Quantity

63834

Bid Type

Two Packet Bid

Categories 127

AGITATORS BLOCK WORK BITUMINOUS MATERIAL DISTRIBUTOR AD FILM WIND MILL ENERGY PROJECT APPARELS PRINTING SERVICES PLATFORM SCALE BRIDGE CONSTRUCTION AGRICULTURE IMPLEMENT PAVING EQUIPMENT TRAFFIC BARRIER BUILDING CONSTRUCTION FIELD SPORTS EQUIPMENT PAINTING RING STRUCTURE FABRICATION CONSTRUCTION MATERIALS EXCAVATOR WOODEN TROLLEY CARBON GRANULAR UNIFORM PERISTALTIC PUMPS TUBE AND FITTING JCB HELIPAD STRUCTURAL OFFSET PRINTING STEEL FURNITURE HARDWARE AND FASTENERS LOADER ROTAVATOR TONGUE WIRE FERROUS ALLOY SUPPLY ASPHALT DISTEMPER STONE SUPPLY WOODEN PRODUCT DISCRETE COMPONENTS STEEL BENCH STEEL TUBE ILLUMINATOR ARCHITECTURAL DRAWING ATHLETIC TRACK PETROLEUM PRODUCT SOIL EARTH SNG HYDRAULIC SHOVEL CLOTHING EQUIPMENT GI WIRE VIBRATORY BITUMEN EMULSION STOMACHERS HIGHWAY CONSTRUCTION POWER STADIUM PAINT SUPPLY MS WIRE PAPER AND PRINTING SERVICES INTERIOR DESIGNERS FABRIC RCC BLOCK CEMENT EARTH AND STONE MACHINING AND PROCESSING SERVICES BRICK WORK HOOKS BLACK TOPPING SURFACE BARE METAL EARTH MOVING MACHINERY GL WIRE BASSES LED LIGHT BOLTS WASHERS RCC WORK CONSTRUCTION MACHINERY NUTS DRAINAGE MACHINERY BOX ENAMELING PAINTS AND ACCESSORIES WIRE ERECTION OF STRUCTURAL ALUMINIUM HYDROXIDE SAND SUPPLY WORM GEAR TURBINE PUMPS FILLING RAIN CUT PAINTS AND PRIMERS FIBERS THREADS AND YARNS MINING EQUIPMENT ROAD WORK DISCUS MESH LIGHTING BACKHOE PIT WORK FABRICATOR EXCAVATION RECIPROCATING PUMPS EXHIBITION DESIGN PAINT ADDITIVES EARTH WORK BARYTES POWDER BRICK BUNDI HURDLES HYDRAULIC PEB PIPES PAINTS ALUMINUM METAL PRODUCTS BAR BITUMEN ROAD METALLURGY STEEL SUPPLY EARTH MOVING CONSTRUCTION LABOUR MANUFACTURING SERVICES SHIFTING OF MATERIAL EARTH MOVER PAINTING MATERIAL TRANSPORTATION CRANE

Indian Army invites bids for Synthetic Athletic Track Normal Stress Area, Synthetic Athletic Track High Stress Area, Sand filling in jumping pits, Earth Work, Cover Laying Pipes, cables etc, Filling available excavated earth, Concrete Work, Steel Centering and shuttering, Steel Work, Drainage Work, Brick Work, Finishing, Finishing Neat Cement Punning, Road Work, Spreading and compacting specified grade Granular sub base, Wet mix macadam, Tack coat, Bitumen Surface, Laying Bituminous macadam, Llaying dense bituminous concrete, Thick cement concrete slab, Providing and fixing concrete Kerb stones, Weedicide over the prepared subgrade, Long and Triple jump trough casing Aluminium, Long and Triple jump take off board, Long and Triple jump Blanking Board, Long and Triple Jump stencils, Long and Triple Jump Control Strips, Long and Triple Jump plasticine, Long and Triple Jump Training strips, Water Jump Hurdles, High Jump Landing base, High Jump Pit with uprights and cross bar, Hammer cum discuss ring with cage, Shot Put Ring, Shot Put board, Pole Vault box with cover, uprights cross bar and landing area, Pole vault boxes, Cover for pole vault boxes, Take off tray, Dummy board with synthetic top, Aluminum Kerbing, Sand Pit, Chain Link Fencing, Centering and shuttering, Providing and laying in position cement concrete, Reinforced cement concrete, Structural steel work riveted, Painting with synthetic enamel paint, Providing and fixing G. I. chain link, Flood Lighting in PUNE, MAHARASHTRA. Quantity: 63834. Submission Deadline: 21-03-2025 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Synthetic Athletic Track Normal Stress Area , Synthetic Athletic Track High Stress Area , Sand filling in jumping pits , Earth Work , Cover Laying Pipes, cables etc , Filling available excavated earth , Concrete Work , Steel Centering and shuttering , Steel Work , Drainage Work , Brick Work , Finishing , Finishing Neat Cement Punning , Road Work , Spreading and compacting specified grade Granular sub base , Wet mix macadam , Tack coat , Bitumen Surface , Laying Bituminous macadam , Llaying dense bituminous concrete , Thick cement concrete slab , Providing and fixing concrete Kerb stones , Weedicide over the prepared subgrade , Long and Triple jump trough casing Aluminium , Long and Triple jump take off board , Long and Triple jump Blanking Board , Long and Triple Jump stencils , Long and Triple Jump Control Strips , Long and Triple Jump plasticine , Long and Triple Jump Training strips , Water Jump Hurdles , High Jump Landing base , High Jump Pit with uprights and cross bar , Hammer cum discuss ring with cage , Shot Put Ring , Shot Put board , Pole Vault box with cover, uprights cross bar and landing area , Pole vault boxes , Cover for pole vault boxes , Take off tray , Dummy board with synthetic top , Aluminum Kerbing , Sand Pit , Chain Link Fencing , Centering and shuttering , Providing and laying in position cement concrete , Reinforced cement concrete , Structural steel work riveted , Painting with synthetic enamel paint , Providing and fixing G.I. chain link , Flood Lighting

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7528480.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 55 Items Sign in for GEM prices

#1

Synthetic Athletic Track Normal Stress Area

Normal Stress Areas with a minimum thickness of 14mm of finished track surface for Sandwich System Sandwich System

6,896 sqm Delivery: 210 days
#2

Synthetic Athletic Track High Stress Area

High stress areas with a minimum thickness of 20mm of finished track surface

180 sqm Delivery: 210 days
#3

Synthetic Athletic Track High Stress Area

High Stress areas with a minimum thickness of 25mm of finished surface

20 sqm Delivery: 210 days
#4

Sand filling in jumping pits

Construction of Sand filling in jumping pits including cost and conveyance of all materials and labour charges to the site to fill the sand in pits and complete finished item as per the drawing and as directed by Engineer in chief

40 cum Delivery: 210 days
#5

Sand filling in jumping pits

Construction of Sand filling in jumping pits including cost and conveyance of all materials and labour charges to the site to fill the sand in pits and complete finished item as per the drawing and as directed by Engineer in chief

2 nos Delivery: 210 days
#6

Earth Work

Any types of soil viz soft loose or hard dense soil

2,484 cum Delivery: 210 days
#7

Cover Laying Pipes, cables etc

Cover laying Pipes cables etc. exceeding 80mm dia But not exceeding 450mm dia

60 mtr Delivery: 210 days
#8

Filling available excavated earth

Filling excavated earth obtained from excavation in soccer field in layers not exceeding 20 cm in depth Consolidating each deposited layer by leveling to required slope Consolidating each deposited layer by leveling to required slope

1,065 cum Delivery: 210 days
#9

Concrete Work

1 2 4 1 Cement 2 coarse sand 4 grded stone aggregate 20mm normal size All work upto plinth level

64 cum Delivery: 210 days
#10

Concrete Work

1 3 6 1 Cement 3 Coarse Sand 6 graded stone aggregate 40mm normal size

15 cum Delivery: 210 days
#11

Concrete Work

1 4 8 (1 Cement 4 Coarse sand 8 graded stone aggregate 40mm normal size

59 cum Delivery: 210 days
#12

Steel Centering and shuttering

Retaing walls, return wall, walls including attached pillars, buttresses, plinth and string coarses fillers etc

1,050 sqm Delivery: 210 days
#13

Steel Work

Providing T.M.T. steel reinforcement for R.C.C. work including straightening cutting, bending, hooking, placing in position, lapping and (or welding whatever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps,hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications

12,000 kg Delivery: 210 days
#14

Drainage Work

Providing and laying of 60mm thick, perforated, heavy duty, steel fibre reinforced cement concrete drain covers of approved make and design, all complete as per the specifications and direction of Engineer in charge

120 sqm Delivery: 210 days
#15

Brick Work

Material & Labour for brick work with FPS bricks of class designation 75 in foundation and plinth built in Cement mortar 1 4 1 Cement 4 Coarse sand

