TenderDekho Logo
Active GEM

Bokaro Steel Plant PUMP, PISTON procurement Tender 2026 Jharkhand A4VSO-250-DR/3XR specifications

Bid Publish Date

31-Aug-2026, 8:01 pm

Bid End Date

14-Sep-2026, 8:00 pm

Progress

Issue31-Aug-2026, 8:01 pm
AwardPending

Key Highlights

  • Specific OEM authorization required for distributors
  • Two piston pump part numbers: A4VSO-250-DR/3XRPPB-13N00 and A4VSO-250-DR/3XR-VPB13N00
  • GST invoicing must be in consignee name with consignee GSTIN and actual GST rate
  • Nominated Inspection Agency to conduct pre-acceptance inspection

Tender Overview

The procurement opportunity is issued by Bokaro Steel Plant, a unit under the Steel Authority of India Limited, for PUMP, PISTON units with part numbers A4VSO-250-DR/3XRPPB-13N00 and A4VSO-250-DR/3XR-VPB13N00. The scope is limited to the supply of goods, with no BOQ items listed. The tender location is BOKARO, JHARKHAND. The Seller must upload a product data sheet and ensure GST invoice alignment with consignee GSTIN. OEM authorization from the manufacturer is required for distributors. The exact quantity, estimated value, and delivery timeline are not disclosed in the available data, but the bid emphasizes compliance and data-sheet verification. The unique element is the presence of two piston pump part numbers and a structured supplier responsibility framework including inspection and GST invoicing rules.

Technical Specifications & Requirements

  • Product category: PUMP, PISTON for part numbers A4VSO-250-DR/3XRPPB-13N00 and A4VSO-250-DR/3XR-VPB13N00
  • Data Sheet: mandatory to upload with bid; must match offered specifications
  • Manufacturer Authorization: required for OEM/distributor bids, with full details (name, designation, address, email, phone)
  • GST: invoice must be raised in consignee name with consignee GSTIN; GST paid as per actuals or applicable rate, not exceeding quoted GST %
  • Inspection: Nominated Inspection Agency to perform pre-acceptance inspection; agency TBD; buyer may terminate for non-compliance or delivery issues
  • Scope: strictly supply of goods; no service/installation implied
  • Documentation: GST portal screenshot, GST invoice copy, and data sheet alignment

Terms, Conditions & Eligibility

  • EMD and financial terms: not disclosed in the provided data; GST compliance is mandatory
  • Delivery terms: delivery timelines not specified; termination clause exists for non-delivery or delays
  • Sub-contracting: allowed only with buyer consent; ultimate liability remains with seller
  • Payment terms: not specified; GST compliance and invoice rules emphasized
  • Documentation: mandatory submission includes OEM authorization, data sheet, GSTIN details, and GST payment proof
  • Audit/inspection: pre-acceptance inspection by nominated agency; acceptance contingent on conformance to data sheet and BOM
  • Compliance: no explicit BOQ; two piston pump part numbers required; ensure data-sheet matches product

Key Specifications

  • Piston pump units: part numbers A4VSO-250-DR/3XRPPB-13N00 and A4VSO-250-DR/3XR-VPB13N00

  • Data Sheet must align with offered technical parameters

  • OEM authorization required for non-manufacturer bidders

  • GST invoicing must reflect consignee details and GSTIN

  • Pre-acceptance inspection by nominated agency

Terms & Conditions

  • GST compliance with consignee GSTIN and actual rate

  • OEM authorization for distributors

  • Pre-acceptance inspection by NIA

  • Supply of goods only; no installation scope specified

Important Clauses

Payment Terms

GST invoice must be raised in consignee name; payment terms linked to GST compliance and data-sheet conformity.

Delivery Schedule

Delivery timeline not disclosed; termination rights exist for non-delivery or delayed delivery.

Penalties/Liquidated Damages

Termination and liability clauses apply for misrepresentation, non-delivery, or defective goods.

Bidder Eligibility

  • Must provide OEM authorization for piston pump part numbers

  • Must upload complete data sheet matching offered product

  • GST registration and consignee GSTIN alignment required

Tender Data

Bid Details

Quantity

8

Category

PUMP, PISTON, PN: A4VSO-250-DR/3XRPPB-13N00

Bid Type

Two Packet Bid

Bid Validity

160 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

PUMP, PISTON, PN: A4VSO-250-DR/3XRPPB-13N00 , PUMP, PISTON, PN: A4VSO-250-DR/3XR-VPB13N00

Payment Timelines

Payments shall be made to the Seller within 20 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

150

Delivery Locations

1

Delivery Cities

Bokaro

Delivery Pincodes

827001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajkaran Singh827001,DGM(Stores), Stores Department, Steel Gate, Gate No.-9, Bokaro Steel Plant, Bokaro Steel City-827001, JharkhandBokaroJharkhand8270014150-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDBOKARO STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9827830.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bokaro Steel Plant

Office Name

Bslp61

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Data Sheet of the product(s) offered

2

Manufacturer/OEM Authorization form with details

3

GSTIN and GST invoice copy for the consignee

4

GST portal payment screenshot (as applicable)

5

Bidder may need to upload data-sheet verification and compliance certificates

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for Bokaro piston pump tender in Jharkhand 2026

To bid, ensure OEM authorization is provided, upload the data sheet aligning with the part numbers A4VSO-250-DR/3XRPPB-13N00 and A4VSO-250-DR/3XR-VPB13N00, attach GST-compliant invoices in the consignee name, and obtain pre-acceptance inspection via the nominated agency. GST details and data-sheet verification are critical.

What documents are required for piston pump tender in Bokaro

Submit OEM authorization, product data sheet, GSTIN of consignee, GST invoice copy and payment proof, and inspection readiness. Ensure supplier GST compliance and that data sheets reflect exact product specifications for the two A4VSO-250 piston pump part numbers.

What are the delivery terms for the Bokaro piston pump procurement

Delivery terms are not disclosed in the available data; bidders should prepare to meet inspection-driven acceptance by a nominated agency and comply with pre-acceptance inspection requirements before final acceptance.

What standards or certifications are required for these piston pumps

The tender specifies data-sheet alignment and OEM authorization; no explicit ISO/IS standards are listed in the provided data. Suppliers should confirm with the buyer during clarification and ensure product documentation matches the data sheet.

How is GST handled for Bokaro piston pump supply

GST must be charged at applicable rates and invoiced in the consignee's name with the consignee GSTIN. Reimbursement will be as per actuals or applicable rates, up to the quoted GST percentage, and GST payment proof must be uploaded on the GeM portal.

What happens if the delivery is delayed for this procurement

The buyer may terminate the contract in cases of non-delivery or delays, and the seller remains liable for performance under the agreed terms. The inquiry emphasizes timely supply and ability to replace/rectify rejected materials promptly.

What is the scope of supply for this piston pump bid

The scope is strictly the supply of goods; there is no installation or service requirement indicated. Bidders should focus on delivering compliant piston pump units with complete data sheets and OEM authorization documentation.