Progress
Quantity
11
The Indian Army, Department Of Military Affairs, seeks supply, installation, testing and commissioning of multiple front body parts including Side Moulding RR LH, Side Moulding RR RH, Absorber Front Bumper, Air Intake Hose, Brackets for Front Bumper (LH/RH), Front Door Primary Seals (LH/RH), Gasket Elbow to Bypass, Assy Water Valve, and Coolant Pipe Hose. The scope includes operator training and statutory clearances where applicable, with an estimated contract value not disclosed. A key differentiator is the option to increase quantity by up to 25% at contracted rates, with delivery extensions calculated per a defined formula.
Product names: Side Moulding RR LH, Side Moulding RR RH, Absorber Front Bumper, Air Intake Hose
Additional items: Bracket Front Bumper Mtg LH, Bracket Front Bumper Mtg RH, Front Door Primary Seal LH, Front Door Primary Seal RH
Gasket Elbow to Bypass, Assy Water Valve, Coolant Pipe Hose
Scope includes supply, installation, testing, commissioning and operator training
Warranty: 1 year; OEM warranty certificates required at delivery
EMD details not explicitly provided; submission requires PAN, GSTIN, cancelled cheque and EFT mandate
Quantity flexibility up to 25% during contract with extended delivery time calculated per formula
Turnover verification required for last 3 years; 3-year average turnover criterion stated
Delivery, installation and commissioning included; payment terms governed by contract; option for quantity variation up to 25% with corresponding delivery extension rules
Delivery period starts after last date of original delivery order; extended period follows option clause with duration calculated as (Increase quantity / Original quantity) × Original delivery period, minimum 30 days
Penalties not explicitly stated in summary; extension rules apply for quantity changes; potential penalties to be defined in formal contract
3-year average annual turnover criterion evidenced by audited statements or CA certificate
Compliance with bank EFT mandate, PAN, GSTIN, and KYC-like documentation
Established SITC capability with regional service centers in India
Tender Category
Goods
Bid To RA
No
Item Category
Side Moulding RR LH , Side Moulding RR RH , Absorber Front Bumper , Air Intake Hose , Bracket Front Bumper Mtg LH , Bracket Front Bumper Mtg RH , Front Door Primary Seal LH , Front Door Primary Seal RH , Gasket Elbow to Bypass , Assy Water Valve , Coolant Pipe Hose
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Side Moulding RR LH
Safari
Side Moulding RR RH
Safari
Absorber Front Bumper
Safari
Air Intake Hose
Safari
Bracket Front Bumper Mtg LH
Safari
Bracket Front Bumper Mtg RH
Safari
Front Door Primary Seal LH
Safari
Front Door Primary Seal RH
Safari
Gasket Elbow to Bypass
Safari
Assy Water Valve
Safari
Coolant Pipe Hose
Safari
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Side Moulding RR LH | Safari | 1 | nos | 7011281 | 15 | |
| 2 | Side Moulding RR RH | Safari | 1 | nos | 7011281 | 15 | |
| 3 | Absorber Front Bumper | Safari | 1 | nos | 7011281 | 15 | |
| 4 | Air Intake Hose | Safari | 1 | nos | 7011281 | 15 | |
| 5 | Bracket Front Bumper Mtg LH | Safari | 1 | nos | 7011281 | 15 | |
| 6 | Bracket Front Bumper Mtg RH | Safari | 1 | nos | 7011281 | 15 | |
| 7 | Front Door Primary Seal LH | Safari | 1 | nos | 7011281 | 15 | |
| 8 | Front Door Primary Seal RH | Safari | 1 | nos | 7011281 | 15 | |
| 9 | Gasket Elbow to Bypass | Safari | 1 | nos | 7011281 | 15 | |
| 10 | Assy Water Valve | Safari | 1 | nos | 7011281 | 15 | |
| 11 | Coolant Pipe Hose | Safari | 1 | nos | 7011281 | 15 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by Bank
Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization and warranty certificates
Evidence of installation/commissioning capability and service centers
Any statutory clearances if applicable
Extended Deadline
13-Nov-2025, 9:00 am
Opening Date
13-Nov-2025, 9:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | EVERSHINE ENTERPRISES Under PMA | - | 12-11-2025 09:50:55 | |
| 2 | FRIENDS ENTERPRISES Under PMA | - | 09-11-2025 21:06:43 | |
| 3 | National Auto Spares Under PMA | - | 09-11-2025 21:42:40 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | EVERSHINE ENTERPRISES(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Side Moulding RR LH,Side Moulding RR RH,Absorber Front Bumper,Air Intake Hose,Bracket Front Bumper | |
| L2 | FRIENDS ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Side Moulding RR LH,Side Moulding RR RH,Absorber Front Bumper,Air Intake Hose,Bracket Front Bumper | |
| L3 | National Auto Spares (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Side Moulding RR LH,Side Moulding RR RH,Absorber Front Bumper,Air Intake Hose,Bracket Front Bumper |
Key insights about PUNJAB tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide turnover evidence for the last 3 years; include OEM warranties and service center details; comply with SITC scope and option clause for 25% quantity changes; ensure 1-year warranty from acceptance.
Required documents include PAN Card, GSTIN, Cancelled cheque, EFT Mandate, turnover certificates (audited or CA), OEM authorizations, and OEM warranty certificates; service center details and installation capabilities must be demonstrated.
Warranty spans 1 year from final acceptance or post-installation testing, with OEM warranty certificates submitted at delivery; seller must ensure rectification during the warranty window and provide service centers nationwide.
Contract allows up to 25% increase in order quantity during the currency period, at the contracted rates; delivery time extensions are calculated as (Increase quantity / Original quantity) × Original delivery period with a minimum of 30 days.
Suppliers must provide OEM warranties and show after-sales capability; financial turnover verification is required; no explicit ISI/ISO standard is listed in the summary, but OEM alignment and warranty terms are mandatory.
Scope includes supply, installation, testing, commissioning of 11 identified front body parts, operator training, and providing statutory clearances if any; ensure SITC readiness and post-installation support across India.
Delivery extension starts after the last date of the extended delivery period; additional time equals (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
Submit certified Audited Balance Sheets for the last 3 years, or a CA/Cost Accountant certificate indicating turnover; if company is younger than 3 years, use completed years after incorporation to compute average turnover.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS