Jawaharlal Nehru Port Trust Pumps & Gauges Procurement Raigad Maharashtra 2026

Bid Publish Date

31-Jan-2026, 9:16 pm

Bid End Date

23-Feb-2026, 1:00 pm

Value

₹10,34,564

Progress

Issue31-Jan-2026, 9:16 pm
Technical23-02-2026 12:44:50
Financial
Award06-Apr-2026, 2:14 am
Explore all 4 tabs to view complete tender details

Quantity

80

Category

Pump 30 HP Model Hi80 160

Bid Type

Two Packet Bid

Categories 77

Tender Overview

Jawaharlal Nehru Port Trust invites bids for the supply, installation, testing and commissioning of pump sets (30 HP Hi80, 10 HP Hi50), associated pressure gauges, and epoxy painting in Raigad, Maharashtra. The scope includes 30 HP pumpset with multiple optional spares (Spare 1-10 for 30 HP, Spare 2-10 for 10 HP) and delivery of 27 BOQ items with an estimated value of ₹1,034,564.00. The contract permits quantity variations up to ±25% and requires OEM warranty and after-sales support with service centers in the state. This procurement targets reliable installation, commissioning and ongoing maintenance capabilities within India. Unique aspects include staged option quantities and provider-led after-sales service constraints.

Technical Specifications & Requirements

  • Estimated value: ₹1,034,564.00
  • Scope: Supply, Installation, Testing and Commissioning of pumps and gauges; epoxy painting; provision of optional spares for 30 HP and 10 HP systems
  • Pumps & Motors: 30 HP Hi80 pump set with 30 HP motor; 10 HP Hi50 pump set with 10 HP motor
  • Gauges: Compound pressure gauges and pressure gauge for delivery head
  • Quality & Warranty: Warranty period 1 year from final acceptance; OEM warranty certificates required at delivery; service centers required in the consignee state; on-site and carry-in support terms
  • ATC & Service: Dedicated toll-free service support; escalation matrix; installation, commissioning and training/maintenance capability in India; 30-day post-award establishment of service center if not existing
  • Delivery & Option Clause: Quantity may be increased or decreased by up to 25% at contract rates; delivery period linked to original delivery order end date; minimum extension time of 30 days

Terms, Conditions & Eligibility

  • EMD: Not specified in the available terms; bidders must review at bid submission
  • Delivery: Delivery timeline follows the option clause with extensions calculated as (additional/ original quantity) × original delivery period, minimum 30 days
  • Warranty: 1 year warranty; provide OEM warranties at delivery; post-sale service group must be established in India within 30 days of award
  • Service: State-wise service centers for carry-in warranty; Toll-free service number; Escalation matrix provided
  • Documentation: Technical compliance and OEM authorization; evidence of service capabilities; installation and commissioning plan; training and maintenance proposals
  • Scope: Bid price must include all components for SITC; ensure compliance with service and support requirements

Key Specifications

  • Total items in BOQ: 27 (pump sets, gauges, epoxy painting, spare parts)

  • Pumps: 30 HP Hi80 with 30 HP motor; 10 HP Hi50 with 10 HP motor

  • Gauges: compound pressure gauges; pressure gauge for delivery head

  • Coating: epoxy painting specified

  • Spare parts: optional spares for 30 HP and 10 HP pumpsets (Spare 1-10 for 30 HP; Spare 2-10 for 10 HP)

  • Warranty: 1 year from final acceptance or after installation completion

  • Service: OEM service centers required in consignee state; service center establishment within 30 days if not existing

Terms & Conditions

  • Option clause allows ±25% quantity variation at contracted rates

  • Delivery period determined from last date of original delivery order

  • 1 year warranty with OEM certificates at delivery; after-sales service group in India

Important Clauses

Payment Terms

Payment terms linked to SITC completion; details to be provided in bid document and ATC

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time calculations apply with minimum 30 days

Penalties/Liquidated Damages

Penalty/LD terms to be defined in GeM terms and ATC; ensure compliance with delivery and warranty requirements

Bidder Eligibility

  • Experience in supply, installation, testing and commissioning of pump sets and related gauges

  • Evidence of OEM authorization and after-sales service capability in India

  • Financial stability demonstrated by audited statements and GST compliance

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Pump 30 HP Model Hi80 160 , Motor 30 HP , Pump 10 HP Model Hi50 125 , Motor 10 HP , Compound Pressure Gauges at Pumps , Pressure gauge for Delivery head , Epoxy Painting , Optioal Spare 1 for 30 HP Pumpset , Optioal Spare 2 for 30 HP Pumpset , Optioal Spare 3 for 30 HP Pumpset , Optioal Spare 4 for 30 HP Pumpset , Optioal Spare 5 for 30 HP Pumpset , Optioal Spare 6 for 30 HP Pumpset , Optioal Spare 7 for 30 HP Pumpset , Optioal Spare 8 for 30 HP Pumpset , Optioal Spare 9 for 30 HP Pumpset , Optioal Spare 10 for 30 HP Pumpset , Optioal Spare 2 for 10 HP Pumpset , Optioal Spare 3 for 10 HP Pumpset , Optioal Spare 4 for 10 HP Pumpset , Optioal Spare 5 for 10 HP Pumpset , Optioal Spare 6 for 10 HP Pumpset , Optioal Spare 7 for 10 HP Pumpset , Optioal Spare 8 for 10 HP Pumpset , Optioal Spare 9 for 10 HP Pumpset , Optioal Spare 10 for 10 HP Pumpset

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8914803.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

Pump 30 HP Model Hi80 160

Complete Overhauling inclusive of Replacement of Bearings Seals Gaskets and Rubber Couplings

2 ea Delivery: 60 days
#2

Motor 30 HP

Varnishing to winding and Replacement of Bearings

2 ea Delivery: 60 days
#3

Pump 10 HP Model Hi50 125

Complete Overhauling inclusive of Replacement of Bearings Seals Gaskets and Rubber Couplings

4 ea Delivery: 60 days
#4

Motor 10 HP

Varnishing to winding and Replacement of Bearings

4 ea Delivery: 60 days
#5

Compound Pressure Gauges at Pumps

Supply and installation of Compound Gauges for Suction and Delivery with Ball valve U pipe Connections and all accessories

6 ea Delivery: 60 days
#6

Pressure gauge for Delivery head

Supply and installation of Pressure Guage with Ball valve U pipe Connections and all accessories

