Bid Publish Date
08-Aug-2026, 11:54 am
Bid End Date
18-Aug-2026, 12:00 pm
Value
₹1,40,000
Location
Progress
Quantity
23
Category
Dynamic Balancing at our Mill site of Cane cutter
Bid Type
Two Packet Bid
Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for comprehensive dynamic balancing and vibration analysis services across multiple mill site components, including cane cutter, fibrizer, FD fan, ID fan, bagasse blower, KT.1350 line items (NK.1100, KC 1500, Batchtype assemblies) and a 3 MW power turbine rotor. The estimated contract value is ₹140,000 with potential quantity adjustments of ±25% per order. Firms should align with the extended delivery framework where delivery periods extend from the last delivery order and adapt to additional time based on the formula provided in the tender terms. This opportunity covers specialized balancing and vibration measurement across critical mill equipment, enabling predictive maintenance and performance optimization.
Option to increase/decrease quantity up to 25% and extend delivery with the specified formula
Delivery starts from the last delivery order date; extended time uses (additional quantity/original quantity) × original period
Bidders must submit all required documents as per ATC; follow safety and site access protocols
Payment terms to be defined in ATC; bidders must consult ATC for schedule and milestones
Delivery commences from last date of original order; option-based extension governed by formula with minimum 30 days
Penalties if delivery/quality standards are not met per ATC; refer to specific LD rates in ATC
Experience in dynamic balancing and vibration analysis for large mechanical systems
Capability to perform in-situ balancing on multiple mill-site components
Compliance with ATC documents and ability to meet 25% quantity variation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Dynamic Balancing at our Mill site of Cane cutter , Dynamic Balancing at our Mill site of fibrizer , Dynamic Balancing at our Mill site of FD Fan , Dynamic Balancing at our Mill site of ID Fan , Dynamic Balancing at our Mill site of Bagasse Blower , Dynamic Balancing at our Mill site of KT.1350 03 Nos NK.1100. 01 Nos KC 1500 . 01 Nos Batchtype . 03 Nos , Dynamic Balancing of Alternator Rotor of 3MW Power Turbine , Vibration Analysis and Measurement of 3MW Power Turbine
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Muzaffarnagar
Delivery Pincodes
251316
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mukesh Kumar Verma | 251316,THE GANGA KISAN SAHKARI CHINI MILLS LTD MORNA MUZAFFARNAGAR PIN 251316 GST NO= 09AAAJT0456F1Z4 CONTACT NO 8840425682, 7880888915, 7880888912 | Muzaffarnagar | Uttar Pradesh | 251316 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Dynamic Balancing at our Mill site of Cane cutter
Dynamic Balancing at our Mill site of Cane cutter
Dynamic Balancing at our Mill site of fibrizer
Dynamic Balancing at our Mill site of fibrizer
Dynamic Balancing at our Mill site of FD Fan
Dynamic Balancing at our Mill site of FD Fan
Dynamic Balancing at our Mill site of ID Fan
Dynamic Balancing at our Mill site of ID Fan
Dynamic Balancing at our Mill site of Bagasse Blower
Dynamic Balancing at our Mill site of Bagasse Blower
Dynamic Balancing at our Mill site of KT.1350 03 Nos NK.1100. 01 Nos KC 1500 . 01 Nos Batchtype . 03 Nos
Dynamic Balancing at our Mill site of KT.1350 03 Nos NK.1100. 01 Nos KC 1500 . 01 Nos Batchtype . 03 Nos
Dynamic Balancing of Alternator Rotor of 3MW Power Turbine
Dynamic Balancing of Alternator Rotor of 3MW Power Turbine
Vibration Analysis and Measurement of 3MW Power Turbine
Vibration Analysis and Measurement of 3MW Power Turbine Note It is mandatory that Bidder must preinspect all eight work at mill site and upload inspection report duly verified by CE an portal with Bid Document
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Dynamic Balancing at our Mill site of Cane cutter | Dynamic Balancing at our Mill site of Cane cutter | 2 | nos | bycn2.upcsffl.morna | 15 | |
| 2 | Dynamic Balancing at our Mill site of fibrizer | Dynamic Balancing at our Mill site of fibrizer | 1 | nos | bycn2.upcsffl.morna | 15 | |
| 3 | Dynamic Balancing at our Mill site of FD Fan | Dynamic Balancing at our Mill site of FD Fan | 3 | nos | bycn2.upcsffl.morna | 15 | |
| 4 | Dynamic Balancing at our Mill site of ID Fan | Dynamic Balancing at our Mill site of ID Fan | 6 | nos | bycn2.upcsffl.morna | 15 | |
| 5 | Dynamic Balancing at our Mill site of Bagasse Blower | Dynamic Balancing at our Mill site of Bagasse Blower | 1 | nos | bycn2.upcsffl.morna | 15 | |
| 6 | Dynamic Balancing at our Mill site of KT.1350 03 Nos NK.1100. 01 Nos KC 1500 . 01 Nos Batchtype . 03 Nos | Dynamic Balancing at our Mill site of KT.1350 03 Nos NK.1100. 01 Nos KC 1500 . 01 Nos Batchtype . 03 Nos | 8 | nos | bycn2.upcsffl.morna | 15 | |
| 7 | Dynamic Balancing of Alternator Rotor of 3MW Power Turbine | Dynamic Balancing of Alternator Rotor of 3MW Power Turbine | 1 | nos | bycn2.upcsffl.morna | 15 | |
| 8 | Vibration Analysis and Measurement of 3MW Power Turbine | Vibration Analysis and Measurement of 3MW Power Turbine Note It is mandatory that Bidder must preinspect all eight work at mill site and upload inspection report duly verified by CE an portal with Bid Document | 1 | nos | bycn2.upcsffl.morna | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for dynamic balancing & vibration analysis
Financial statements of last 3 years
EMD/Security deposit (as per ATC)
Technical bid document (methodology, equipment list, calibration certificates)
OEM authorizations (if applicable for equipment used)
ATC-viewed certificates or compliance documents
Bidders should review the ATC for the Uttar Pradesh Cooperative Sugar Factories Federation Limited balancing scope, gather GST, PAN, and experience certificates, and prepare an equipment list with calibration details. Ensure ability to handle ±25% quantity variation and submit the required technical bid with OEM authorizations if applicable.
Submit GST registration, PAN card, experience certificates in balancing, three-year financials, EMD as per ATC, technical compliance certificates, OEM authorizations where required, and the ATC-viewed compliance documents; ensure site access and safety clearances are in place.
Delivery begins from the last date of the original delivery order; quantity may increase up to 25%, with extension time calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days.
Scope includes dynamic balancing and vibration analysis for cane cutter, fibrizer, FD/ID fans, bagasse blower, and 3 MW turbine rotor; review ATC for specific balancing standards and measurement procedures; ensure on-site balancing capability.
Estimated value is ₹140,000; payment terms are defined in the ATC and may include milestone-based payments; bidders should confirm bank terms, delivery milestones, and acceptance criteria from the ATC.
Access the uploaded ATC in the tender portal; download and review for additional requirements, eligibility criteria, LD provisions, and any equipment-specific tests; ensure compliance before bid submission.
Equipment includes cane cutter, fibrizer, FD fan, ID fan, bagasse blower, KT.1350, NK.1100, KC 1500 units, Batchtype assemblies (3 Nos), and a 3 MW turbine rotor bearing alignment—final itemization per ATC.
Eligibility covers demonstrated balancing/vibration analysis capability, GST/PAN compliance, financial stability, prior experience in similar projects, and compliance with the option clause for quantity variation and delivery extensions per ATC.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS