TenderDekho Logo
Active GEM

Contract Bidding Open For Display 65,Display 75,Display 98,VC Device with Table Microphones Medium Room,VC Device with 6 Tabl in MUMBAI, MAHARASHTRA

Bid Publish Date

01-Aug-2026, 2:33 pm

Bid End Date

17-Aug-2026, 2:00 pm

EMD

₹1,25,000

Location

MUMBAI , MAHARASHTRA

Progress

Issue01-Aug-2026, 2:33 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

47

Category

VC Device with Table Microphones Medium Room

Bid Type

Two Packet Bid

Categories 11

State Bank Of India (sbi) announces a tender for Display 65, Display 75, Display 98, VC Device with Table Microphones Medium Room, VC Device with 6 Table Microphones Large Room, Cloud VC, Power Amplifier, Speakers, L1 Engineer, Support Pack, Cable and Connectors, Programming, Installation, speaker in MUMBAI, MAHARASHTRA. Quantity: 47. Submission Deadline: 17-08-2026 14: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Display 65 , Display 75 , Display 98 , VC Device with Table Microphones Medium Room , VC Device with 6 Table Microphones Large Room , Cloud VC , Power Amplifier , Speakers , L1 Engineer , Support Pack , Cable and Connectors , Programming , Installation , speaker

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Mumbai

Delivery Pincodes

400021

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ravindra Krishna Garud400021,State Bank Bhavan Madam Cama road Nariman pointMumbaiMaharashtra400021260-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENTSTATE BANK OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9695283.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 22 Items Sign in for GEM prices

#1

Display 65

SITC of Display as per Technical Specifications

2 nos Delivery: 60 days
#2

Display 75

SITC of Display as per Technical Specifications

3 nos Delivery: 60 days
#3

Display 98

SITC of Display as per Technical Specifications

1 nos Delivery: 60 days
#4

VC Device with Table Microphones Medium Room

SITC of VC Endpoints as per Technical Specifications

3 nos Delivery: 60 days
#5

VC Device with 6 Table Microphones Large Room

SITC of VC Endpoints as per Technical Specifications

1 nos Delivery: 60 days
#6

Cloud VC

SITC of Cloud registration license Subscription for 60 M

4 nos Delivery: 60 days
#7

Power Amplifier

SITC of Amplifier as per Technical Specifications

4 nos Delivery: 60 days
#8

Speakers

SITC of Speaker as per Technical Specifications

14 nos Delivery: 60 days
#9

L1 Engineer

SITC of VCSI

1 nos Delivery: 60 days
#10

Support Pack

SITC of 8x5 NBD Support

1 nos Delivery: 60 days
#11

Cable and Connectors

SITC of Cable and Connectors

1 nos Delivery: 60 days
#12

Programming

SITC of Programming Charges

1 nos Delivery: 60 days
#13

Installation

SITC of One-time installation and user training charges

1 nos Delivery: 60 days
#14

Display 75

SITC of Display as per Technical Specifications

1 nos Delivery: 60 days
#15

VC Device with Table Microphones Medium Room

SITC of VC Endpoints as per Technical Specifications

1 nos Delivery: 60 days
#16

Cloud VC

SITC of Cloud registration license Subscription for 60 M

1 nos Delivery: 60 days
#17

Power Amplifier

SITC of Amplifier as per Technical Specifications

1 nos Delivery: 60 days
#18

speaker

SITC of Speaker as per Technical Specifications

2 nos Delivery: 60 days
#19

Support Pack

SITC of 8x5 NBD Support

1 nos Delivery: 60 days
#20

Cable and Connectors

SITC of Cable and Connectors

1 nos Delivery: 60 days
#21

Programming

SITC of Programming Charges

1 nos Delivery: 60 days
#22

Installation

SITC of One-time installation and user training charges

1 nos Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer