Bid Publish Date
10-Jul-2026, 7:53 pm
Bid End Date
31-Jul-2026, 8:00 pm
EMD
₹5,98,532
Progress
Quantity
1963
Category
OFC 12 Core ADSS 12F
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a comprehensive telecom and power equipment package including OFC 12 Core ADSS, 50 Pair 0.5mm Unarmoured JFC, 20 Pair 0.9mm Unarmoured JFC, 10 Pair 0.9mm Unarmoured JFC, IAD 24 Port, 10 KVA UPS with Bty Bank, 5 KVA UPS with Bty Bank, 2 KVA UPS Online, 1 KVA UPS Online, 12 Volt 90 AHC Bty and related battery configurations, chemical earthing pits with rods, HDD and Laying of OFC, DP Boxes, Krone modules, jointing kits, Krone mounting strips, HDPE ducts, GI ISI brand pipes, route markers, fiber patch cords, optical testers, splitters, and related components. Estimated value is not specified; EMD amount is ₹598,532. The scope includes supply, installation, testing and commissioning of goods at Army locations (telecom/ADSS infrastructure). The contract allows up to 25% quantity variation during execution at contracted rates, with delivery timing based on last delivery order date and subject to a minimum 30 days extension and a potential extension to the original delivery period. Compliance with OEM data sheets and non-obsolescence are required.
OFC 12 Core ADSS
JFC: 50 Pair 0.5mm Unarmoured; 20 Pair 0.9mm Unarmoured; 10 Pair 0.9mm Unarmoured
IAD 24 Port, 12V battery banks (90 AHC, 42 AHC, 18 AHC)
UPS: 10 KVA, 5 KVA, 2 KVA; online 1 KVA; earthing pits, HDD, ducting and laying
DP Boxes: 50/20/10 Pair; Krone modules and jointing kits
Krone mounting strips 100 Pair / 50 Pair; HDPE duct; GI ISI pipes
Route markers, enclosure, manhole, hand hole, fiber patches, power meters
Data sheets must be provided; OEM-certified installation
EMD amount ₹598,532; bid validity not stated; option clause allows 25% quantity variation
Three years of Govt sector supply experience required; documentary support mandatory
OEM/Authorized installation required; data sheets and non-obsolete product life required
Delivery period starts from last date of original delivery order; option of increased quantity up to 25% at contracted rates; minimum extension 30 days
Delivery timing linked to original order date; extension rules defined; extended period may start after last date of extended delivery period
Not explicitly specified in provided data; implied via delivery extension rules and performance benchmarks
3 years Govt/PSU supply experience for similar product categories
Regular manufacturing/supply history of telecom/OSP components to government bodies
Financial standing free of liquidation or bankruptcy; positive EFT mandate
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
OFC 12 Core ADSS 12F , 50 Pair 0.5mm Unarmoured JFC , 20 Pair 0.9mm Unarmoured JFC , 10 Pair 0.9mm Unarmoured JFC , IAD 24 Port , 10 KVA UPS with Bty Bank , 5 KVA UPS with Bty Bank , 2 KVA UPS Online , 1 KVA UPS online , 12 Volt 90 AHC Bty , 12 Volt 42 AHC Bty , 12 Volt 18 AHC Bty , Chemical Earthing Pits with Rod and chemical with installation , Digging and Laying JFC , Horizontal Directional Drilling HDD and Laying of OFC , DP Box 50 pair with Pillar , DP Box 20 Pair , DP Box 10 Pair , Krone Modules , JFC 50 Pair Jointing Kit , JFC 20 Pair Jointing Kit , JFC 10 Pair Jointing Kit , Jointing Sleeves , Route Marker JFC , Krone Mounting Strip 100 Pair , Krone Mounting Strip 50 Pair , HDPE Duct Pipe NPP 40MM , GI Pipe ISI Brand , Flexible GI ISI Brand , Joint Enclosure 12F , Manhole , Hand Hole , Route Marker OFC , FDMS with Rack 12F , FDMS 6 Port , OFC Tiffin Box 6 Fiber , Pigtail SC , E2K to LC Single Mode 0 db connector 25 mtr , E2K to E2K Single Mode Patch Cord 25 mtr , E2K to SC Single Mode 50 mtr Patch Cord , Optical Power Meter , Splitter 1 In 16 Out , Splitter 2 In 8 Out
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
BHATINDA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | BHATINDA | BHATINDA | - | - | 20 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
OFC 12 Core ADSS 12F
OFC 12 Core ADSS 12F
50 Pair 0.5mm Unarmoured JFC
50 Pair 0.5mm Unarmoured JFC
20 Pair 0.9mm Unarmoured JFC
20 Pair 0.9mm Unarmoured JFC
10 Pair 0.9mm Unarmoured JFC
10 Pair 0.9mm Unarmoured JFC
IAD 24 Port
IAD 24 Port
10 KVA UPS with Bty Bank
10 KVA UPS with Bty Bank
5 KVA UPS with Bty Bank
5 KVA UPS with Bty Bank
2 KVA UPS Online
2 KVA UPS Online
1 KVA UPS online
1 KVA UPS online
12 Volt 90 AHC Bty
12 Volt 90 AHC Bty
12 Volt 42 AHC Bty
12 Volt 42 AHC Bty
12 Volt 18 AHC Bty
12 Volt 18 AHC Bty
Chemical Earthing Pits with Rod and chemical with installation
Chemical Earthing Pits with Rod and chemical with installation
Digging and Laying JFC
Digging and Laying JFC
Horizontal Directional Drilling HDD and Laying of OFC
Horizontal Directional Drilling HDD and Laying of OFC
DP Box 50 pair with Pillar
DP Box 50 pair with Pillar
DP Box 20 Pair
DP Box 20 Pair
DP Box 10 Pair
DP Box 10 Pair
Krone Modules
Krone Modules
JFC 50 Pair Jointing Kit
JFC 50 Pair Jointing Kit
JFC 20 Pair Jointing Kit
JFC 20 Pair Jointing Kit
JFC 10 Pair Jointing Kit
JFC 10 Pair Jointing Kit
Jointing Sleeves
Jointing Sleeves
Route Marker JFC
Route Marker JFC
Krone Mounting Strip 100 Pair
Route Marker JFC
Krone Mounting Strip 50 Pair
Krone Mounting Strip 50 Pair
HDPE Duct Pipe NPP 40MM
HDPE Duct Pipe NPP 40MM
GI Pipe ISI Brand
GI Pipe ISI Brand
Flexible GI ISI Brand
Flexible GI ISI Brand
Joint Enclosure 12F
Joint Enclosure 12F
Manhole
Manhole
Hand Hole
Hand Hole
Route Marker OFC
Route Marker OFC
FDMS with Rack 12F
FDMS with Rack 12F
FDMS 6 Port
FDMS 6 Port
OFC Tiffin Box 6 Fiber
OFC Tiffin Box 6 Fiber
Pigtail SC
Pigtail SC
E2K to LC Single Mode 0 db connector 25 mtr
E2K to LC Single Mode 0 db connector 25 mtr
E2K to E2K Single Mode Patch Cord 25 mtr
E2K to E2K Single Mode Patch Cord 25 mtr
E2K to SC Single Mode 50 mtr Patch Cord
E2K to SC Single Mode 50 mtr Patch Cord
Optical Power Meter
Optical Power Meter
Splitter 1 In 16 Out
Splitter 1 In 16 Out
Splitter 2 In 8 Out
Splitter 2 In 8 Out
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | OFC 12 Core ADSS 12F | OFC 12 Core ADSS 12F | 20 | kms | acctsoffr2 | 180 | |
