TenderDekho Logo
Active GEM

Open Tender for 1 Head Assembly,2 Handle assembly,3 Cylinder Assembly,4 Upper Valve Assembly,5 Lower valve Assembly in RAIPUR, CHHATTISGARH

Bid Publish Date

05-Oct-2026, 6:11 pm

Bid End Date

20-Oct-2026, 7:00 pm

EMD

₹2,09,119

Value

₹2,09,11,900

Progress

Issue05-Oct-2026, 6:11 pm
AwardPending

A tender has been published for N/a 1 Head Assembly, 2 Handle assembly, 3 Cylinder Assembly, 4 Upper Valve Assembly, 5 Lower valve Assembly, 6 Head-Standard, 7 Handle standard, 8 Telescopic stand, 9 Normal stand, 10 Water tank, 11 Plunger Rod, 12 Handle Axle, 13 Third Plate, 14 Connecting Rod, 15 Socket seamless, 16 Bearing, 17 Hexagonal coupler M 12x1. 75x50, 18 Hex. Bolt M 12x1. 75x40, 19 Hex. Bolt M 12x2. 0, 20 Hex. Nut M 12x1. 75, 21 H. T. Bolt M 10x1. 75x40, 22 Nylock Nut M 10x1. 5, 23 Chain with coupling, 24 Axle washer, 25 Reducer cap, 26 Cast Iron Cylinder Body, 27 Brass Liner-short, 28 Plunger Yoke Body, 29 Plunger Upper Valve, 30 Bucket Spacer, 31 Follower, 32 Check Valve, 33 Check Valve Seat, 34 Rubber Seat Retainer, 35 Pump Bucket, 36 Sealing Ring, 37 Seating for Upper Valve, 38 Seating for Lower Valve in RAIPUR, CHHATTISGARH. Quantity: 352558 by. Submission Deadline: 20-10-2026 19: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

352558

Category

14 Connecting Rod

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

Yes

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1 Head Assembly , 2 Handle assembly , 3 Cylinder Assembly , 4 Upper Valve Assembly , 5 Lower valve Assembly , 6 Head-Standard , 7 Handle standard , 8 Telescopic stand , 9 Normal stand , 10 Water tank , 11 Plunger Rod , 12 Handle Axle , 13 Third Plate , 14 Connecting Rod , 15 Socket seamless , 16 Bearing , 17 Hexagonal coupler M 12x1.75x50 , 18 Hex. Bolt M 12x1.75x40 , 19 Hex. Bolt M 12x2.0 , 20 Hex. Nut M 12x1.75 , 21 H.T. Bolt M 10x1.75x40 , 22 Nylock Nut M 10x1.5 , 23 Chain with coupling , 24 Axle washer , 25 Reducer cap , 26 Cast Iron Cylinder Body , 27 Brass Liner-short , 28 Plunger Yoke Body , 29 Plunger Upper Valve , 30 Bucket Spacer , 31 Follower , 32 Check Valve , 33 Check Valve Seat , 34 Rubber Seat Retainer , 35 Pump Bucket , 36 Sealing Ring , 37 Seating for Upper Valve , 38 Seating for Lower Valve

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Raipur

Delivery Pincodes

492001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anil Kumar492001,O/o Executive Engineer , Public Health Engineering Division, Near Khalsa School, Pandri, RaipurRaipurChhattisgarh49200118745-

Authority Records

PUBLIC HEALTH ENGINEERING DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9973244.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

O/o Engineer-in-choef, Phed, Chhattisgarh, New Raipur

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 38 Items Sign in for GEM prices