1 ea Delivery: 60 days
#7

Epoxy Painting

Epoxy Painting of Pumpsets Pipelines and all metal parts in Pumphouse

1 ea Delivery: 60 days
#8

Optioal Spare 1 for 30 HP Pumpset

Pump Shaft EN19

2 ea Delivery: 60 days
#9

Optioal Spare 2 for 30 HP Pumpset

Impeller Nut MS

2 ea Delivery: 60 days
#10

Optioal Spare 3 for 30 HP Pumpset

Casing/Impeller Wear Ring CI

2 ea Delivery: 60 days
#11

Optioal Spare 4 for 30 HP Pumpset

Shaft Sleeve SS410

2 ea Delivery: 60 days
#12

Optioal Spare 5 for 30 HP Pumpset

Mechanical Seal Set Car Vs Sil Car Reputed Make

2 set Delivery: 60 days
#13

Optioal Spare 6 for 30 HP Pumpset

Bearing DE-Steel SKF

2 ea Delivery: 60 days
#14

Optioal Spare 7 for 30 HP Pumpset

Bearing NDE-Steel SKF

2 ea Delivery: 60 days
#15

Optioal Spare 8 for 30 HP Pumpset

Casing Gasket CAF

2 ea Delivery: 60 days
#16

Optioal Spare 9 for 30 HP Pumpset

Bearing Cover Gasket Oil Paper CAF

2 ea Delivery: 60 days
#17

Optioal Spare 10 for 30 HP Pumpset

Complete Rewinding of motor

2 ea Delivery: 60 days
#18

Optioal Spare 1 for 30 HP Pumpset

Pump Shaft EN19

4 ea Delivery: 60 days
#19

Optioal Spare 2 for 10 HP Pumpset

Impeller Nut MS

4 ea Delivery: 60 days
#20

Optioal Spare 3 for 10 HP Pumpset

Casing/Impeller Wear Ring CI

4 ea Delivery: 60 days
#21

Optioal Spare 4 for 10 HP Pumpset

Shaft Sleeve SS410

4 ea Delivery: 60 days
#22

Optioal Spare 5 for 10 HP Pumpset

Mechanical Seal Set Car Vs Sil Car Reputed Make

4 set Delivery: 60 days
#23

Optioal Spare 6 for 10 HP Pumpset

Bearing DE Steel SKF

4 ea Delivery: 60 days
#24

Optioal Spare 7 for 10 HP Pumpset

Bearing NDE Steel SKF

4 ea Delivery: 60 days
#25

Optioal Spare 8 for 10 HP Pumpset

Casing Gasket CAF

4 ea Delivery: 60 days
#26

Optioal Spare 9 for 10 HP Pumpset

Bearing Cover Gasket Oil Paper CAF

4 ea Delivery: 60 days
#27

Optioal Spare 10 for 10 HP Pumpset

Complete Rewinding of motor

4 ea Delivery: 60 days

Required Documents

1

GST certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar pump set supply/installation

4

Financial statements demonstrating turnover and solvency

5

EMD documentation (if applicable as per tender terms)

6

Technical bid documents demonstrating compliance with pumps, gauges, epoxy painting

7

OEM authorizations or dealer/authorized distributor letters

8

Warranty certificates or OEM warranty terms

Technical Results

S.No Seller Item Date Status
1
SEA DOGS PRIVATE LIMITED   Under PMA
-23-02-2026 12:44:50
2
SHWETA ENGINEERS   Under PMA
-23-02-2026 00:26:13

Financial Results

Rank Seller Price Item
L1
SEA DOGS PRIVATE LIMITED( MSE Social Category:General )    Under PMA
Item Categories : Pump 30 HP Model Hi80 160,Motor 30 HP,Pump 10 HP Model Hi50 125,Motor 10 HP,Compound Pressure Gauge
L2
SHWETA ENGINEERS( MSE Social Category:General )    Under PMA
Item Categories : Pump 30 HP Model Hi80 160,Motor 30 HP,Pump 10 HP Model Hi50 125,Motor 10 HP,Compound Pressure Gauge

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for pumps and gauges tender in Raigad Maharashtra 2026?

Bidders should register on GeM, submit the technical bid with OEM authorization, provide installation and commissioning plan, include OEM warranty, service center proof in Maharashtra, and attach GST/PAN along with financial statements. Ensure compliance with option clause and 1 year warranty requirements.

What documents are required for the Raigad pumps tender bid 2026?

Required documents include GST certificate, PAN, experience certificates for similar pump projects, financial statements, OEM authorizations, technical bid detailing SITC scope, and warranty certificates. Upload service center details in the state and proof of after-sales support readiness.

What are the technical specifications for 30 HP and 10 HP pumps tender in Maharashtra?

Technical scope includes 30 HP Hi80 pump with 30 HP motor and 10 HP Hi50 pump with 10 HP motor, pressure gauges, epoxy coating, and optional spares for multiple pumpsets. The contract requires 1-year warranty and SITC support with installation and commissioning.

When is delivery expected for the Raigad pump tender 2026?

Delivery timing follows the option clause, with period calculated as (additional/original quantity) × original delivery period, minimum 30 days. If no original period specified, bidders must rely on ATC for concrete dates and ensure timely installation and commissioning.

What is the warranty requirement for the Maharashtra pumps procurement?

Warranty is 1 year from final acceptance or completion of installation, with OEM warranty certificates provided at delivery. The seller must commit to rectification of any breakdown during the guarantee period and establish local service capabilities across India.

What are the service center requirements for the Raigad pump project?

Bidder must have a functional service centre in the state of each consignee location; if not, the bidder must establish one within 30 days of contract award, with documentary evidence of the new facility required for payment release.

How does the quantity option clause affect the pump tender in Maharashtra?

The purchaser may increase or decrease quantity by up to 25% at contract rates during placement and throughout the currency of the contract. Additional time is calculated by the formula provided, with a minimum extension of 30 days to accommodate extra demand.