| 2 | 50 Pair 0.5mm Unarmoured JFC | 50 Pair 0.5mm Unarmoured JFC | 3 | kms | acctsoffr2 | 180 | |
| 3 | 20 Pair 0.9mm Unarmoured JFC | 20 Pair 0.9mm Unarmoured JFC | 4 | kms | acctsoffr2 | 180 | |
| 4 | 10 Pair 0.9mm Unarmoured JFC | 10 Pair 0.9mm Unarmoured JFC | 5 | kms | acctsoffr2 | 180 | |
| 5 | IAD 24 Port | IAD 24 Port | 10 | nos | acctsoffr2 | 180 | |
| 6 | 10 KVA UPS with Bty Bank | 10 KVA UPS with Bty Bank | 4 | nos | acctsoffr2 | 180 | |
| 7 | 5 KVA UPS with Bty Bank | 5 KVA UPS with Bty Bank | 7 | nos | acctsoffr2 | 180 | |
| 8 | 2 KVA UPS Online | 2 KVA UPS Online | 10 | nos | acctsoffr2 | 180 | |
| 9 | 1 KVA UPS online | 1 KVA UPS online | 25 | nos | acctsoffr2 | 180 | |
| 10 | 12 Volt 90 AHC Bty | 12 Volt 90 AHC Bty | 150 | nos | acctsoffr2 | 180 | |
| 11 | 12 Volt 42 AHC Bty | 12 Volt 42 AHC Bty | 260 | nos | acctsoffr2 | 180 | |
| 12 | 12 Volt 18 AHC Bty | 12 Volt 18 AHC Bty | 130 | nos | acctsoffr2 | 180 | |
| 13 | Chemical Earthing Pits with Rod and chemical with installation | Chemical Earthing Pits with Rod and chemical with installation | 20 | nos | acctsoffr2 | 180 | |
| 14 | Digging and Laying JFC | Digging and Laying JFC | 3 | kms | acctsoffr2 | 180 | |
| 15 | Horizontal Directional Drilling HDD and Laying of OFC | Horizontal Directional Drilling HDD and Laying of OFC | 18 | kms | acctsoffr2 | 180 | |
| 16 | DP Box 50 pair with Pillar | DP Box 50 pair with Pillar | 6 | nos | acctsoffr2 | 180 | |
| 17 | DP Box 20 Pair | DP Box 20 Pair | 8 | nos | acctsoffr2 | 180 | |
| 18 | DP Box 10 Pair | DP Box 10 Pair | 10 | nos | acctsoffr2 | 180 | |
| 19 | Krone Modules | Krone Modules | 150 | nos | acctsoffr2 | 180 | |
| 20 | JFC 50 Pair Jointing Kit | JFC 50 Pair Jointing Kit | 12 | nos | acctsoffr2 | 180 | |
| 21 | JFC 20 Pair Jointing Kit | JFC 20 Pair Jointing Kit | 10 | nos | acctsoffr2 | 180 | |
| 22 | JFC 10 Pair Jointing Kit | JFC 10 Pair Jointing Kit | 15 | nos | acctsoffr2 | 180 | |
| 23 | Jointing Sleeves | Jointing Sleeves | 5 | kgs | acctsoffr2 | 180 | |
| 24 | Route Marker JFC | Route Marker JFC | 20 | nos | acctsoffr2 | 180 | |
| 25 | Krone Mounting Strip 100 Pair | Route Marker JFC | 2 | nos | acctsoffr2 | 180 | |
| 26 | Krone Mounting Strip 50 Pair | Krone Mounting Strip 50 Pair | 15 | nos | acctsoffr2 | 180 | |
| 27 | HDPE Duct Pipe NPP 40MM | HDPE Duct Pipe NPP 40MM | 18 | kms | acctsoffr2 | 180 | |
| 28 | GI Pipe ISI Brand | GI Pipe ISI Brand | 90 | mtrs | acctsoffr2 | 180 | |
| 29 | Flexible GI ISI Brand | Flexible GI ISI Brand | 500 | mtrs | acctsoffr2 | 180 | |
| 30 | Joint Enclosure 12F | Joint Enclosure 12F | 20 | nos | acctsoffr2 | 180 | |
| 31 | Manhole | Manhole | 10 | nos | acctsoffr2 | 180 | |
| 32 | Hand Hole | Hand Hole | 20 | nos | acctsoffr2 | 180 | |
| 33 | Route Marker OFC | Route Marker OFC | 100 | nos | acctsoffr2 | 180 | |
| 34 | FDMS with Rack 12F | FDMS with Rack 12F | 15 | nos | acctsoffr2 | 180 | |
| 35 | FDMS 6 Port | FDMS 6 Port | 8 | nos | acctsoffr2 | 180 | |
| 36 | OFC Tiffin Box 6 Fiber | OFC Tiffin Box 6 Fiber | 40 | nos | acctsoffr2 | 180 | |
| 37 | Pigtail SC | Pigtail SC | 40 | nos | acctsoffr2 | 180 | |
| 38 | E2K to LC Single Mode 0 db connector 25 mtr | E2K to LC Single Mode 0 db connector 25 mtr | 100 | nos | acctsoffr2 | 180 | |
| 39 | E2K to E2K Single Mode Patch Cord 25 mtr | E2K to E2K Single Mode Patch Cord 25 mtr | 40 | nos | acctsoffr2 | 180 | |
| 40 | E2K to SC Single Mode 50 mtr Patch Cord | E2K to SC Single Mode 50 mtr Patch Cord | 10 | nos | acctsoffr2 | 180 | |
| 41 | Optical Power Meter | Optical Power Meter | 10 | nos | acctsoffr2 | 180 | |
| 42 | Splitter 1 In 16 Out | Splitter 1 In 16 Out | 10 | nos | acctsoffr2 | 180 | |
| 43 | Splitter 2 In 8 Out | Splitter 2 In 8 Out | 10 | nos | acctsoffr2 | 180 |
Discover companies most likely to bid on this tender
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate certified by Bank
Product Data Sheets
OEM Authorization (if applicable)
Contracts/Experience Certificates demonstrating 3 years Govt supply experience
Bidder undertaking on financial soundness (no liquidation or bankruptcy)
Evidence of turnover (minimum average annual turnover requirement)
Vendor Code Creation documents
Bidders must submit PAN, GSTIN, cancelled cheque and EFT mandate, plus data sheets for all offered items. Demonstrate 3 years of govt/PSU supply experience, provide contracts, and ensure OEM installation capability. EMD is ₹598,532 and 25% quantity variation is allowed as per option clause.
Documents include PAN, GSTIN, cancelled cheque, EFT mandate, product data sheets, OEM authorization if applicable, government contract proofs for 3 years, and turnover evidence. All documents must match the items offered and data sheets to avoid rejection.
Key items cover OFC 12 Core ADSS, JFC assemblies (50/20/10 pairs), IAD 24 Port, multiple UPS banks, 12V battery configurations, chemical earthing pits, HDD/laying of OFC, DP Boxes, Krone modules, mounting strips, HDPE GI pipes, and fiber patch cords with associated testing equipment.
EMD is ₹598,532. The terms specify EMD to be submitted with the bid; payment terms beyond this tender’s scope are defined in the general conditions. Ensure EFT mandates align with bank verification and vendor code creation requirements.
Quantity may increase up to 25% at contracted rates. Delivery period starts from the last date of the original delivery order, with a minimum extension of 30 days for extended quantities, and may extend up to the original delivery period.
Installation, commissioning, testing and training must be performed by OEM-certified resources or OEM-authorized resellers. This ensures compliance with product data sheets and proper configuration of telecom gear and UPS systems.
Bidders must provide data sheets that precisely match product specifications; mismatches may lead to bid rejection. OEM authorization and non-obsolescence confirmation are essential to validate ISI/ISI-equivalent compliance when applicable.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS