Plant |
Please sign in or create an account to view contract details and download result documents.
Quantity
6
Category
Off - Grid Solar Photovoltaic (PV) Power Plant (V2)
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Startup Exemption (Experience)
Yes
Min. Avg. Annual Turnover
1000
OEM Avg. Turnover
1000
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about JHARKHAND tender market
The eligibility requirements include being a registered entity capable of demonstrating relevant experience in solar projects. Bidders must have the necessary licenses, certifications, and technical competence for implementing Off-Grid Solar Photovoltaic (PV) Power Plants. Furthermore, financial stability and prior performance in similar projects may also be part of the evaluation criteria.
Bidders must comply with detailed technical specifications outlined in the tender documents. This includes adherence to industry standards for solar energy systems, capabilities for grid independence, and the use of advanced monitoring and control technologies for efficiency and reliability.
An Earnest Money Deposit (EMD) is required from bidders to demonstrate their commitment to the tender process. The value of the EMD will be specified in the tender documents and must be submitted alongside the proposal. This deposit is typically refundable after the completion of the tender evaluation process.
The submission of documents must be conducted electronically through the specified tender platform before the deadline mentioned in the tender documentation. Bidders must ensure that all required documents are compiled accurately and meet the format specified in the guidelines.
Yes, this tender includes provisions for Micro, Small, and Medium Enterprises (MSEs) and startups. These enterprises may receive special considerations or incentives, thus encouraging their participation. This alignment supports local manufacturing initiatives and aims to boost the overall renewable energy sector in accordance with government policies.