62 cum Delivery: 210 days
#16

Finishing

12mm cement plaster of mix 1 4 ( 1 Cement 4 Coarse Sand

303 sqm Delivery: 210 days
#17

Finishing Neat Cement Punning

12mm cement plaster of mix Neat Cement Punning

303 sqm Delivery: 210 days
#18

Road Work

Consolidation of subgrade with power road roller of 8 to 12 tonne capacity to required slope including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade

7,096 sqm Delivery: 210 days
#19

Spreading and compacting specified grade Granular sub base

Providing, laying, Spreading and compacting specified grade Granular sub base coarse using specified stone dust, gravel or any other coarse granular materials of approved materials in subbase coarse including picking and compacting with of 200mm thick loose compacted to 150mm thick (CBR value not less than 30) including spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, watering and compacting with vibratory roller to achieve the desired density, complete as per MORT & H ( 4th Version) specification no.401 for finished item of work as directed by the Engineer in Charge at site of work

1,065 cum Delivery: 210 days
#20

Wet mix macadam

Providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with the water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density and as per the MORT & H Specifications

1,065 cum Delivery: 210 days
#21

Tack coat

Providing and applying tack coat using cold bitumen emulsion including spraying the bitumen with mechanically operated spray unit fitted on bitumen with preparing the existing road surface as per the specifications

7,096 sqm Delivery: 210 days
#22

Bitumen Surface

Bitumen Surface

7,096 sqm Delivery: 210 days
#23

Laying Bituminous macadam

Providing and laying Bituminous macadam on prepared surface with specified graded crushed stone aggregate for profile corrective base/binder course including loading of aggregate with FE loader and hot mixing of stone aggregates and bitumen in hot mix plant, transporting the mixed material by tipper to paver and laying the mixed material with paver finisher fitted with electronic sensing device to the required level and grade and rolling by road roller

355 cum Delivery: 210 days
#24

Llaying dense bituminous concrete

Providing and laying dense bituminous concrete on the prepared surface with specified graded crushed one aggregate for wearing course including loading of aggregate with FE loader and hot mixing of stone aggregate, filler and bitumen in hot mix plant, transporting the mixed material by tipper to paver and laying the mixed material with paver finisher fitted with electronic sensing device to the required level and grade and rolling by road roller

213 cum Delivery: 210 days
#25

Thick cement concrete slab

Providing & Laying minimum 15cm thick cement concrete slab over the existing sub base with a normal mix of 1 1.5 3 ( 1 Cement 1 5 Coarse sand 3 Graded Stone aggregate 20 mm normal size for fixing throwing circles for Discuss/Hammer/ Shot-put in required diameter/size including cost of cutting the base and sub base whereever necessary cost of fixing the required throwing circle rings fo Discus/Hammer/Shot-put with necessary fixing arrangements as per the direction of the Enginner in charge. The finished surface of the concrete base slab shall have required non skid/ non slippery finish and gradient as per requirements / specifications laid down by IAAF as as per the directions of the engineer in charge the cost of throwing circle rings is not included in this item and shall be paid as part of competition equipment

11 cum Delivery: 210 days
#26

Providing and fixing concrete Kerb stones

Providing and fixing concrete Kerb stones

480 rm Delivery: 210 days
#27

Weedicide over the prepared subgrade

Providing and spreading of good quality weedicide over the prepared subgrade (after preparing the earth) of track area to avoid the growth of weeds in the top

7,096 sqm Delivery: 210 days
#28

Long and Triple jump trough casing Aluminium

Long and Triple jump trough casing( Aluminium)

3 nos Delivery: 210 days
#29

Long and Triple jump take off board

Long and Triple jump take off board

3 nos Delivery: 210 days
#30

Long and Triple jump Blanking Board

Long and Triple jump Blanking Board

3 nos Delivery: 210 days
#31

Long and Triple Jump stencils

Long and Triple Jump stencils

1 nos Delivery: 210 days
#32

Long and Triple Jump Control Strips

Long and Triple Jump Control Strips

1 nos Delivery: 210 days
#33

Long and Triple Jump plasticine

Long and Triple Jump plasticine

1 nos Delivery: 210 days
#34

Long and Triple Jump Training strips

Long and Triple Jump Training strips

1 nos Delivery: 210 days
#35

Water Jump Hurdles

Water Jump Hurdles

1 nos Delivery: 210 days
#36

High Jump Landing base

High Jump Landing base

1 nos Delivery: 210 days
#37

High Jump Pit with uprights and cross bar

High Jump Pit with uprights (1 pair) and cross bar

1 nos Delivery: 210 days
#38

Hammer cum discuss ring with cage

Hammer cum discuss ring with cage

1 nos Delivery: 210 days
#39

Shot Put Ring

Shot Put Ring

1 nos Delivery: 210 days
#40

Shot Put board

Shot Put board

1 nos Delivery: 210 days
#41

Pole Vault box with cover, uprights cross bar and landing area

Pole Vault box with cover, uprights (one pair), cross bar and landing area

1 nos Delivery: 210 days
#42

Pole vault boxes

Pole vault boxes

1 nos Delivery: 210 days
#43

Cover for pole vault boxes

Cover for pole vault boxes

1 nos Delivery: 210 days
#44

Take off tray

Take off tray

3 nos Delivery: 210 days
#45

Dummy board with synthetic top

Dummy board with synthetic top (included in above)

1 nos Delivery: 210 days
#46

Aluminum Kerbing

Aluminum Kerbing

1 nos Delivery: 210 days
#47

Sand Pit

Construction of sand pit of size 80Mx 2.5M with sand filing including and conveyance of all materials and labour charges to the site to fill the sand pits and complete finished item as per the drawing and directed by EIC

1 job Delivery: 210 days
#48

Chain Link Fencing

Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding1.5 min width or 10 sqm on plan), including dressing of side sand ramming of bottoms, lift upto1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.

22 cum Delivery: 210 days
#49

Centering and shuttering

Centering and shuttering including strutting, propping etc and removal of form work for in Foundations footings bases for columns

288 sqm Delivery: 210 days
#50

Providing and laying in position cement concrete

Providing and laying in position cement concrete of specified grade excluding the cost of center in gand shuttering-All work up to plinth (1Cement 4 coarse sand 8 graded stone aggregate 40 mm nominal size

8 cum Delivery: 210 days
#51

Reinforced cement concrete

Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level (1cement1 5 coarse sand (zone-III) 3 graded stone aggregate 20 mm nominal size)

15 cum Delivery: 210 days
#52

Structural steel work riveted

Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a coat of red oxide priming coat of approved steel primer

5,736 kg Delivery: 210 days
#53

Painting with synthetic enamel paint

Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work

480 sqm Delivery: 210 days
#54

Providing and fixing G.I. chain link

Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 6mm dia bearing bar in the nuts, bolts and washers as required complete as per the direction of Engineer-in-charge Made of G.I. wire of dia 4mm

960 sqm Delivery: 210 days
#55

Flood Lighting

Design, manufacturing, supply and installation of Hot dip galvanised, polygonal Stadium masts with fixed head frame suitable for mounting upto 18 nos. of 1000W LED Light as required. The height of the mast from base upto top of head frame shall be 30mtrs. The mast has been designed considering base wind speed as per IS 875 i.e. 47 m/s

1 job Delivery: 210 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-21-03-2025 13:43:57
2
**********   Under PMA
-21-03-2025 14:56:03
3
**********   Under PMA
-21-03-2025 14:39:24
4
**********   Under PMA
-21-03-2025 14:15:13
5
**********   Under PMA
-21-03-2025 15:47:28
6
**********   Under PMA
-21-03-2025 11:30:16
7
**********   Under PMA
-21-03-2025 13:32:44
8
**********   Under PMA
-21-03-2025 12:26:32
9
**********   Under PMA
-20-03-2025 13:06:47
10
**********   Under PMA
-20-03-2025 11:13:35

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

What are the eligibility requirements for this tender?

The eligibility requirements include being a registered entity capable of performing similar construction tasks, having relevant experience with synthetic athletics tracks, and complying with government standards. Bidders must prove their capability to manage such projects effectively while maintaining quality and safety protocols.

What certifications are required for this tender?

Bidders must provide relevant industry certifications that demonstrate compliance with construction safety and quality standards. This includes any licenses or accreditations necessary for synthetic athletics track installations, ensuring adherence to best practices and regulations in construction.

How should bidders register for this tender?

Bidders can register through the official portal established by the Department of Military Affairs. Registration typically requires the submission of company credentials, financial documents, and proof of previous experience in related projects.

What are the specifications for the synthetic athletics track?

The technical specifications for the synthetic athletics track include high-performance materials suitable for various athletic events. Key specifications should reflect durability, weather resistance, and criteria outlined for both normal stress and high-stress areas of the track.

What is the Earnest Money Deposit (EMD) amount for this tender?