Progress
RAThe Indian Army, Department Of Military Affairs, invites bids for a comprehensive lighting and electrical package in AMBALA, HARYANA. The procurement covers a High Mast Pole 16 Mtr with Rope and Pulley, LED Flood Light 200W, Junction Box with MCB, Invertor 200 VA with Battery Bank, Control Panel, Cabling and Accessories, Earthing System, Lightning Arrester, and full Installation, Testing and Commissioning. Estimated value is ₹500,000. The scope emphasizes OEM or OEM-certified installation capability and end-to-end deployment, including testing and commissioning by qualified personnel. The option clause allows quantity adjustments up to ±25% during or after contract award, with delivery periods recalculated accordingly. This tender requires strict data-sheet alignment and adherence to the buyer’s data sheet to avoid rejection. Unique aspects include the emphasis on Malicious Code Certificate, OEM authorization, and End User Certificate handling as per buyer formats. This opportunity targets suppliers with proven hardware deployment experience for security-focused infrastructure in defense sectors and a capability to perform installation and training when applicable. The procurement is location-specific to AMBALA and seeks a turnkey lighting solution with rigorous documentation and after-sales commitments.
Option clause allows ±25% quantity change with adjusted delivery period
Data sheet alignment required; mismatches may lead to rejection
OEM authorization and End User Certificate mandated
Malicious Code Certificate to be uploaded with bid
Installation by OEM-certified personnel only
GSTIN, PAN, cancelled cheque, EFT mandate required
Not explicitly specified; bidders should prepare for standard government payment after acceptance and delivery.
Delivery period commences from the last date of original delivery order; additional time proportional to quantity variation, minimum 30 days.
Not specified; bidders should assume standard LDs for late delivery in defense tenders and seek clarity.
Not under liquidation, court receivership, or similar proceedings
Must provide undertaking confirming financial stability
OEM authorization or OEM-certified installation capability
Start
01-Sep-2026, 7:00 pm
End
02-Sep-2026, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
14
Category
High Mast Pole 16 Mtr with Rope and Pulley
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
High Mast Pole 16 Mtr with Rope and Pulley , LED Flood Light 200W , Junction Box with MCB , Invertor 200 VA with Bty bank , Control Panel, Cabling and Accessories , Earthing System , Lightning Arrester , Installation, Testing and Commissioning
Pre-Bid Date
18-08-2026 14:00:00
Pre-Bid Venue
40 Arty Div Sig Regt (AREN), Ambala Cantt Haryana 133001
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
High Mast Pole 16 Mtr with Rope and Pulley
High Mast Pole 16 Mtr with Rope and Pully
LED Flood Light 200W
LED Flood Light 200W
Junction Box with MCB
Junction Box with MCB
Invertor 200 VA with Bty bank
Invertor 200 VA with Bty bank
Control Panel, Cabling and Accessories
Control Panel, Cabling and Accessories
Earthing System
Earthing System
Lightning Arrester
Lightning Arrester
Installation, Testing and Commissioning
Installation, Testing & Commissioning
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | High Mast Pole 16 Mtr with Rope and Pulley | High Mast Pole 16 Mtr with Rope and Pully | 1 | set | kamble@2020 | 90 | |
| 2 | LED Flood Light 200W | LED Flood Light 200W | 6 | nos | kamble@2020 | 90 | |
| 3 | Junction Box with MCB | Junction Box with MCB | 1 | set | kamble@2020 | 90 | |
| 4 | Invertor 200 VA with Bty bank | Invertor 200 VA with Bty bank | 1 | set | kamble@2020 | 90 | |
| 5 | Control Panel, Cabling and Accessories | Control Panel, Cabling and Accessories | 1 | nos | kamble@2020 | 90 | |
| 6 | Earthing System | Earthing System | 2 | nos | kamble@2020 | 90 | |
| 7 | Lightning Arrester | Lightning Arrester | 1 | nos | kamble@2020 | 90 | |
| 8 | Installation, Testing and Commissioning | Installation, Testing & Commissioning | 1 | job | kamble@2020 | 90 |
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered product(s)
End User Certificate (Buyer format)
Manufacturer Authorization (for OEM/Reseller)
Malicious Code Certificate
Key insights about HARYANA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT Mandate, data sheet of offered products, End User Certificate in the buyer format, and Manufacturer Authorization if not OEM directly. Ensure Malicious Code Certificate is uploaded and data sheet matches the offered model to avoid rejection.
The purchaser may vary quantity up to ±25% of the bid quantity at contract award and during the contract currency. Delivery time is recalculated based on the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Installation, commissioning, testing, and training must be performed by OEM or OEM-certified resources or OEM-authorized resellers. The bidder must provide documentation confirming authorized installation capability and ensure data-sheet alignment with the offered product.
Bids must include End User Certificate in the buyer format and a Malicious Code Certificate. A Manufacturer Authorization may be required if the vendor is not the OEM, ensuring compliance with security and quality standards.
The scope encompasses a 16 m high mast with rope/pulley, 200W LED flood lights, junction boxes with MCB, 200 VA inverter with battery bank, control panel, cabling, earthing, lightning arrester, plus installation and commissioning services.
Data sheets must precisely match the offered hardware specifications. Any unexplained mismatch can lead to bid rejection, so verify model numbers, capacity, voltage, and warranty terms before submission.
If the bidder is not the OEM, an OEM Authorization is required to prove authorized supply and installation capability. This ensures proper warranty support, service, and compliance with defense procurement norms.
The tender text does not specify an explicit deadline; bidders should monitor the procurement portal for release notices and ensure submission with all mandatory documents, data sheets, and certificates before the stated closing date.