#1

1 Head Assembly

Head Assembly as per ATC Prapatra S.No.1 for 12 consignees

187 pieces Delivery: 45 days
#2

2 Handle assembly

Handle assembly as per ATC Prapatra S.No.2 for 12 consignees

238 pieces Delivery: 45 days
#3

3 Cylinder Assembly

Cylinder Assembly as per ATC Prapatra S.No.3 for 12 consignees

712 pieces Delivery: 45 days
#4

4 Upper Valve Assembly

Upper Valve Assembly as per ATC Prapatra S.No.4 for 12 consignees

1,373 pieces Delivery: 45 days
#5

5 Lower valve Assembly

Lower valve Assembly as per ATC Prapatra S.No.5 for 12 consignees

1,388 pieces Delivery: 45 days
#6

6 Head-Standard

Head-Standard as per ATC Prapatra S.No.6 for 12 consignees

159 pieces Delivery: 45 days
#7

7 Handle standard

Handle standard as per ATC Prapatra S.No.7 for 12 consignees

843 pieces Delivery: 45 days
#8

8 Telescopic stand

Telescopic stand standard as per ATC Prapatra S.No.8 for 12 consignees

82 pieces Delivery: 45 days
#9

9 Normal stand

Normal stand standard as per ATC Prapatra S.No.9 for 12 consignees

69 pieces Delivery: 45 days
#10

10 Water tank

Water tank 32 as per ATC Prapatra S.No.10 for 12 consignees

83 pieces Delivery: 45 days
#11

11 Plunger Rod

Plunger Rod as per ATC Prapatra S.No.11 for 12 consignees

340 pieces Delivery: 45 days
#12

12 Handle Axle

Handle Axle as per ATC Prapatra S.No.12 for 12 consignees

5,736 pieces Delivery: 45 days
#13

13 Third Plate

Third Plate as per ATC Prapatra S.No.13 for 12 consignees

495 pieces Delivery: 45 days
#14

14 Connecting Rod

Connecting Rod as per ATC Prapatra S.No.14 for 12 consignees

14,200 pieces Delivery: 45 days
#15

15 Socket seamless

Socket seamless 32 as per ATC Prapatra S.No.15 for 12 consignees

11,065 pieces Delivery: 45 days
#16

16 Bearing

Bearing as per ATC Prapatra S.No.16 for 12 consignees

17,516 pieces Delivery: 45 days
#17

17 Hexagonal coupler M 12x1.75x50

Hexagonal coupler M 12x1.75x50 as per ATC Prapatra S.No.17 for 12 consignees

1,196 pieces Delivery: 45 days
#18

18 Hex. Bolt M 12x1.75x40

Hex. Bolt M 12x1.75x40 as per ATC Prapatra S.No.18 for 12 consignees

37,363 pieces Delivery: 45 days
#19

19 Hex. Bolt M 12x2.0

Hex. Bolt M 12x2.0 as per ATC Prapatra S.No.19 for 12 consignees

16,200 pieces Delivery: 45 days
#20

20 Hex. Nut M 12x1.75

Hex. Nut M 12x1.75 as per ATC Prapatra S.No.20 for 12 consignees

68,801 pieces Delivery: 45 days
#21

21 H.T. Bolt M 10x1.75x40

H.T. Bolt M 10x1.75x40 as per ATC Prapatra S.No. 21 for 12 consignees

13,955 pieces Delivery: 45 days
#22

22 Nylock Nut M 10x1.5

Nylock Nut M 10x1.5 as per ATC Prapatra S.No.22 for 12 consignees

12,672 pieces Delivery: 45 days
#23

23 Chain with coupling

Chain with coupling as per ATC Prapatra S.No. 23 for 12 consignees

13,041 pieces Delivery: 45 days
#24

24 Axle washer

Axle washer as per ATC Prapatra S.No.24 for 12 consignees

10,742 pieces Delivery: 45 days
#25

25 Reducer cap

Reducer cap as per ATC Prapatra S.No.25 for 12 consignees

2,617 pieces Delivery: 45 days
#26

26 Cast Iron Cylinder Body

Brass Liner Standard as per ATC Prapatra S.No. 26 for 12 consignees

1,734 pieces Delivery: 45 days
#27

27 Brass Liner-short

Brass Liner-short as per ATC Prapatra S.No. 27 for 12 consignees

1,418 pieces Delivery: 45 days
#28

28 Plunger Yoke Body

Plunger Yoke Body as per ATC Prapatra S.No. 28 for 12 consignees

999 pieces Delivery: 45 days
#29

29 Plunger Upper Valve

Plunger Upper Valve as per ATC Prapatra S.No. 29 for 12 consignees

832 pieces Delivery: 45 days
#30

30 Bucket Spacer

Bucket Spacer as per ATC Prapatra S.No. 30 for 12 consignees

1,859 pieces Delivery: 45 days
#31

31 Follower

Follower as per ATC Prapatra S.No. 31 for 12 consignees

934 pieces Delivery: 45 days
#32

32 Check Valve

Check Valve as per ATC Prapatra S.No.32 for 12 consignees

995 pieces Delivery: 45 days
#33

33 Check Valve Seat

Check Valve Seat as per ATC Prapatra S.No. 33 for 12 consignees

915 pieces Delivery: 45 days
#34

34 Rubber Seat Retainer

Rubber Seat Retainer as per ATC Prapatra S.No.34 for 12 consignees

913 pieces Delivery: 45 days
#35

35 Pump Bucket

Pump Bucket Standard as per ATC Prapatra S.No.35 for 12 consignees

35,986 pieces Delivery: 45 days
#36

36 Sealing Ring

Sealing Ring Standard as per ATC Prapatra S.No.36 for 12 consignees

26,800 pieces Delivery: 45 days
#37

37 Seating for Upper Valve

Seating for Upper Valve as per ATC Prapatra S.No.37 for 12 consignees

26,720 pieces Delivery: 45 days
#38

38 Seating for Lower Valve

Seating for Lower Valve Standard as per ATC Prapatra S.No.38 for 12 consignees

21,380 pieces Delivery: 45 days

Categories 41

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer