Progress
N/a invites bids for Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) in MALAPPURAM, KERALA. Quantity: 9. Submission Deadline: 27-10-2025 16: 00: 00. Submit your proposal before the deadline.
Quantity
9
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
14
Past Performance
80 %
Experience Required
3 Year (s)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
27-Oct-2025, 10:30 am
Opening Date
27-Oct-2025, 11:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Rating (in KVA) | 3 |
| Performance Parameters | Input Voltage (AC, 50 Hz) | Single Phase, 160V - 260V |
| Performance Parameters | Output Voltage (AC, 50 Hz) | Single Phase, 230V±1%, |
| Construction | Availability of Inbuilt Isolation Transformer | No |
| Construction | Overall Efficiency (in %) | 90% - 94% |
| Construction | Minimum Overload Capacity of Online UPS | 120% of Rating in KVA for 10 minutes |
| Battery/Backup Bank | Type of Battery | SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries |
| Battery/Backup Bank | Backup Time | 60.0 |
| Features | Type of Mounting of Online UPS | Floor Standing |