Operation and Maintenance Services of Power Generator(DG-Set) - Package 1 - O&M Service with opera
Indian Institute Of Information Technology (iiit)
NAGPUR, MAHARASHTRA
A tender has been published for Employees State Insurance Corporation (esic) ARM 1, ARM 2, ARM 3, ARM 4, ARMO, DG set maintenance in KAMRUP, ASSAM. Quantity: 6 by. Submission Deadline: 09-03-2026 19: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Institute Of Information Technology (iiit)
NAGPUR, MAHARASHTRA
Indo Tibetan Border Police (itbp)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Doordarshan
CENTRAL DELHI, DELHI
Central Coalfields Limited
CHATRA, JHARKHAND
National Institute Of Technology (nit)
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ARM 1 | ARM work (Electrical)- Material part (As per the detailed BOQ placed at Annexure I of the Scope of work document) | 1 | lot | cons-manish | 365 |
| 2 | ARM 2 | ARM work (Electrical)- S and F item (As per the detailed BOQ placed at Annexure II of the Scope of work document) | 1 | lot | cons-manish | 365 |
| 3 | ARM 3 | ARM work (Civil)- Material part (As per the detailed BOQ placed at Annexure III of the Scope of work document) | 1 | lot | cons-manish | 365 |
| 4 | ARM 4 | ARM work (Civil)- S and F item (As per the detailed BOQ placed at Annexure IV of the Scope of work document) | 1 | lot | cons-manish | 365 |
| 5 | ARMO | Operation Manpower for ARMO works (As per the detailed BOQ placed at Annexure V of the Scope of work document), to be quoted as per latest CLC rates in force including contractor overhead, as illustrated at Wage calculation sheet. | 1 | lot | cons-manish | 365 |
| 6 | DG set maintenance | AMC of DG sets with Quarterly maintenace as per the Scopw of work enclosed with the Bid document placed at Annexure VI | 1 | lot | cons-manish | 365 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS