Bid Publish Date
26-Dec-2025, 7:53 pm
Bid End Date
10-Jan-2026, 6:00 pm
EMD
₹1,05,800
Location
Progress
RAQuantity
9
Category
Engr and Fabrication Work
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) in JAMMU, JAMMU & KASHMIR – 180001 seeks mechanical, electrical, civil, and facility management services across multiple categories including Engr and Fabrication Work, Flooring, Lighting, Access System, Solar System, and related project management, installation, commissioning, freight, and training. The procurement involves 9 items with a total estimated scope not disclosed, and an EMD of ₹105,800. A key differentiator is the post-award requirement to obtain Detailed Design Drawings approved by the Buyer within 21 days, with potential delivery schedule adjustments if approvals are delayed. The contract allows OEM installation by authorized personnel and reserves an option clause enabling up to 50% quantity variation. This tender emphasizes non-obsolescence and prior government supply experience as critical eligibility factors. Unique aspects include drawing approvals, extensive post-award coordination, and multi-disciplinary execution across fabrication, installation, and commissioning.
EMD: ₹105,800
Delivery: 21-day approval window for Detailed Design Drawings
Experience: 2 years govt/PSU supply for similar products
Product span: Engr & Fabrication, Flooring, Lighting, Office, Access System, Solar, Forklift 2T
Installation/Commissioning by OEM-certified personnel
Non-obsolescence: 2+ years residual market life for bid products
Option clause: up to 50% quantity variation
Detailed Design Drawings must be approved within 21 days post-award; delays shift delivery without LD
Bidder to demonstrate 2 years govt/PSU supply experience with contracts submitted
OEM installation/commissioning by authorized personnel and non-obsolescence commitment required
GST is the bidder's responsibility; reimbursement as actuals or lower rate, capped at quoted GST percentage.
Delivery period adjusted if drawing approvals are delayed; no liquidated damages for buyer-induced delays.
Not explicitly stated; LD may be waived if delays are due to design approval processes by Buyer.
Regularly manufactured and supplied same/similar Category Products to Central/State Govt/PSU for 2 years
OEM or OEM-certified resource to handle installation, commissioning and training
Not under liquidation or bankruptcy; provide an undertaking
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Engr and Fabrication Work , Flooring , Repository Design , Lighting , Office , Access System , Solar System , Electric Forklift 2T Electric 3 Wheel, 6mm mast with side shifter , Services. Project mgt consulting, project mgt exe, instln, Commissioning, freight and trg
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Engr and Fabrication Work
Engr and Fabrication Work
Flooring
Flooring
Repository Design
Repository Design
Lighting
Lighting
Office
Office
Access System
Access System
Solar System
Solar System
Electric Forklift 2T Electric 3 Wheel, 6mm mast with side shifter
Electric Forklift 2T Electric 3 Wheel, 6mm mast with side shifter
Services. Project mgt consulting, project mgt exe, instln, Commissioning, freight and trg
Services. Project mgt consulting, project mgt exe, instln, Commissioning, freight and trg
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Engr and Fabrication Work | Engr and Fabrication Work | 1 | job or work | vineesh@123 | 30 | |
| 2 | Flooring | Flooring | 1 | job or work | vineesh@123 | 30 | |
| 3 | Repository Design | Repository Design | 1 | job or work | vineesh@123 | 30 | |
| 4 | Lighting | Lighting | 1 | job or work | vineesh@123 | 30 | |
| 5 | Office | Office | 1 | job or work | vineesh@123 | 30 | |
| 6 | Access System | Access System | 1 | job or work | vineesh@123 | 30 | |
| 7 | Solar System | Solar System | 1 | job or work | vineesh@123 | 30 | |
| 8 | Electric Forklift 2T Electric 3 Wheel, 6mm mast with side shifter | Electric Forklift 2T Electric 3 Wheel, 6mm mast with side shifter | 1 | nos | vineesh@123 | 30 | |
| 9 | Services. Project mgt consulting, project mgt exe, instln, Commissioning, freight and trg | Services. Project mgt consulting, project mgt exe, instln, Commissioning, freight and trg | 1 | nos | vineesh@123 | 30 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Experience contracts/certs showing 2 years govt/PSU supply
Technical bid documents and OEM authorizations (if applicable)
Any Detailed Design Drawings or drawings approval correspondence
Bidder undertaking not in liquidation or bankruptcy
Extended Deadline
10-Jan-2026, 6:00 pm
Opening Date
10-Jan-2026, 6:30 pm
Extended Deadline
07-Jan-2026, 6:00 pm
Opening Date
07-Jan-2026, 6:30 pm
Start
04-Feb-2026, 8:00 pm
End
05-Feb-2026, 8:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Bharat dynamics Automation Under PMA | - | 10-01-2026 00:09:02 | |
| 2 | DIVYA IRON INDUSTRY Under PMA | - | 10-01-2026 11:54:32 | |
| 3 | M/S K.S. ENGINEERS Under PMA | - | 09-01-2026 23:48:44 | |
| 4 | SHREE SHYAM ENTERPRISES Under PMA | - | 07-01-2026 17:25:01 | |
| 5 | VICTORY INDUSTRIES Under PMA | - | 07-01-2026 14:08:58 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | M/S K.S. ENGINEERS(MII) Under PMA Winner | ₹34,96,000 | Item Categories : Engr and Fabrication Work,Flooring,Repository Design,Lighting,Office,Access System,Solar System,Ele |
| L2 | Bharat dynamics Automation (MII) Under PMA | ₹36,00,000 | Item Categories : Engr and Fabrication Work,Flooring,Repository Design,Lighting,Office,Access System,Solar System,Ele |
| L3 | DIVYA IRON INDUSTRY (MSE,MII) Under PMA | ₹38,50,000 | Item Categories : Engr and Fabrication Work,Flooring,Repository Design,Lighting,Office,Access System,Solar System,Ele |
🎉 L1 Winner
M/S K.S. ENGINEERS(MII) Under PMA
Final Price: ₹34,96,000
Key insights about JAMMU AND KASHMIR tender market
Bidders must meet eligibility: 2 years govt/PSU supply, provide OEM authorizations, and submit PAN, GSTIN, cancelled cheque, EFT mandate; include Detailed Design Drawings within 21 days of award and comply with non-obsolescence criteria.
Required docs include PAN, GSTIN, cancelled cheque, EFT mandate, experience contracts proving 2-year govt/PSU supply, technical bid and OEM authorizations, and any design drawings or approval communications related to the project.
The tender spans forklift (2T, electric, 3-wheel) and solar system components; installation must be performed by OEM-certified personnel; no explicit numerical specs are provided in the text, but non-obsolescence and 2-year life must be ensured.
The approval window is 21 days from contract award; if approvals are delayed by the Buyer, the delivery period will be adjusted accordingly without LD.
The EMD amount is ₹105,800; bidders must submit this as part of the bid, subject to usual tender refund or adjustment rules as per government norms.
The purchaser may increase or decrease the bid quantity by up to 50% at contract placement or during the currency of the contract; delivery timeline will adjust from the last order date.
Installation must be carried out by OEM-certified resources or OEM-authorized resellers; ensure you provide OEM authorization documents and demonstrate installation capability for multi-category items.
GST is bidder-borne; reimbursement will be as per actuals or the quoted GST rate, whichever is lower; payment terms are linked to delivery and approved designs, per contract but not fully detailed in the tender text.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS