TenderDekho Logo
Active GEM

Indian Army Crown Wheel with Pinion and MPV Spare Parts Tender Baramulla Jammu & Kashmir 2026

Bid Publish Date

07-Oct-2026, 7:19 pm

Bid End Date

17-Oct-2026, 8:00 pm

Progress

Issue07-Oct-2026, 7:19 pm
AwardPending

Key Highlights

  • • No published itemwise quantities; 13 items collectively form the scope
  • • 25% quantity variation rights during and after contract award
  • • Baramulla, Jammu & Kashmir location governs logistics and delivery expectations
  • • Diversity of MPV spare parts indicates broad fitment and compatibility checks

Tender Overview

The Indian Army (Department of Military Affairs) in Baramulla, Jammu & Kashmir invites bids for an assortment of automotive spares and components, including Crown Wheel with Pinion, Fuel Filter MPV, Water Separator MPV, Oil Filter MPV, Parking Brake Shoe LBPV, Three Way Switch MPV, Side Indicator Assembly MPV, Door Operator Relay with Switch, Shock Absorber for ALS, U-bolt Tata, Brake Cylinder LBPV, and Brake Pad Shoe Front/Rear Marksman. The procurement spans 13 items with no itemized quantities disclosed. The estimated value and EMD are not published. The purchaser reserves a right to adjust quantities by up to 25% of bid quantity at contract award and during the currency of the contract. Location-based logistics and batch delivery are implied, with delivery timelines governed by the option clause. Tender context centers on military vehicle spares and related components for Baramulla supply lines.

Technical Specifications & Requirements

  • Product/serviceNames: Crown Wheel with Pinion; MPV fuel filter; MPV water separator; MPV oil filter; MPV shocks; LBPV brake components; MPV electrical switches; parking shoes; U-bolts; door relays; indicators.
  • BOQ items: total of 13 items; explicit quantities not provided.
  • Delivery: terms reference delivery periods tied to original and extended orders via the option clause; calculation formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Standards/Certifications: none published; bidders should assume standard maintenance/fitment compatibility for military MPV spares.
  • Experience: no explicit technical specs; eligibility to align with government procurement for military vehicle spares.
  • Logistics: Baramulla, JK 193101; installation/fitment support not specified.

Terms, Conditions & Eligibility

  • EMD: not disclosed in terms; bidders should prepare standard security deposit per procurement norms.
  • Quantity adjustments: up to 25% during award and currency of contract.
  • Delivery: aligned with delivery period rules; extended time calculation applies, minimum 30 days.
  • Documentation: common bidder requirements include GST, PAN, experience certificates, financial statements, OEM authorizations, technical bid, and EMD documentation.
  • Penalty/Warranty: not specified; bidders should inquire for typical LD and warranty terms in the formal contract.

Key Specifications

  • Product names and categories: Crown Wheel with Pinion; MPV fuel filter; MPV water separator; MPV oil filter; Parking brake shoe (LBPV); Three-way switch MPV; Side indicator assy MPV; Door operator relay with switch; Shock absorber for ALS; U-bolt Tata; Brake cylinder (LBPV); Brake pad shoe front/rear (Marksman).

  • Quantities: 13 items overall; exact quantities not disclosed in BOQ.

  • Logistics: Procurement location Baramulla, Jammu & Kashmir, 193101.

  • Delivery framework: Option clause allows up to 25% quantity variation; delivery period formula applies with minimum 30 days.

  • Standards/Testing: No specific standards published; assume standard fitment compatibility for MPV spares.

Terms & Conditions

  • 25% quantity variation rights during contract; extended delivery time rules apply

  • Delivery period calculated per original vs increased quantity with minimum 30 days

  • EMD and standard bid documents to be provided as per government norms

Important Clauses

Payment Terms

Not specified in tender data; bidders should prepare to meet standard government terms and verify during bid submission

Delivery Schedule

Delivery period commences from last date of original delivery order; extended period follows option clause, subject to minimum 30 days

Penalties/Liquidated Damages

Not specified in data; bidders should expect LD terms in the contract and confirm at bid stage

Bidder Eligibility

  • Experience in supplying automotive/military vehicle spare parts

  • Ability to meet delivery timelines in remote locations (Baramulla, JK)

  • Demonstrated financial capacity and requisite certifications (GST, PAN, EMD)

Advertisement

Tender Data

Bid Details

Quantity

23

Bid Validity

15 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Crown Wheel with Pinion , Fuel Filter MPV , Water Separator MPV , Oil Filter MPV , Parking Break Shoe LBPV , Three Way Switch MPV , Side Indicator Assy MPV , Door Operator Relay with Switch , Shock Absorber for ALS , U bolt TATA , Break cylinder LBPV , Break Pad Shoe Front Marksman , Break Pad Shoe Rear Marksman

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Baramulla

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BaramullaBaramulla--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9994126.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Crown Wheel with Pinion

Crown Wheel with Pinion

1 nos Delivery: 15 days
#2

Fuel Filter MPV

Fuel Filter MPV

2 nos Delivery: 15 days
#3

Water Separator MPV

Water Separator MPV

2 nos Delivery: 15 days
#4

Oil Filter MPV

Oil Filter MPV

2 nos Delivery: 15 days
#5

Parking Break Shoe LBPV

Parking Break Shoe LBPV

1 set Delivery: 15 days
#6

Three Way Switch MPV

Three Way Switch MPV

2 pkt Delivery: 15 days
#7

Side Indicator Assy MPV

Side Indicator Assy MPV

2 nos Delivery: 15 days
#8

Door Operator Relay with Switch

Door Operator Relay with Switch

2 nos Delivery: 15 days
#9

Shock Absorber for ALS

Shock Absorber for ALS

2 nos Delivery: 15 days
#10

U bolt TATA

U bolt TATA

4 nos Delivery: 15 days
#11

Break cylinder LBPV

Break cylinder LBPV

1 nos Delivery: 15 days
#12

Break Pad Shoe Front Marksman

Break Pad Shoe Front Marksman

1 nos Delivery: 15 days
#13

Break Pad Shoe Rear Marksman

Break Pad Shoe Rear Marksman

1 nos Delivery: 15 days
Advertisement

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar military vehicle spare parts procurement

4

Financial Statements / Turnover statements for last 3 years

5

EMD/Interest Deposit as applicable under government norms

6

Technical Bid Document demonstrating capability to supply MPV spares

7

OEM Authorization Letter (if bidding for branded components)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army MPV spares tender in Baramulla JK 2026?

Bid submission requires GST, PAN, experience certificates, financials, EMD, and technical bid. The 13-item scope includes Crown Wheel with Pinion and MPV filters. Ensure OEM authorizations if branded parts apply, and align delivery plans with the 25% quantity variation clause.

What documents are required for Baramulla MPV parts procurement in 2026?

Prepare GST certificate, PAN card, three years of financials, experience certificates for similar military supply, EMD proof, technical bid, and OEM authorization if applicable. Include proof of capability to supply MPV spares and delivery readiness to Baramulla, JK.

What are the delivery terms for the 13-item MPV spares tender in JK?

Delivery is governed by the option clause; extended delivery may be computed as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Initial delivery schedule aligns with last delivery order date; verify during contract award.

What standards or certifications are required for this Indian Army tender?

No explicit standards are published; bidders should ensure component compatibility with military MPV spares and submit standard compliance documentation. Confirm required certifications (if any) during bid submission and pre-bid queries.

How is EMD amount determined for this Baramulla procurement?

EMD amount is not disclosed in tender data. Bidders should prepare as per government norms, typically a fixed monetary value or a percentage of estimated contract value, and provide online or DD-based security as required by the tender terms.

What items are included in the 13-item MPV spares category for JK tender?

The scope includes Crown Wheel with Pinion, MPV fuel filter, MPV water separator, MPV oil filter, parking brake shoe LBPV, Three Way Switch MPV, Side Indicator Assy MPV, Door Operator Relay with Switch, Shock Absorber for ALS, U-bolt Tata, Brake Cylinder LB PV, and Brake Pad Shoes front/rear Marksman. Quantities are not disclosed.

What is the eligibility criteria for supplying military vehicle spares in Baramulla?

Applicants should demonstrate prior experience in supplying similar MPV spares, possess GST and PAN, provide financial statements for the past three years, and furnish OEM authorization if bidding branded components. Ability to meet delivery timelines is essential forJK-based logistics.

When is the delivery timeline revised under the 25% variation clause in JK tender?

Delivery timelines adjust based on the variation formula. If quantity increases, the new delivery period is calculated proportionally to the original period, with a minimum extension of 30 days. The award contract governs the final schedule and any extensions.

Advertisement