Bid Publish Date
30-Sep-2026, 7:07 pm
Bid End Date
10-Oct-2026, 8:00 pm
EMD
₹53,000
Location
Progress
The opportunity is issued by the Tribal Development Department, Government of Maharashtra, for the design, installation and maintenance of an Educational Lab/Centre and for supplying modular furniture to a Government Tribal Boys Hostel at Keli Rumhanwadi, Akole, in Ahmednagar district, with location in Nashik 422001. The Infrastructure scope includes furniture supply and related services, with a stated EMD of ₹53,000 and a potential 25% adjustment in contract quantity or duration. Bidders must ensure an in-state service presence and provide a formal DD-based EMD option if required. Unique aspects include mandatory service support channels and escalation procedures, plus documentation submission and delivery of physical copies within 5 days post bid end. This tender emphasizes local service capability and compliant documentation.
Product/service names: modular furniture supply, educational lab/centre design, installation and maintenance
Quantities: not explicitly itemized in BOQ (0 items); scope inferred as furniture and related services
EMD amount: ₹53,000
Experience: prior experience in similar government hostel furniture/design projects recommended
Quality/standards: IS or BIS certifications not specified; request explicit standards during bid
Delivery: hardcopy documents to be delivered within 5 days after bid end/opening
Warranty/AMC: not specified; bidders to clarify post-implementation support in bid
25% contract quantity/duration variation permitted at bid issue and post-issue
Office of service provider must be located in the consignee state and provide documentary evidence
Dedicated toll-free service number and escalation matrix required
Upload all required certificates; failure may lead to rejection
EMD ₹53,000 via DD or online to Nashik authority; hard copy delivery within 5 days
EMD ₹53,000 via DD or online; DD payable to Executive Engineer P W Tribal Division Nashik; hard copy required within 5 days post bid end
Hard copies of submission documents must be delivered within 5 days after bid end/opening; service support details to be provided by bidder
Not explicitly specified; buyers may apply standard penalties per contract terms; confirm during bid submission
Service provider must have an in-state office within Maharashtra
Dedicated toll-free service support and escalation matrix to be provided
Submit all required certificates as per ATC and Corrigendum
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
2 Days
EMD Required
Yes
MII Compliance
Yes
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
50
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Design Installation and Maintenance of Educational Lab/Centre - Education Centre; Providing and Supplying Moduler Furniture For Government Tribal Boys Hostel Building At Keli Rumhanwadi Tal Akole Dist Ahmednagar; Buyer
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Nashik
Delivery Pincodes
422003
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kiran Uttam Ghuge | 422003,Executive Engineer, P. W. (Tribal) Division, Nashik Building No. A-3, Opp. PRTC, Tribal Colony, Near RTO Office, Peth Raod, Nashik | Nashik | Maharashtra | 422003 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST Registration Certificate
Permanent Account Number (PAN)
EMD payment proof (DD copy or online remittance receipt)
Technical bid documents and drawings (if applicable)
OEM authorization or dealership certificate (if applicable)
Experience certificates showing relevant projects
Financial statements or turnover proof
Certificate of incorporation and company details
Any certificates requested in ATC and Corrigendum
Key insights about MAHARASHTRA tender market
Bidders should prepare EMD of ₹53,000 via DD to Executive Engineer P W Tribal Division Nashik or online as specified, provide GST/PAN, experience certs, and OEM/authorization if applicable, and ensure Maharashtra-based service presence. Upload all required certificates per ATC and deliver hard copies within 5 days post bid end.
Submit GST registration, PAN, EMD proof, technical bid documents, experience certificates for similar projects, financial statements, company incorporation details, OEM authorizations if needed, and any certificates specified in ATC/Corrigendum before bid submission.
Provide a dedicated toll-free service number and an escalation matrix; ensure an in-state service office in Maharashtra; delivery of hard copies within 5 days after bid end; clarify post-implementation maintenance terms during bid stage.
EMD is ₹53,000. Payment terms require DD or online remittance to Nashik’s Executive Engineer P W Tribal Division; ensure DD copy is uploaded and hard copy delivered within the 5-day window after bid end.
Tender requires certificates as per ATC; while specific standards aren’t listed, bidders should confirm ISI/BIS or ISO compliance during bid submission and provide OEM authorizations if required.
Submit all digital certificates via the portal and deliver hard copies to the same Nashik office within 5 days of bid end/opening; ensure inclusion of all certificates per ATC and Corrigendum for acceptance.
Bidders should plan for potential up to 25% scope/duration change, verify with the purchaser during contract finalization, and align pricing and delivery plans to accommodate adjustments without compromising quality.